|
Std ID |
Description (Standard Title) |
Detail |
|
GB/T 31960.12-2024
|
Technical specification of power energy efficiency monitoring system - Part 12: Construction guidelines
|
GB/T 31960.12-2024
|
|
GB/T 15321-1994
|
General principle for discharge and utilization technology of ash and slag in power station
|
GB/T 15321-1994
|
|
GB/T 28583-2025
|
Specification of electricity supply service
|
GB/T 28583-2025
|
|
GB/T 45527-2025
|
Technical specification at the project level for assessment of greenhouse gas emission reductions - Power energy substitution projects
|
GB/T 45527-2025
|
|
GB/T 45905.10-2025
|
Electricity spot market operation - Part 10: The evaluation of operation
|
GB/T 45905.10-2025
|
|
GB/T 45905.1-2025
|
Electricity spot market operation - Part 1: Terminology
|
GB/T 45905.1-2025
|
|
GB/T 45905.8-2025
|
Electricity spot market operation - Part 8: Calculation method of multi-period power and energy balance
|
GB/T 45905.8-2025
|
|
GB/T 45906.10-2025
|
Substation secondary system - Part 10: Test and detection
|
GB/T 45906.10-2025
|
|
GB/T 45906.1-2025
|
Substation secondary system - Part 1: General requirement
|
GB/T 45906.1-2025
|
|
GB/T 45906.2-2025
|
Substation secondary system - Part 2: Data and model
|
GB/T 45906.2-2025
|
|
GB/T 45906.3-2025
|
Substation secondary system - Part 3: Communication message specification
|
GB/T 45906.3-2025
|
|
GB/T 45906.6-2025
|
Substation secondary system - Part 6: Substation monitoring and control system
|
GB/T 45906.6-2025
|
|
GB/T 45906.8-2025
|
Substation secondary system - Part 8: Preventing electric mal-operation
|
GB/T 45906.8-2025
|
|
GB/T 45906.9-2025
|
Substation secondary system - Part 9: Construction specifications
|
GB/T 45906.9-2025
|
|
GB/T 19862-2025
|
(General requirements for monitoring equipment of power quality)
|
GB/T 19862-2025
|
|
GB/T 45905.2-2025
|
Electricity spot market operation - Part 2: Provincial technical support system
|
GB/T 45905.2-2025
|
|
GB/T 45905.3-2025
|
Electricity spot market operation - Part 3: Inter provincial technical support system
|
GB/T 45905.3-2025
|
|
GB/T 45905.4-2025
|
Electricity spot market operation - Part 4: Load forecasting
|
GB/T 45905.4-2025
|
|
GB/T 45905.5-2025
|
Electricity spot market operation - Part 5: Calculation method of incorporating intermittent new energy into power system balance
|
GB/T 45905.5-2025
|
|
GB/T 45905.6-2025
|
Electricity spot market operation - Part 6: Frequency regulation capacity management
|
GB/T 45905.6-2025
|
|
GB/T 45905.7-2025
|
Electricity spot market operation - Part 7: Reserve capacity management
|
GB/T 45905.7-2025
|
|
GB/T 45905.9-2025
|
Electricity spot market operation - Part 9: Market power monitoring and mitigation
|
GB/T 45905.9-2025
|
|
GB/T 45906.4-2025
|
Substation secondary system - Part 4: Cyber security protection
|
GB/T 45906.4-2025
|
|
GB/T 45906.5-2025
|
Substation secondary system - Part 5: Protection and control system with their equipment’s requirements
|
GB/T 45906.5-2025
|
|
GB/T 45906.7-2025
|
Substation secondary system - Part 7: Centralized monitoring and control system of substationm
|
GB/T 45906.7-2025
|
|
GB/T 31960.13-2024
|
Technical specification of power energy efficiency monitoring system - Part 13: Field handheld device specifications
|
GB/T 31960.13-2024
|
|
GB/T 32127-2024
|
Directives for monitoring and evaluation of power demand response
|
GB/T 32127-2024
|
|
GB/T 44185.1-2024
|
Guidelines for construction of shore-to-ship power supply system - Part 1: Power grid side
|
GB/T 44185.1-2024
|
|
GB/T 44219-2024
|
Technical requirements of safety protection for demand response system
|
GB/T 44219-2024
|
|
GB/T 44241-2024
|
Virtual power plant management specification
|
GB/T 44241-2024
|
|
GB/T 44260-2024
|
Technical specification for virtual power plant resources configuration and evaluation
|
GB/T 44260-2024
|
|
GB/T 18269-2024
|
