GB/T 45906.2-2025: Substation secondary system - Part 2: Data and model
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 45906.2-2025 | English | 759 |
Add to Cart
|
6 days [Need to translate]
|
Substation secondary system - Part 2: Data and model
| Valid |
GB/T 45906.2-2025
|
PDF similar to GB/T 45906.2-2025
Basic data
| Standard ID | GB/T 45906.2-2025 (GB/T45906.2-2025) |
| Description (Translated English) | Substation secondary system - Part 2: Data and model |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.240.10 |
| Word Count Estimation | 38,329 |
| Date of Issue | 2025-08-01 |
| Date of Implementation | 2026-02-01 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 45906.2-2025: Substation secondary system - Part 2: Data and model
---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.2-2025
ICS 29.240.10
CCSF20
National Standard of the People's Republic of China
Substation secondary system
Part 2.Data and Models
Released on August 1, 2025
Implementation on February 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Abbreviations 2
5 General Requirements 2
6 Data Requirements 3
6.1 Data Classification 3
6.2 Data Collection and Processing 5
6.3 Data Interaction 7
6.4 Data Quality 8
7 Model Requirements 9
7.1 Model Framework 9
7.2 Equipment Model 10
7.3 Relational Model 11
7.4 Data Objects and Attributes 11
7.5 Naming and Indexing 11
7.6 Format and Syntax 12
8 Model Configuration 12
8.1 Model Configuration Process 12
8.2 System Configuration Tools 13
8.3 Device Configuration Tool 13
Appendix A (Normative) Equipment Type Correspondence Table 14
A.1 Primary equipment and component types correspondence table 14
A.2 Secondary equipment and component types correspondence table 15
A.3 Auxiliary equipment type correspondence table 16
Appendix B (Normative) Device and Relationship Model Elements 18
B.1 Primary Equipment Model 18
B.2 Secondary Equipment Model 18
B.3 Auxiliary equipment model 19
B.4 Topology Model 20
B.5 Network Model 21
B.6 Regional Model 22
B.7 Schematic diagram of building facility model 24
Appendix C (Informative) Implementation based on DL/T 860 (all parts) 26
C.1 Overview 26
C.2 Device Model 26
C.3 Relational Model 29
C.4 Model File 29
Appendix D (Informative) Regional Model Example 30
D.1 Substation area model element name 30
D.2 Cable connection model diagram 30
Reference 32
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 2 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
--- Part 1.General requirements;
--- Part 2.Data and models;
--- Part 3.Communication message specifications;
--- Part 4.Network security protection;
--- Part 5.Protection, control and related equipment;
--- Part 6.Station monitoring system;
--- Part 7.Centralized monitoring system;
--- Part 8.Electrical operation error prevention;
--- Part 9.Construction specifications;
--- Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document was prepared by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Electric Power System Management and Information Exchange
The Standardization Technical Committee (SAC/TC82) will be transferred to this department for coordination.
This document was drafted by. China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, Nanjing NARI Relay Protection Electric Co., Ltd.,
NARI Technology Co., Ltd., GD Nanjing Automation Co., Ltd., XJ Group Co., Ltd., Beijing Sifang Relay Protection Automation
Co., Ltd., Changyuan Shenrui Jibao Automation Co., Ltd., State Grid Shandong Electric Power Company, State Grid Jiangsu Electric Power Company, State Grid He
Fujian Electric Power Co., Ltd., State Grid Fujian Electric Power Co., Ltd., China Southern Power Grid Co., Ltd., Inner Mongolia Electric Power (Group) Co., Ltd.
Ren Company, State Grid Economic and Technological Research Institute Co., Ltd., State Grid Electric Power Research Institute Co., Ltd., and North China Electric Power University.
The main drafters of this document are. Dou Renhui, Shu Zhihuai, Chen Guoping, Hu Shaoqian, Peng Qi, Dai Xiaoxiang, Li Dan, Chang Naichao, Sun Yang, Li Yan, Liu Ge,
Zhao Xinchun, Sun Pengfei, Li Jiejie, Zheng Tao, Te Rigong, Zhang Jin, Dou Xuewei, Lü Juntao, Pan Xianghua, Wang Deqing, Guo Bin, Xu Ning, Ma Bin, Li Jin,
Chen Xu, Han Dong, Wu Congying, Sun Dan, Zhang Qiaobin, Yao Zhiqiang, Fan Chen, Ren Hui, Zhang Haiyan, Luo Laifeng.
introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system
List standards.
GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc.
The substation secondary system is planned to consist of 10 parts.
--- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction,
Network security and other technical requirements.
--- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection
Processing requirements, modeling methods, and model configuration processes.
--- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication
The implementation method of the service.
--- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
--- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment
Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
--- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
--- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and
Mutual technical requirements.
--- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and
Energy, performance and application requirements.
--- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
--- Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems.
Please wait.
Substation secondary system
Part 2.Data and Models
1 Scope
This document specifies the overall requirements, data classification, collection and processing, modeling and model configuration requirements for substation secondary system data and models.
This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation secondary systems.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 33601 Naming specification for general model data of power grid equipment
GB/T 43259.301 Energy Management System Application Programming Interface (EMS-API) Part 301.Common Information Model (CIM)
Base
DL/T 860 (all parts) Power automation communication networks and systems
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
data
A reinterpretable formal representation of information suitable for communication, interpretation, or processing.
[Source. GB/T 5271.1-2000, 01.01.02]
3.2
model
The abstraction of the characteristics of things and the description of them using a certain structure and semantics can be understood and used by different applications.
Note. Model is also called information model or data model.
3.3
devicemodel
A model that describes the composition of a device.
NOTE. The equipment model includes both physical structure and functional structure.
3.4
relationalmodel
A model that describes the connections between devices.
Note. The relationship model includes electrical topology relationships, network connection relationships, regional location relationships, etc.
3.5
component
A component of a device model that describes the physical structural characteristics of the device.