Search result: GB/T 23506-2025 (GB/T 23506-2017 Older version)
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 23506-2025 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
The gas-fuel power set for oil pruduction drilling site
| Valid |
GB/T 23506-2025
|
GB/T 23506-2017 | English | 339 |
Add to Cart
|
4 days [Need to translate]
|
The gas-fuel power set for oil production drilling site
| Valid |
GB/T 23506-2017
|
GB/T 23506-2009 | English | 799 |
Add to Cart
|
4 days [Need to translate]
|
The natural gas power set for oil production drilling site
| Obsolete |
GB/T 23506-2009
|
Standard ID | GB/T 23506-2025 (GB/T23506-2025) | Description (Translated English) | The gas-fuel power set for oil pruduction drilling site | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | E92 | Classification of International Standard | 75.180.10 | Word Count Estimation | 18,183 | Date of Issue | 2025-03-28 | Date of Implementation | 10/1/2025 | Older Standard (superseded by this standard) | GB/T 23506-2017 | Issuing agency(ies) | State Administration for Market Regulation, National Standardization Administration |
GB/T 23506-2025.Gas-fired power units for oil well production sites
ICS 75.180.10
CCSE92
National Standard of the People's Republic of China
Replaces GB/T 23506-2017
Gas power unit for oil well production site
Released on 2025-03-28
2025-10-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of contents
Preface III
1 Range 1
2 Normative references 1
3 Terms and Definitions 1
4 Model indication method 2
5 Requirement 2
5.1 General 2
5.2 Standard reference condition 3
5.3 Rated power of unit 4
5.4 Startup Performance 4
5.5 No-load running performance 4
5.6 Clutch function 4
5.7 Output direction switching function 4
5.8 Transmission ratio conversion requirements 4
5.9 Control system functions 4
5.10 Main performance indicators 5
5.11 Load characteristics 5
5.12 Speed regulation performance of the unit to adapt to alternating loads 5
5.13 Sealing 5
5.14 Mechanical structure of the unit 5
5.15 Completeness 6
6 Experiment 6
6.1 Test conditions and requirements 6
6.2 Test methods 6
7 Inspection Rules 9
7.1 Inspection items and measurement parameters 9
7.2 Factory Inspection 11
7.3 Type inspection 11
8 Marking, packaging, transportation and storage 11
8.1 Sign 11
8.2 Packaging, transportation and storage 11
Appendix A (Informative) Information provided by the unit user 13
A.1 Unit installation site conditions 13
A.2 Operating conditions 13
A.3 Gas source conditions 13
A.4 Description of the driven machinery 13
A.5 Other relevant information 13
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document replaces GB/T 23506-2017 "Gas Power Units for Oil Production Wells".
In addition to structural adjustments and editorial changes, the main technical changes are as follows.
--- Changed the representation method of unit model (see Chapter 4, Chapter 4 of the.2017 edition);
--- Deleted the "vibration" requirements for the "normal operating conditions" of the unit [see 5.1.1.2c) of the.2017 edition];
--- Changed the basic requirements for explosion-proof systems of units (see 5.1.1.7, 5.1.1.7 of the.2017 edition);
--- Changed the basic requirements for vehicle-mounted installation of the unit (see 5.1.1.8, 5.1.1.8 of the.2017 edition);
--- Added basic requirements for unit safety and fire protection (see 5.1.1.10 and 5.1.1.11);
--- Added gas supply requirements for "associated gas, casing gas and coalbed methane" (see 5.1.2.2);
--- Changed the fuel requirements (see 5.1.3, 5.1.3 of the.2017 edition);
--- Increased engine oil requirements (see 5.1.4);
--- Added the requirement for rapid cut-off of the control system gas source [see 5.9.1d)];
--- Changed the noise limit requirements (see Table 1, 5.10.1 of the.2017 edition);
--- Deleted the replacement rate requirements for diesel/natural gas dual-fuel generator sets (see 5.10.2 of the.2017 edition);
--- Changed the unit heat rate requirements (see Table 1, 5.10.3 of the.2017 edition);
--- Changed the pollutant emission limit requirements (see Table 1, 5.10.4 of the.2017 edition);
--- Changed the rated slip requirements of the unit (see Table 1, 5.10.5 of the.2017 edition);
--- Deleted the requirements for unit safety and fire protection (see 5.14 and 5.15 of the.2017 edition);
--- Changed the safety protection requirements for components with projectile hazards (5.14.2.2, see 5.16.2.2 of the.2017 edition);
--- Changed the protection requirements and identification requirements for parts that may cause danger (see 5.14.2.3, 5.16.2.3 of the.2017 edition and
5.16.2.4);
--- Changed the requirements for test oil (see 6.1.4, 6.1.4 of the.2017 edition);
--- Added test requirements for oil heating devices (see 6.2.10.3);
--- Added unit thermal balance test requirements (see 6.2.18);
--- Deleted the safety inspection and fire inspection requirements (see 6.3.18 and 6.3.19 of the.2017 edition).
