|
Std ID |
Description (Standard Title) |
|
GB/T 27699-2011
|
Steel pipeline in-line inspection technical specification
|
|
GB/T 27866-2011
|
Specification of controlling weld hardness of carbon steel and low alloy steel piping and equipment to prevent sulfide stress cracking
|
|
GB/T 27867-2011
|
Petroleum liquid -- Automatic pipeline sampling
|
|
GB/T 28055-2011
|
Technical standard for hot tapping and plugging on steel pipeline
|
|
GB/T 17286.3-2010
|
Liquid hydrocarbons -- Dynamic measurement -- Proving system for volumetric meters -- Part 3: Pulse interpolation techniques
|
|
GB/T 9109.1-2010
|
Dynamic measurement of crude oil -- General principles
|
|
GB/T 17289-2009
|
Liquid hydrocarbons -- Volumetric measurement by turbine meter systems
|
|
GB/T 23257-2009
|
Polyethylene coating for buried steel pipeline
|
|
GB/T 23258-2009
|
Standard practice controlling internal corrosion in steel pipelines
|
|
GB/T 24259-2009
|
Petroleum and natural gas industries -- Pipeline transportation systems
|
|
GB/T 21391-2008
|
Measurement of natural gas flow by turbine meter
|
|
GB/T 21446-2008
|
Measurement of natural gas flow by means of standard orifice meter
|
|
GB/T 21447-2008
|
Specification for external corrosion control for steel Pipeline
|
|
GB/T 21448-2008
|
Specification of cathodic protection for underground steel pipeline
|
|
GB/T 21246-2007
|
Measurement method for cathodic protection parameters of buried steel pipelines
|
|
GB/T 17286.4-2006
|
Liquid hydrocarbons -- Dynamic measurement -- Proving systems for volumetric meters -- Part 4: Guide for operators of pipe provers
|
|
GB/T 20173-2006
|
Petroleum and natural gas industries -- Pipeline transportation systems -- Pipeline valves
|
|
GB/T 20658-2006
|
Crude petroleum and liquid petroleum products -- Volumetric metering of viscous hydrocarbons
|
|
GB/T 9711.3-2005
|
Petroleum and natural gas industries -- Steel pipe for pipelines -- Technical delivery conditions -- Part 3: Pipes of requirements class C
|
|
GB/T 18603-2001
|
Technical requirements of measuring systems for natural gas
|
|
GB/T 18604-2001
|
Measurement of natural gas flow by ultrasonic flow meter
|
|
GB/T 18273-2000
|
Petroleum and liquid petroleum products. Direct static measurements. Contents of vertical storage tanks. Mass measurement by hydrostatic tank gauging
|
|
GB/T 17745-1999
|
Petroleum and natural gas industries--Care and use of casing and tubing
|
|
GB/T 9711.2-1999
|
Petroleum and natural gas industries-Steel pipe for pipelines-Technical delivery conditions-Part 2: Pipes of requirement class B
|
|
GB/T 17286.2-1998
|
Liquid hydrocarbons. Dynamic measurement. Proving systems for volumetric meters. Part 2: Pipe provers
|
|
GB/T 17286.3-1998
|
Liquid hydrocarbons--Dynamic measurement--Proving systems for volumetric meters--Part 3: Pulse interpolation techniques
|
|
GB/T 17288-1998
|
Liquid hydrocarbons--Volumetric measurement by displacement meter systems other than dispensing pumps
|
|
GB/T 17289-1998
|
Liquid hydrocarbons--Volumetric measurement by turbine meter system
|
|
GB/T 17291-1998
|
Petroleum liquid and gas measurement. Standard reference conditions
|
|
GB/T 9711.1-1997
|
Petroleum and natural gas industries--Steel pipe for pipelines--Technical delivery conditions--Part 1: Pipes of requirements class A
|
|
GB/T 15181-1994
|
Capacity calibration of spherical metal tanks. Strapping method
|
|
GB/T 9711-1988
|
Petroleum and natural gas industries. Steel pipe for pipeline transportation systems
|
|
GB/T 29165.3-2015
|
Petroleum and natural gas industries -- Glass-reinforced plastics (GRP) piping -- Part 3: System design
|
|
GB/T 29165.4-2015
|
Petroleum and natural gas industries -- Glass-reinforced plastics (GRP) piping -- Part 4: Fabrication, installation and operation
|
|
GB/T 29165.1-2022
|
