GB/T 45906.9-2025: Substation secondary system - Part 9: Construction specifications
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 45906.9-2025English279 Add to Cart 3 days [Need to translate] Substation secondary system - Part 9: Construction specifications Valid GB/T 45906.9-2025

PDF similar to GB/T 45906.9-2025


Standard similar to GB/T 45906.9-2025

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 45906.10   GB/T 45906.1   GB/T 45906.2   

Basic data

Standard ID GB/T 45906.9-2025 (GB/T45906.9-2025)
Description (Translated English) Substation secondary system - Part 9: Construction specifications
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240.10
Word Count Estimation 14,199
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 45906.9-2025: Substation secondary system - Part 9: Construction specifications

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.9-2025
ICS 29.240.10 CCSF20 National Standard of the People's Republic of China Substation secondary system Part 9.Construction specifications Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Abbreviations 2 5 General Requirements 2 6 Design 3 6.1 General requirements 3 6.2 System Architecture 3 6.3 Device Configuration 3 6.4 Master-Substation Information Interaction 4 6.5 Secondary circuit requirements 4 6.6 Power Requirements 4 6.7 Equipment Layout 5 7 Installation 5 7.1 General requirements 5 7.2 Process Control 5 7.3 Installation process requirements 5 8 Debugging 6 8.1 General requirements 6 8.2 Process Control 6 8.3 Debugging Project Requirements 6 9 Acceptance 7 9.1 General requirements 7 9.2 Process Control 7 9.3 Acceptance Project Requirements 7 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 9 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts. --- Part 1.General requirements; --- Part 2.Data and models; --- Part 3.Communication message specifications; --- Part 4.Network security protection; --- Part 5.Protection, control and related equipment; --- Part 6.Station monitoring system; --- Part 7.Centralized monitoring system; --- Part 8.Electrical operation error prevention; --- Part 9.Construction specifications; --- Part 10.Testing and inspection. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446). This document was drafted by. State Grid Economic and Technological Research Institute Co., Ltd., State Grid Corporation of China, China Electric Power Research Institute Co., Ltd. China Energy Engineering Group Liaoning Electric Power Survey and Design Institute Co., Ltd., China Energy Engineering Group Shanxi Electric Power Survey and Design Institute Co., Ltd. Company, State Grid Shandong Electric Power Company, State Grid Sichuan Electric Power Company, State Grid Fujian Electric Power Company, China Electricity Council Electric Power Development Research Institute Co., Ltd. Company, China Southern Power Grid Co., Ltd., State Grid Liaoning Electric Power Co., Ltd., PowerChina Hebei Electric Power Survey, Design and Research China Electric Power Engineering Group Co., Ltd., Guangdong Electric Power Grid Co., Ltd., China Electric Power Engineering Group Fujian Electric Power Survey and Design Institute Co., Ltd., China Electric Power Engineering Group Hebei Electric Power Engineering Group Co., Ltd. Chongqing Electric Power Company, China Energy Engineering Group Guangdong Electric Power Design Institute Co., Ltd. Inner Mongolia Electric Power (Group) Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Shanxi Electric Power Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Co., Ltd., State Grid Hunan Electric Power Co., Ltd., State Grid Henan Electric Power Co., Ltd., PowerChina Guizhou Electric Power Design Institute Co., Ltd. China Energy Engineering Group Tianjin Electric Power Design Institute Co., Ltd., Ningxia Hui Autonomous Region Electric Power Design Institute Co., Ltd., State Grid Gansu Electric Power Power Company. The main drafters of this document are. Li Jingru, Wu Congying, Yan Peili, Xiao Zhihong, Zhang Chunhui, Jiang Baichao, Pan Yong, Lin Hongbin, Wang Xiaoxu, Guo Yanxia, Chen Zhihui, Guo Yachang, Han Liu, Wang Yudong, Yu Tongwei, Feng Teng, Zhang Zhipeng, Liu Naiqi, Peng Ye, Miao Mei, Liu Yu, Sun Yang, Lü Pengfei, Chang Naichao, Li Yan, Zhang Zhi, Shang Bingyang, Xu Jin, Li Zhongqing, Wang Xiaomin, Chen Ping, Wang Hongbin, Qu Zhanfei, Shi Zhuopeng, Wu Chaohui, Jiang Jing, Liang Zeyong, Liu Yang, Ma Fuhua, Wu Junfei, Lü Tao, Zhao Lei, Wang Zhongqiu, Huang Xiangyuan, Cui Yu, Cao Haiou, Zhang Xiang, Xu Danli, Song Xiaofan, Wu Peng, and Yang Yong.

introduction

In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized. Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards. GB/T 45906 covers the substation secondary system from the aspects of general requirements, equipment system functional requirements and engineering implementation and testing. The system is planned to consist of 10 parts. --- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements. --- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes. --- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service. --- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems. --- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment. --- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc. --- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange and Mutual technical requirements. --- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements. --- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering. System and technical requirements. --- Part 10.Testing and inspection. The purpose is to standardize the general principles and testing of equipment and systems of substation secondary systems. Requirements, etc. Substation secondary system Part 9.Construction specifications

1 Scope

This document specifies the overall requirements, design principles, process control and technical requirements for substation secondary system construction. This document applies to the construction, operation, maintenance and overhaul of substation secondary systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 2887 General Specification for Computer Sites GB/T 7261 Basic test methods for relay protection and safety automatic devices GB 8897.4 Primary batteries Part 4.Safety requirements for lithium batteries GB/T 14285 Technical Specification for Relay Protection and Safety Automatic Devices GB/T 17215.211 Electrical measuring equipment (AC) General requirements, tests and test conditions Part 11.Measuring equipment GB/T 17215.301 Particular requirements for electrical measuring equipment (AC) Part 1.Multifunctional energy meters GB 20840.7 Transformers Part 7.Electronic voltage transformers GB 20840.8 Instrument transformers Part 8.Electronic current transformers GB 23864 Fireproof sealing materials GB/T 36050 Basic provisions for time synchronization of power systems GB/T 36283 General technical requirements for secondary compartments of intelligent substations GB/T 36572 Guidelines for Cybersecurity Protection of Power Monitoring Systems GB 38755 Guidelines for Safety and Stability of Power Systems GB 50169 Specification for construction and acceptance of grounding devices for electrical installation projects GB 50171 Specification for the construction and acceptance of panels, cabinets and secondary circuit wiring for electrical installation projects GB 50172 Specification for Construction and Acceptance of Storage Batteries for Electrical Installation Engineering GB 50217 Design Standard for Power Engineering Cables GB/T 50976 Specification for installation and acceptance of relay protection and secondary circuits GB/T 51420 Intelligent Substation Project Commissioning and Acceptance Standard GB/T 45906.1 Substation secondary systems Part 1.General requirements GB/T 45906.2 Substation secondary systems Part 2.Data and models GB/T 45906.3 Substation secondary system Part 3.Communication message specification GB/T 45906.4 Substation secondary systems Part 4.Network security protection GB/T 45906.5 Substation secondary systems Part 5.Protection, control and related equipment GB/T 45906.6 Substation secondary systems Part 6.Station monitoring system GB/T 45906.7 Substation secondary systems Part 7.Centralized monitoring system GB/T 45906.8 Substation secondary system Part 8.Prevention of electrical operation errors

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45906.9-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 45906.9-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45906.9-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 45906.9-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information