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed and coordinated by the National Technical Committee for Standardization of Petroleum Drilling Equipment and Tools (SAC/TC96).
This document was drafted by. China National Petroleum Corporation Jichai Power Co., Ltd., China National Petroleum Corporation Sichuan Qing Drilling Engineering Co., Ltd. Changqing Drilling
Headquarters, CNPC Bohai Oil Equipment Manufacturing Co., Ltd., Baoji Petroleum Machinery Co., Ltd., China Petroleum Materials Co., Ltd.
company.
The main drafters of this document are. Guo Jinju, Zhang Junmei, Yang Jiacheng, Wang Bifeng, Sun Chenglei, Bai Ying, Chen Xiaoyong, Dang Yonghao, Qu Yongzhe, Cao Xiaoyu,
Yang Sai.
This document was first published in.2009, revised for the first time in.2017, and this is the second revision.
Gas power unit for oil well production site
1 Scope
This document specifies the model representation method, requirements, tests, inspection rules, marking, packaging, transportation, etc. of gas power units in oil production wells.
and storage.
This document applies to the design, manufacture, inspection and acceptance of gas power units (hereinafter referred to as "units") at oil well sites.
The gas-powered units of other equipment and the power units driven by other fuel engines shall be implemented accordingly.
Note. The unit is mainly used to drive onshore oil field equipment such as oil pumping units, crude oil transfer pumps, compressors, and operating lifting machinery (such as workover machines).
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 191 Pictorial markings for packaging, storage and transportation
GB 1589 External dimensions, axle loads and mass limits for vehicles, trailers and vehicle trains
GB/T 4556 Fire protection for reciprocating internal combustion engines
GB/T 6072.1 Performance of reciprocating internal combustion engines Part 1.Calibration and test methods for power, fuel consumption and oil consumption
Additional requirements for general purpose engines
GB/T 6072.3 Reciprocating internal combustion engine performance Part 3.Test measurement
GB/T 6072.5 Performance of reciprocating internal combustion engines Part 5.Torsional vibration
GB/T 6388 Shipping and receiving marks for transport packaging
GB/T 7184 Vibration assessment method for reciprocating internal combustion engines
GB 11122 Diesel Engine Oil
GB/T 14097 Noise limits for reciprocating internal combustion engines
GB/T 14363 Diesel engine oil consumption determination method
GB/T 16471 Size and mass limits for transport packages
GB 19147 Diesel for vehicles
GB/T 20136-2006 General test methods for internal combustion engine power plants
GB/T 20651.2 Safety of reciprocating internal combustion engines Part 2.Spark ignition engines
GB 20891 Emission limits and measurement methods for exhaust pollutants from diesel engines for non-road mobile machinery (China Phase III and IV)
GB/T 21404 General requirements for determination and measurement of internal combustion engine power
GB/T 23821 Mechanical safety Safety distance to prevent upper and lower limbs from touching dangerous areas
NB/T 10301 Thermal balance test method for reciprocating internal combustion gas generator sets
3 Terms and definitions
The following terms and definitions apply to this document.
......