Petroleum and natural gas industries - Glass-reinforced plastics (GRP) piping - Part 1: Vocabulary, symbols, applications and materials
|
|
GB/T 29165.2-2022
|
Petroleum and natural gas industries - Glass-reinforced plastics (GRP) piping - Part 2: Qualification and manufacture
|
|
GB/T 29165.1-2012
|
Petroleum and natural gas industries -- Glass-reinforced plastics (GRP) piping -- Part 1: Vocabulary, symbols, applications and materials
|
|
GB/T 29165.2-2012
|
Petroleum and natural gas industries -- Glass-reinforced plastics (GRP) piping -- Part 2: Qualification and manufacture
|
|
GB/T 44310-2024
|
General design specifications for offshore fixed platform
|
|
GB/T 43327.6-2023
|
Petroleum and natural gas industries - Specific requirements for offshore structures - Part 6: Marine operations
|
|
GB/T 42034-2022
|
Technical specification for floating production storage offloading unit
|
|
GB/T 21445.2-2022
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 2: Unbonded flexible pipe systems for subsea and marine applications
|
|
GB/T 21412.2-2022
|
Petroleum and natural gas industries - Design and operation of subsea production systems - Part 2:UNbonded flexible pipe systems for subsea and marine applications
|
|
GB/T 23511-2021
|
Petroleum and natural gas industries - General requirements for offshore structures
|
|
GB/T 21412.10-2019
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 10: Specification for bonded flexible pipe
|
|
GB/T 21412.11-2019
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 11: Recommended practice for flexible pipe
|
|
GB/T 35987-2018
|
Specification for offshore engineering structure weighing
|
|
GB/T 35989.1-2018
|
Petroleum and natural gas industries -- Floating offshore structures -- Part 1: Monohulls, semi-submersibles and spars
|
|
GB/T 21412.6-2018
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 6: Subsea production control systems
|
|
GB/T 21412.7-2018
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 7: Completion/workover riser systems
|
|
GB/T 21412.15-2017
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 15: Subsea structures and manifolds
|
|
GB/T 21412.5-2017
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical
|
|
GB/T 21412.1-2010
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 1: General requirements and recommendations
|
|
GB/T 21412.5-2010
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 5: Subsea umbilical
|
|
GB/T 21412.8-2010
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 8: Remotely Operated Vehicle (ROV) interfaces on subsea production systems
|
|
GB/T 21412.3-2009
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 3: Through flowline (TFL) systems
|
|
GB/T 21412.6-2009
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 6: Subsea production control systems
|
|
GB/T 21412.9-2009
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 9: Remotely operated tool (ROT) intervention systems
|
|
GB/T 23511-2009
|
General requirements for offshore structures for the oil and gas industry
|
|
GB/T 23803-2009
|
Petroleum and natural gas industries -- Design and installation of piping systems on offshore production platforms
|
|
GB/T 21445.2-2008
|
Petroleum and natural gas industries -- Design and operation of subsea production systems -- Part 2: Flexible pipe systems for subsea and marine applications
|
|
GB/T 20661-2006
|
Petroleum and natural gas industries -- Flexible pipe systems for subsea and marine riser applications
|
|
GB/T 41343-2022
|
Petroleum and natural gas industries - Titanium alloy drill pipe
|
|
GB/T 45134-2025
|
Petroleum drilling and production equipment - Near-bit geosteering drilling systems
|
|
GB/T 23506-2025
|
The gas-fuel power set for oil pruduction drilling site
|
|
GB/T 45966.1-2025
|
Petroleum and natural gas industries - Well integrity - Part 1: Life cycle governance
|
|
GB/T 46212-2025
|
