Path:
Home >
GB/T >
Page536 > GB/T 45906.10-2025
Home >
Standard_List >
GB/T >
Page536 > GB/T 45906.10-2025
US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.10-2025: Substation secondary system - Part 10: Test and detection
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 45906.10-2025 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Substation secondary system - Part 10: Test and detection
| Valid |
GB/T 45906.10-2025
|
PDF similar to GB/T 45906.10-2025
Basic data
| Standard ID | GB/T 45906.10-2025 (GB/T45906.10-2025) |
| Description (Translated English) | Substation secondary system - Part 10: Test and detection |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.240.10 |
| Word Count Estimation | 22,282 |
| Date of Issue | 2025-08-01 |
| Date of Implementation | 2026-02-01 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 45906.10-2025: Substation secondary system - Part 10: Test and detection
---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.10-2025
ICS 29.240.10
CCSF20
National Standard of the People's Republic of China
Substation secondary system
Part 10.Testing and inspection
Released on August 1, 2025
Implementation on February 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 3
4 General Requirements 3
5 Test conditions 3
5.1 Environmental conditions for testing 3
5.2 Benchmark conditions for testing 3
6 Type test 4
6.1 Protection control and related equipment 4
6.2 Station Monitoring System 5
6.3 Substation Centralized Monitoring System 5
6.4 Preventing Errors in Electrical Operations
7 Factory Inspection 6
7.1 Protection control and related equipment 6
7.2 Station Monitoring System 8
7.3 Substation Centralized Monitoring System 8
7.4 Preventing Errors in Electrical Operations 8
8 Integration Testing 8
9 On-site inspection 9
9.1 Protection control and related equipment 9
9.2 Station Monitoring System 10
9.3 Substation Centralized Monitoring System 10
9.4 Preventing Errors in Electrical Operations 10
Appendix A (Normative) Substation Secondary System Network Security Detection Method 12
A.1 Ontology Security 12
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 10 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
--- Part 1.General requirements;
--- Part 2.Data and models;
--- Part 3.Communication message specifications;
--- Part 4.Network security protection;
--- Part 5.Protection, control and related equipment;
--- Part 6.Station monitoring system;
--- Part 7.Centralized monitoring system;
--- Part 8.Electrical operation error prevention;
--- Part 9.Construction specifications;
--- Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is issued by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Measuring Relay and Protection Equipment Standardization Technical Committee
It is under the jurisdiction of the Static Relay Protection Device Subcommittee of the Standardization Technical Committee (SAC/TC154/SC1).
This document was drafted by. China Electric Power Research Institute Co., Ltd., State Electric Power Dispatching and Control Center, State Grid Economic and Technological Research Institute
Co., Ltd., State Grid Corporation of China Information and Communications Branch, Guangdong Power Grid Co., Ltd., Yunnan Power Grid Co., Ltd., State Grid Gansu
Provincial Electric Power Company Electric Power Research Institute, State Grid Beijing Electric Power Company, Nanjing NARI Relay Protection Electric Co., Ltd., State Grid NARI Technology Co., Ltd.
Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., Xuji Electric Co., Ltd., Anhui Nanrui Jiyuan Power Grid Technology Co., Ltd.,
Nanjing Electric Automation Co., Ltd. and Changyuan Shenzhen Ruijibao Automation Co., Ltd.
The main drafters of this document are. Yang Guosheng, Liu Huihai, Zhang Jinhu, Liu Yu, Zhou Zexin, Zhang Zhi, Chang Naichao, Meng Jiangwen, Xu Kai, Zhang Xiaoli,
Zhan Rongrong, Li Jinsong, Wang Zhihui, Wang Chunyu, Zhang Haiyan, Zhao Na, Zhang Wei, Wang Yongnian, Liu Wei, Shi Hengchu, Jin Long, Shen Yan, Jia Ling, Yu Yue,
Li Bozhong, Li Jing, Liu Dongchao, Hong Xi, Wu Fangying, Fang Wei, Ma Qianli, Chen Qi, Ling Hao, Li Yalei, Zhao Mingyang, Yan Yiming, and Shen Hongming.
introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system
List standards.
GB/T 45906 covers the substation secondary system from the aspects of general requirements, equipment system functional requirements and engineering implementation and testing.
The system is planned to consist of 10 parts.
--- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction,
Network security and other technical requirements.
--- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection
Processing requirements, modeling methods, and model configuration processes.
--- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication
The implementation method of the service.
--- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
--- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment
Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
--- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
--- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and
Mutual technical requirements.
--- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and
Energy, performance and application requirements.
--- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
--- Part 10.Testing and inspection. The purpose is to standardize the general principles and inspection of substation secondary system equipment and systems.
Require.
Substation secondary system
Part 10.Testing and inspection
1 Scope
This document specifies the protection control and related equipment in the substation secondary system, the station monitoring system, and the substation centralized monitoring system (hereinafter referred to as
Centralized control system, general requirements and test conditions for preventing electrical operation errors, as well as type test, factory inspection, integrated test and on-site
Inspection content, methods and requirements.
This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation secondary systems.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 7261 Basic test methods for relay protection and safety automatic devices
GB/T 13729 Telecontrol Terminal Equipment
GB/T 14285 Technical Specification for Relay Protection and Safety Automatic Devices
GB/T 14598.3 Electrical relays Part 5.Insulation coordination requirements and tests for measuring relays and protection devices
GB/T 14598.301 Technical requirements for continuous recording devices for power systems
GB/T 16814 Synchronous Digital Hierarchy (SDH) optical fiber cable line system test methods
GB/T 17215.211-2021 Electrical measuring equipment (AC) General requirements, tests and test conditions Part 11.Measuring equipment
GB/T 17215.301 Special requirements for multi-function electric energy meters
GB/T 17215.303-2022 Particular requirements for alternating current measuring equipment Part 3.Digital energy meters
GB/T 19520.12 Mechanical structures of electronic equipment - Dimensions of 482.6 mm (19 in) series mechanical structures - Part 3-101.Subracks
and its plug-ins
GB/T 19862-2016 General requirements for power quality monitoring equipment
GB/T 21050-2019 Information security technology - Technical requirements for network switch security
GB/T 20272-2019 Information security technology Operating system security technical requirements
GB/T 20273-2019 Information security technology - Security technical requirements for database management systems
GB/T 26862-2011 Specification for testing of synchronized phasor measurement devices in power systems
GB/T 26864 Dynamic test of relay protection products for power systems
GB/T 26866-2022 Specification for time synchronization system testing of power systems
GB/T 26865.2 Power system real-time dynamic monitoring system Part 2.Data transmission protocol
GB/T 30094 Technical Specification for Industrial Ethernet Switches
GB/T 31994-2015 Technical Specification for Intelligent Telecontrol Gateway
GB/T 34132 General technical requirements for intelligent terminal devices in smart substations
GB/T 34871 Specification for inspection and testing of relay protection for smart substations
GB/T 34943-2017 C/C++ language source code vulnerability testing specification
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 45906.10-2025_English be delivered?
Answer: Upon your order, we will start to translate GB/T 45906.10-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 45906.10-2025_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 45906.10-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.