GB/T 23506-2017
The gas-fuel power set for oil pruduction drilling site
ICS 75.180.10
E92
National Standards of People's Republic of China
Replacing GB/T 23506-2009
Oil - fired well site gas - fired power unit
2017-02-28 released
2017-09-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China
China National Standardization Management Committee released
Directory
Preface I
1 range 1
2 normative reference document 1
3 Terms and definitions 2
4 Unit Model Representation Method 2
5 requirements 3
5.1 General 3
5.2 Standard Benchmark Status 3
5.3 Unit rated power 4
5.4 start performance 4
5.5 No-load performance 4
5.6 clutch function 4
5.7 Output Steering Switch Function 4
5.8 transmission ratio conversion requirements 4
5.9 Control system requirements 4
5.10 Main performance index 4
5.11 Load characteristics 5
5.12 unit to adapt to the alternating load speed performance 5
5.13 Sealability 5
5.14 security 5
5.15 fire 5
5.16 Mechanical structure of the unit 5
5.17 sets of 6
6 Test 6
6.1 Test conditions and requirements 6
6.2 Test items and measurement parameters 6
6.3 Test method 7
7 Inspection rules 11
7.1 Factory inspection 11
7.2 Type Inspection 11
8 Marking, packaging, transportation and storage 11
8.1 mark 11
8.2 Packaging, transport and storage 12
Appendix A (informative) Information to be provided by the crew
Preface
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB/T 23506-2009 "Oil-fired well site gas-fired power unit". Compared with GB/T 23506-2009, the main
The technical changes are as follows.
--- modify the standard English name;
- The diesel/natural gas dual fuel power unit (see Chapter 1) is added to the scope of application of the product;
--- increase, modify the definition of terms (see Chapter 3);
- Increased technical requirements for diesel/natural gas dual fuel power units (see 5.10);
- the technical requirements for increasing the unit for automotive and mobile structures (see 5.16.1.3);
- Increased technical requirements for remote control of the unit in the control system (see 6.3.6.14);
--- modified the main performance indicators, adjust the emission limit requirements, noise limits (see 5.10,.2009 version of 5.10);
--- increase the control system function test, unit heat rate test (see 6.3.6, 6.3.12);
--- Appendix A is deleted. Annex B to Appendix A and to adjust some of the contents (see Appendix A, Edition.2009)
Appendix B).
This standard is proposed by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96).
The drafting unit of this standard. China Petroleum Group Ji Chai Power Plant, Sichuan R & F Petroleum Power Equipment Co., Ltd., Chengdu Compressor Factory.
The main drafters of this standard. Wang Yugang, Xu Chuanguo, Wang Lingjin, Ni Xiuyong, party Yonghao, Yu Xiaoyan, Yang Jiacheng, Zhang Guangda, Yang Jin
Oil - fired well site gas - fired power unit
1 Scope
This standard specifies the type and basic parameters, requirements, tests and tests of the gas-fired power plant (hereinafter referred to as "unit")
Rules, signs, packaging, transportation and storage.
This standard is applicable to the design, manufacture, inspection and acceptance of gas-fired power plant and diesel/natural gas dual fuel power unit
Wait. The unit is mainly used to drive the pumping unit, gas extraction machine, crude oil pump, compressor, operation with lifting machinery (such as workover rig)
Oil field equipment. In view of the status of the production site, the gas fuel mentioned in the standard is limited to natural gas (including CNG, LNG)
And casing gas.
Oil and gas wells, other gas-powered units for other equipment, and other fuel-powered power units
Also refer to the implementation.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 191 packaging and storage icon
GB 252 ordinary diesel
GB/T 725 internal combustion engine product name and model preparation rules
GB 1589 Road vehicle profile size, shaft load and quality limit
Method and Method of Air Noise Measurement for Radiation of Reciprocating Internal Combustion Engine
GB 3836.1 Explosive atmospheres - Part 1. General requirements for equipment
GB 4556 reciprocating internal combustion engine fire protection
GB/T 6072.1 Reciprocating internal combustion engine performance - Part 1. Calibration of power, fuel consumption and oil consumption and test methods
Additional requirements for general purpose engines
GB/T 6072.3 Reciprocating internal combustion engine performance - Part 3. Test measurements
GB/T 6072.5 Reciprocating internal combustion engine performance - Part 5. Torsional vibration
GB/T 6388 shipping package collection and delivery mark
GB/T 7184 Medium and low power diesel engine vibration measurement and rating
GB/T 8190 Reciprocating Internal Combustion Engine Emission Measurement
GB 11122 diesel engine oil
GB/T 14363 Diesel engine oil consumption determination method
Dimensions and quality limits for transport packages
Common test method for GB/T .20136 internal combustion engine power station
Safety of reciprocating internal combustion engines - Part 1. Compression - ignition engines GB 20651.1
GB/T 21404 Internal engine engine power determination and measurement methods - General requirements
GB 23821 Safety of the machine to prevent the safety distance of the upper and lower limbs from reaching the hazardous area
Oil and Gas Industry Natural Gas Engine
Oil and Gas Industrial Diesel/Natural Gas Dual Fuel Engine
......
