HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB/T > Page536 > GB/T 45906.1-2025                   Home > Standard_List > GB/T > Page536 > GB/T 45906.1-2025

GB/T 45906.1-2025 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.1-2025: Substation secondary system - Part 1: General requirement
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 45906.1-2025English279 Add to Cart 3 days [Need to translate] Substation secondary system - Part 1: General requirement Valid GB/T 45906.1-2025

PDF similar to GB/T 45906.1-2025


Standard similar to GB/T 45906.1-2025

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 45906.10   GB/T 45906.2   GB/T 45906.3   

Basic data

Standard ID GB/T 45906.1-2025 (GB/T45906.1-2025)
Description (Translated English) Substation secondary system - Part 1: General requirement
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240.10
Word Count Estimation 14,11
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 45906.1-2025: Substation secondary system - Part 1: General requirement

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.1-2025
ICS 29.240.10 CCSF20 National Standard of the People's Republic of China Substation secondary system Part 1.General requirements Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 General Requirements 2 6 System Architecture 2 7 Technical Requirements 3 7.1 Reliability 3 7.2 Functional Integration 3 7.3 Information Interaction 3 7.4 Network Security 4 Appendix A (Informative) Typical Architecture of Substation Secondary System 5 References 6 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 1 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts. --- Part 1.General requirements; --- Part 2.Data and models; --- Part 3.Communication message specifications; --- Part 4.Network security protection; --- Part 5.Protection, control and related equipment; --- Part 6.Station monitoring system; --- Part 7.Centralized monitoring system; --- Part 8.Electrical operation error prevention; --- Part 9.Construction specifications; --- Part 10.Testing and inspection. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is issued by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Measuring Relay and Protection Equipment Standardization Technical Committee It is under the jurisdiction of the Static Relay Protection Device Subcommittee of the Standardization Technical Committee (SAC/TC154/SC1). This document was drafted by. State Grid Corporation of China, China Electric Power Research Institute Co., Ltd., China Southern Power Grid Co., Ltd., Inner Mongolia Electric Power (Group) Co., Ltd., State Grid Economic and Technological Research Institute Co., Ltd., Nanjing Nanrui Relay Protection Electric Co., Ltd., State Grid Zhejiang Jiangsu Electric Power Co., Ltd., Xuji Electric Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., State Grid Fujian Electric Power Co., Ltd. Company, State Grid Nanrui Technology Co., Ltd., Anhui Nanrui Jiyuan Power Grid Technology Co., Ltd., Nanrui Group Co., Ltd., State Grid Shandong Electric Power Company, State Grid Qinghai Electric Power Company, State Grid Jiangsu Electric Power Company, North China Electric Power University, Changyuan Shenzhen Ruijibao Automation Co., Ltd., GUODIAN NANJING AUTOMATION CO., LTD. The main drafters of this document are. Li Mingjie, Zhang Zhigang, Shu Zhihuai, Chen Guoping, Dong Yu, Zhou Zexin, Liu Yu, Chang Naichao, Sun Yang, Wang Guochun, Lü Pengfei, Yang Guosheng, Li Zhongqing, Dou Renhui, Dou Xuewei, Liu Qiankuan, Chen Zhaohui, Han Dong, Yan Peili, Li Li, Du Qiwei, Tang Zhenyu, Hu Shaoqian, Liu Dongchao, Fang Wei, Wang Shenqiang, Liu Huihai, Ni Chuankun, Zhou Jieying, Yang Bin, Li Jinsong, Wu Congying, Meng Jiangwen, Bai Jingfen, Lin Pi, Zhou Bin, Peng Shikuan, Yang Kejun, Zhou Hualiang, Qin Hongxia, You Daning, Li Hongzhi, Ge Yaming, Tang Yi, Huang Xiang, Xue Ancheng, Zheng Tao, Yu Weiguo, Li Yuping, Zhang Jiaqi and Liu Changqing.

introduction

In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized. Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards. GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc. The substation secondary system is planned to consist of 10 parts. --- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements. --- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes. --- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service. --- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems. --- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment. --- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc. --- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements. --- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements. --- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering. System and technical requirements. --- Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 1.General requirements

1 Scope

This document specifies the overall requirements, system architecture, reliability requirements, function integration requirements, information exchange requirements and network requirements of the substation secondary system. Network security requirements. This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation secondary systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 40435 Technical Specification for Substation Data Communication Gateways GB/T 45906.5 Substation secondary systems Part 5.Protection, control and related equipment GB/T 45906.6 Substation secondary systems Part 6.Station monitoring system GB/T 45906.7 Substation secondary systems Part 7.Centralized monitoring system GB/T 45906.9 Substation secondary system Part 9.Construction specifications GB/T 45906.10 Substation secondary systems Part 10.Testing and inspection

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 It is composed of equipment and software with functions of collection, measurement, protection, control, communication, monitoring, inspection, metering, etc., which can realize the control of power grid and substation. The main and auxiliary equipment operation monitoring, operation control, abnormal alarm, fault isolation, stability control, safety protection and operation and maintenance management of the station are also provided for the remote main The station provides a system that provides monitoring, operation, maintenance and other support services. 3.2 Equipment that controls, regulates, protects, monitors and measures power grids and primary equipment, and supports the operation, operation and management of these equipment. Management related equipment. Note. Such as data collection and execution equipment, relay protection and safety automatic devices, monitoring host, auxiliary monitoring equipment, metering devices, etc. 3.3 The substation integrated monitoring system with monitoring and patrol functions realizes the functions of relay protection devices, safety automatic devices, synchronous phase measurement It can collect, monitor, control, analyze and manage the information of equipment such as measuring devices, and provide support services for remote master stations such as dispatching master stations. 3.4

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45906.1-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 45906.1-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45906.1-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 45906.1-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information