GB/T 45906.10-2025 English PDF

US$439.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.10-2025: Substation secondary system - Part 10: Test and detection
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 45906.10-2025English439 Add to Cart 4 days [Need to translate] Substation secondary system - Part 10: Test and detection Valid GB/T 45906.10-2025

PDF similar to GB/T 45906.10-2025


Standard similar to GB/T 45906.10-2025

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 45906.1   GB/T 45906.2   GB/T 45906.3   

Basic data

Standard ID GB/T 45906.10-2025 (GB/T45906.10-2025)
Description (Translated English) Substation secondary system - Part 10: Test and detection
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240.10
Word Count Estimation 22,282
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 45906.10-2025: Substation secondary system - Part 10: Test and detection

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.10-2025
ICS 29.240.10 CCSF20 National Standard of the People's Republic of China Substation secondary system Part 10.Testing and inspection Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 3 4 General Requirements 3 5 Test conditions 3 5.1 Environmental conditions for testing 3 5.2 Benchmark conditions for testing 3 6 Type test 4 6.1 Protection control and related equipment 4 6.2 Station Monitoring System 5 6.3 Substation Centralized Monitoring System 5 6.4 Preventing Errors in Electrical Operations 7 Factory Inspection 6 7.1 Protection control and related equipment 6 7.2 Station Monitoring System 8 7.3 Substation Centralized Monitoring System 8 7.4 Preventing Errors in Electrical Operations 8 8 Integration Testing 8 9 On-site inspection 9 9.1 Protection control and related equipment 9 9.2 Station Monitoring System 10 9.3 Substation Centralized Monitoring System 10 9.4 Preventing Errors in Electrical Operations 10 Appendix A (Normative) Substation Secondary System Network Security Detection Method 12 A.1 Ontology Security 12 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 10 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts. --- Part 1.General requirements; --- Part 2.Data and models; --- Part 3.Communication message specifications; --- Part 4.Network security protection; --- Part 5.Protection, control and related equipment; --- Part 6.Station monitoring system; --- Part 7.Centralized monitoring system; --- Part 8.Electrical operation error prevention; --- Part 9.Construction specifications; --- Part 10.Testing and inspection. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is issued by the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Measuring Relay and Protection Equipment Standardization Technical Committee It is under the jurisdiction of the Static Relay Protection Device Subcommittee of the Standardization Technical Committee (SAC/TC154/SC1). This document was drafted by. China Electric Power Research Institute Co., Ltd., State Electric Power Dispatching and Control Center, State Grid Economic and Technological Research Institute Co., Ltd., State Grid Corporation of China Information and Communications Branch, Guangdong Power Grid Co., Ltd., Yunnan Power Grid Co., Ltd., State Grid Gansu Provincial Electric Power Company Electric Power Research Institute, State Grid Beijing Electric Power Company, Nanjing NARI Relay Protection Electric Co., Ltd., State Grid NARI Technology Co., Ltd. Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., Xuji Electric Co., Ltd., Anhui Nanrui Jiyuan Power Grid Technology Co., Ltd., Nanjing Electric Automation Co., Ltd. and Changyuan Shenzhen Ruijibao Automation Co., Ltd. The main drafters of this document are. Yang Guosheng, Liu Huihai, Zhang Jinhu, Liu Yu, Zhou Zexin, Zhang Zhi, Chang Naichao, Meng Jiangwen, Xu Kai, Zhang Xiaoli, Zhan Rongrong, Li Jinsong, Wang Zhihui, Wang Chunyu, Zhang Haiyan, Zhao Na, Zhang Wei, Wang Yongnian, Liu Wei, Shi Hengchu, Jin Long, Shen Yan, Jia Ling, Yu Yue, Li Bozhong, Li Jing, Liu Dongchao, Hong Xi, Wu Fangying, Fang Wei, Ma Qianli, Chen Qi, Ling Hao, Li Yalei, Zhao Mingyang, Yan Yiming, and Shen Hongming.

introduction

In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized. Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards. GB/T 45906 covers the substation secondary system from the aspects of general requirements, equipment system functional requirements and engineering implementation and testing. The system is planned to consist of 10 parts. --- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements. --- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes. --- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service. --- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems. --- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment. --- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc. --- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements. --- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements. --- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering. System and technical requirements. --- Part 10.Testing and inspection. The purpose is to standardize the general principles and inspection of substation secondary system equipment and systems. Require. Substation secondary system Part 10.Testing and inspection

1 Scope

This document specifies the protection control and related equipment in the substation secondary system, the station monitoring system, and the substation centralized monitoring system (hereinafter referred to as Centralized control system, general requirements and test conditions for preventing electrical operation errors, as well as type test, factory inspection, integrated test and on-site Inspection content, methods and requirements. This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation secondary systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 7261 Basic test methods for relay protection and safety automatic devices GB/T 13729 Telecontrol Terminal Equipment GB/T 14285 Technical Specification for Relay Protection and Safety Automatic Devices GB/T 14598.3 Electrical relays Part 5.Insulation coordination requirements and tests for measuring relays and protection devices GB/T 14598.301 Technical requirements for continuous recording devices for power systems GB/T 16814 Synchronous Digital Hierarchy (SDH) optical fiber cable line system test methods GB/T 17215.211-2021 Electrical measuring equipment (AC) General requirements, tests and test conditions Part 11.Measuring equipment GB/T 17215.301 Special requirements for multi-function electric energy meters GB/T 17215.303-2022 Particular requirements for alternating current measuring equipment Part 3.Digital energy meters GB/T 19520.12 Mechanical structures of electronic equipment - Dimensions of 482.6 mm (19 in) series mechanical structures - Part 3-101.Subracks and its plug-ins GB/T 19862-2016 General requirements for power quality monitoring equipment GB/T 21050-2019 Information security technology - Technical requirements for network switch security GB/T 20272-2019 Information security technology Operating system security technical requirements GB/T 20273-2019 Information security technology - Security technical requirements for database management systems GB/T 26862-2011 Specification for testing of synchronized phasor measurement devices in power systems GB/T 26864 Dynamic test of relay protection products for power systems GB/T 26866-2022 Specification for time synchronization system testing of power systems GB/T 26865.2 Power system real-time dynamic monitoring system Part 2.Data transmission protocol GB/T 30094 Technical Specification for Industrial Ethernet Switches GB/T 31994-2015 Technical Specification for Intelligent Telecontrol Gateway GB/T 34132 General technical requirements for intelligent terminal devices in smart substations GB/T 34871 Specification for inspection and testing of relay protection for smart substations GB/T 34943-2017 C/C++ language source code vulnerability testing specification

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45906.10-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 45906.10-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45906.10-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 45906.10-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information