GB/T 23506-2009
The natural gas power set for oil prufuction drilling site
ICS 75.180.10
E92
National Standards of People's Republic of China
Oil and gas field production wells power unit
Posted 2009-04-02
2010-01-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
The Standard Appendix A, Appendix B is an informative annex.
This standard by the national oil drilling equipment and tools for Standardization Technical Committee (SAC/TC96) and focal points.
This standard was drafted. Jinan Diesel Engine Co., Ltd.
The Standard participating units. Jinan Diesel Power Equipment Co., Ltd. Green Energy gas engine manufacturing department, limited R & F through Sichuan Petroleum Power Equipment
the company.
The main drafters of this standard. Ni Xiuyong, Plum, party Yonghao, Wangan Zhong, Xu Zhuanguo, Tian Qiang, Wu Fang, Wang Ling Jin, Liu Dong, Liucai Ling,
Zhang Guangda.
Oil and gas field production wells power unit
1 Scope
This standard specifies the field of oil production wells gas power unit (hereinafter referred to as "Units") of the type and basic parameters, requirements, testing, inspection
Rules and signs, packaging, transportation and storage.
This standard applies to oil production wells gas field power units design, manufacture, inspection and acceptance. The main pumping unit for driving
Machine, gas suction machine, oil pump, gas compressors, mining machinery and other work by lifting oil field equipment. Given the current situation of production wells, standard
Registration gaseous fuel mentioned only limited to natural gas, oil associated gas and casing head gas. Oil extraction wells outside the field used to drive other devices
Preparation of gas-powered unit and other fuel engine driven power unit can also be implemented by reference.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB/T 191 Packaging - Pictorial signs (GB/T 191-2008, ISO 780.1997, MOD)
GB 146.1 standard gauge railway rolling stock limit
GB 146.2 standard gauge railway locomotive building limit
GB/T 1859 Reciprocating internal combustion engines emitted airborne noise - Engineering method and the measurement method (GB/T 1859-2000, idt
ISO 6798.1995)
GB 4556 reciprocating internal combustion fire (GB 4556-2001, idtISO 6826.1997)
GB/T 6072.1-2000 Reciprocating internal combustion engines - Part 1. Standard reference conditions, power, fuel and lubricating oil consumption
Consuming calibration and test methods (idtISO 3046-1.1995)
GB/T 6072.3 reciprocating internal combustion engine performance - Part 3. Test measurements (GB/T 6072.3-2003, ISO 3046-3.
1989, IDT)
GB/T 6072.5 reciprocating internal combustion engines - Performance - Part 5. Torsional vibrations (GB/T 6072.5-2003, ISO 3046-5.
2001, IDT)
GB/T 6388 transport package shipping mark
GB/T 10397 small and medium power diesel engines vibration rating (GB/T 10397-2003, ISO 10816-6.1995, IDT)
GB 11122 diesel oil
GB 12265.1 machinery Safety distances to prevent danger zones being reached upper limbs
GB 12265.2 machinery Safety distances to prevent danger zones being reached lower limbs
GB 20651.1 Reciprocating internal combustion engines - Safety - Part 1. Compression ignition engines
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
By a gas engine and gearbox, torque converter, couplings, clutches, belt drive and other power transmission (send) from the power plant equipment and supporting facilities.
Unit 4 model representation
Unit model representation shown in Figure 1.
......
|