|
US$759.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37159.2-2019: Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 2: Construction installation and commissioning acceptance Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37159.2-2019 | English | 759 |
Add to Cart
|
6 days [Need to translate]
|
Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 2: Construction installation and commissioning acceptance
| Valid |
GB/T 37159.2-2019
|
PDF similar to GB/T 37159.2-2019
Basic data | Standard ID | GB/T 37159.2-2019 (GB/T37159.2-2019) | | Description (Translated English) | Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 2: Construction installation and commissioning acceptance | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | E92 | | Classification of International Standard | 75.180.10 | | Word Count Estimation | 38,384 | | Date of Issue | 2019-03-25 | | Date of Implementation | 2019-10-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37159.2-2019: Petroleum drilling and production equipment -- Offshore self-elevating drilling unit -- Part 2: Construction installation and commissioning acceptance ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Petroleum drilling and production equipment--Offshore self-elevating drilling unit--Part 2. Construction installation and commissioning acceptance
ICS 75.180.10
E92
National Standards of People's Republic of China
Oil and gas drilling equipment
Offshore oil jack-up drilling platform
Part 2. Construction, installation and adjustment
Part 2. Constructioninstalationandcommissioningacceptance
Published on.2019-03-25
2019-10-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword I
1 Scope 1
2 Normative references 1
3 Terms, definitions and abbreviations 2
4 Construction and installation 3
4.1 General requirements 3
4.2 Structural Construction 6
4.3 Power and Power System Installation 12
4.4 Drilling System Installation 13
4.5 Deck and auxiliary machinery 17
4.6 Safety, lifesaving and environmental protection 18
4.7 Living Facilities Installation Requirements 18
4.8 Piping System 19
4.9 Cable System 20
4.10 Weight Monitoring 22
5 Commissioning and acceptance 22
5.1 General 22
5.2 Large-scale test 23
5.3 Power and Electrical Systems 25
5.4 Drilling System 27
5.5 Deck and auxiliary machinery 29
5.6 Safety, lifesaving and environmental protection 29
5.7 Living facilities 30
5.8 Piping system 31
5.9 Acceptance 32
Appendix A (informative) Debugging Safety Risk Analysis Sheet 33
Appendix B (informative) Completion Acceptance Documents and Records 34
Foreword
GB/T 37159 "Petroleum and Natural Gas Drilling Equipment Offshore Oil Jack-up Drilling Platform" is divided into three parts.
--- Part 1. Functional configuration and technical requirements;
--- Part 2. Construction installation and adjustment test;
--- Part 3. Operational inspection.
This part is the second part of GB/T 37159.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part is proposed and managed by the National Petroleum Drilling Equipment and Tools Standardization Technical Committee (SAC/TC96).
This section drafted by. China Oilfield Services Co., Ltd., China Classification Society, Yantai CIMC Raffles Offshore Engineering Co., Ltd., large
Even Shipbuilding Industry Group Co., Ltd., Baoji Petroleum Machinery Co., Ltd., China National Petroleum Corporation Ocean Engineering Co., Ltd., Sichuan Honghua Stone
Oil Equipment Co., Ltd.
The main drafters of this section. Luo You'an, Guo Hongsheng, He Changhai, Wang Haibing, Sun Ruixue, Zhong Ying, Xu Langjun, Zou Fubing, Jiang Fuhong,
Tang Guangyin, Zhang Xiping, Xiong Bingxu, Gao Wei, He Wei, Li Jian.
Oil and gas drilling equipment
Offshore oil jack-up drilling platform
Part 2. Construction, installation and adjustment
1 Scope
This part of GB/T 37159 specifies the construction and equipment installation and commissioning of offshore oil jack-up drilling platforms (hereinafter referred to as “platforms”).
Method, acceptance criteria.
This section applies to the construction and installation, commissioning and acceptance of offshore oil jack-up drilling platforms.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2820.4 Reciprocating internal combustion engine driven alternators - Part 4. Controls and switchgear
GB/T 3836.15 Explosive atmosphere - Part 15. Design, selection and installation of electrical installations
GB/T 4025 Human Machine Interface Marker Identification Basic and Safety Rule Indicators and Encoding Rules for Operating Devices
GB 4053 (all parts) Fixed steel ladders and platform safety requirements
GB 5749 Sanitary Standard for Drinking Water
GB/T 20660 Fire and Explosion Control, Reduction Measures and Guidelines for Offshore Production Facilities in the Oil and Gas Industry
GB/T 31032 Steel Pipe Welding and Acceptance
GB/T 32338 oil and gas industry drilling and workover equipment drilling pump
GB/T 34000 China Shipbuilding Quality Standard
GB 50235 industrial metal pipeline engineering construction specification
CB/T 3035 ship tilt test
CB/T 3728 steel small hatch cover
CB/T 3790 ship pipe processing technical conditions
CB/T 4403 self-elevating platform truss leg construction requirements
SY/T 5612 Oil Drilling Fluid Solid Phase Control Equipment Specification
SY/T 6564 Safety procedures for offshore petroleum operations
SY/T 6868 Anti-spray equipment system for drilling operations
SY/T 6962 offshore drilling unit well control system configuration and installation requirements
SY/T 10010 Electrical system design for fixed and floating offshore oil facilities in non-classified areas and Class I, Division 1 and Category 2 areas
Recommended practices for installation
Technical Regulations for Legal Inspection of Maritime Mobile Platforms of the Maritime Safety Administration of the People's Republic
China Classification Society Materials and Welding Specifications
China Classification Society maritime mobile platform classification specification
ISO 8501-1 - Determination of surface cleanliness of steel substrates - Part 1 . Uncoated steel
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37159.2-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37159.2-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 37159.2-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37159.2-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|