Petroleum drilling and production equipment - Electromagnetic telemetry measurement while drilling
|
|
GB/T 21267-2024
|
Petroleum and natural gas industries - Procedures for testing casing and tubing connections
|
|
GB/T 43673-2024
|
Non-metallic composite coiled tubing with embedded cable
|
|
GB/T 43925-2024
|
Test method for full-scale tensile stress corrosion testing of casing and tubing
|
|
GB/T 44317-2024
|
Thermoplastics lined tubing
|
|
GB/T 44560-2024
|
Metallurgical bonding tubing for petroleum and natural gas industries
|
|
GB/T 44764-2024
|
Petroleum, petrochemical and natural gas industries - Metallic materials resistant to sulfide stress cracking in corrosive petroleum refining environments
|
|
GB/T 22513-2023
|
Petroleum and natural gas drilling and production equipment - Wellhead and tree equipment
|
|
GB/T 19831.3-2023
|
Petroleum and natural gas industries - Casing centralizers - Part 3: Rigid and semi-rigid centralizers
|
|
GB/T 42858-2023
|
Corrosion-resistant alloy coiled tubing
|
|
GB/T 43231-2023
|
Petroleum and natural gas industries - Selection and adaptability evaluation of casing for shale oil and gas wells
|
|
GB/T 19830-2023
|
Petroleum and natural gas industries - Steel pipes for use as casing or tubing for wells
|
|
GB/T 20656-2023
|
Petroleum and natural gas industries - Field inspection of new casing, tubing and drill pipe
|
|
GB/T 23802-2023
|
Petroleum and natural gas industries - Technical delivery conditions of corrosion-resistant alloy seamless tubular products for use as casing, tubing, coupling stock and accessory material
|
|
GB/T 29021-2023
|
Petroleum drilling and production equipment - Beam pumping unit
|
|
GB/T 29549.1-2023
|
Specification for offshore modular drilling rigs on fixed platforms - Part 1: Design
|
|
GB/T 43303-2023
|
Petroleum drilling and production equipment - Sucker rod
|
|
GB/T 43505-2023
|
Ceramic lined tubing
|
|
GB/T 43599-2023
|
Petroleum drilling and production equipment - Evaluation and testing of mechanical cement plugs
|
|
GB/T 20657-2022
|
Petroleum and natural gas industries - Formulae and calculations for the properties of casing, tubing, drill pipe and line pipe used as casing or tubing
|
|
GB/T 22342-2022
|
Petroleum drilling and production equipment - Design, installation, operation, test and maintenance of subsurface safety valve systems
|
|
GB/T 31049-2022
|
Petroleum drilling and production equipment - Top drive system
|
|
GB/T 41066.2-2022
|
Petroleum drilling and production equipment - Offshore semi-submersible drilling unit - Part 2: Construction, installation and commissioning acceptance
|
|
GB/T 41066.3-2022
|
Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 3: Operations and surveys
|
|
GB/T 9253-2022
|
Petroleum and natural gas industries - Threading, gauging and thread inspection of casing, tubing, and line pipe threads
|
|
GB/T 41066.1-2021
|
Petroleum drilling and production equipment - Offshore semisubmersible drilling unit - Part 1: Functional configuration and design
|
|
GB/T 17744-2020
|
Petroleum and natural gas industries - Drilling and well servicing equipment
|
|
GB/T 20174-2019
|
Petroleum drilling and production equipment - Drill-through equipment
|
|
GB/T 37159.2-2019
|
Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 2: Construction installation and commissioning acceptance
|
|
GB/T 25429-2019
|
Petroleum drilling and production equipment - Drill string non-return valve
|
|
GB/T 25430-2019
|
Petroleum drilling and production equipment - Rotating control devices
|
|
GB/T 26507-2019
|
Petroleum drilling and production equipment - Ground oil-gas transportation pump
|
|
GB/T 37159.1-2018
|
Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 1: Functional configuration and design requirements
|
|
GB/T 37159.3-2018
|
Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 3: Operation and surveys
|