Hand tools for live working with 1 kV AC, 1.5 kV DC and below
|
GB/T 18269-2024
|
|
GB/T 44659.2-2024
|
Short-circuit current calculation of renewable energy power generation stations and connection systems - Part 2: Photovoltaic power generation
|
GB/T 44659.2-2024
|
|
GB/T 44659.1-2024
|
Short-circuit current calculation of renewable energy power generation stations and connection systems - Part 1: Wind power generation
|
GB/T 44659.1-2024
|
|
GB/T 44659.3-2024
|
Short-circuit current calculation of renewable energy power generation stations and connection systems - Part 3: Energy storage station
|
GB/T 44659.3-2024
|
|
GB/T 44768-2024
|
Guide for theoretical calculation of distribution network line loss
|
GB/T 44768-2024
|
|
GB/T 15544.1-2023
|
Short-circuit current calculation in three-phase a. c. systems - Part 1: Calculation of currents
|
GB/T 15544.1-2023
|
|
GB/T 43451-2023
|
Guidelines for evaluation of distribution network operation
|
GB/T 43451-2023
|
|
GB/T 31464-2022
|
The grid operation code
|
GB/T 31464-2022
|
|
GB/T 24847-2021
|
Technical guide on 1 000 kV AC system voltage and reactive power
|
GB/T 24847-2021
|
|
GB/T 40284-2021
|
Guide for energy saving test of waste heat recovery system in power plant
|
GB/T 40284-2021
|
|
GB/T 35698.2-2019
|
Calculation of effects of short-circuit currents -- Part 2: Examples of calculation
|
GB/T 35698.2-2019
|
|
GB/T 38332-2019
|
Smart grid consumer automatic demand response - Technical condition of central air conditioning system terminal
|
GB/T 38332-2019
|
|
GB/T 36278-2018
|
Technical Code for Electric Vehicle Charging/Battery Swap Infrastructure Interconnecting to Distribution Network
|
GB/T 36278-2018
|
|
GB/T 36045-2018
|
Supervision specification of unit capacity expansion retrofit for coal-fired power plants
|
GB/T 36045-2018
|
|
GB/T 36050-2018
|
Rules of time synchronization for power systems
|
GB/T 36050-2018
|
|
GB/T 24842-2018
|
Overvoltage and insulation coordination of 1 000 kV UHV AC transmission project
|
GB/T 24842-2018
|
|
GB/T 36571-2018
|
Technical specification for measurement and verification of electric energy and power savings for parallel reactive power compensation project
|
GB/T 36571-2018
|
|
GB/T 36573-2018
|
Technical specification for measurement and verification of electric energy and power savings for voltage step-up operation of power line project
|
GB/T 36573-2018
|
|
GB/T 29328-2018
|
Specific configuration of power supply and self-emergency power supply for important power users
|
GB/T 29328-2018
|
|
GB/T 37016-2018
|
Technical requirements of measurement and verification about power saving in demand response for power users
|
GB/T 37016-2018
|
|
GB/T 37134-2018
|
Guide for ancillary service of grid connected power plants
|
GB/T 37134-2018
|
|
GB/T 37136-2018
|
Specification of operation and maintenance for power user''s power supply and distribution facilities
|
GB/T 37136-2018
|
|
GB/T 33592-2017
|
Specification of operation and controlling for distributed resources connected to power grid
|
GB/T 33592-2017
|
|
GB/T 34116-2017
|
Smart grid consumer automatic demand response -- Distributed air conditioning system terminal technical condition
|
GB/T 34116-2017
|
|
GB/T 15544.3-2017
|
Short-circuit current calculation in three-phase a.c. systems -- Part 3: Data of electrical equipment
|
GB/T 15544.3-2017
|
|
GB/T 35681-2017
|
Function specification of power demand response system
|
GB/T 35681-2017
|
|
GB/T 35698.1-2017
|
Calculation of effects of short-circuit currents -- Part 1: Definitions and calculation methods
|
GB/T 35698.1-2017
|
|
GB/T 15544.4-2017
|
Short-circuit current calculation in three-phase a.c. systems -- Part 4: Currents during two separate simultaneous line-to-earth short circuits and partial short-circuit currents flowing through earth
|
GB/T 15544.4-2017
|
|
GB/T 15544.5-2017
|
Short-circuit current calculation in three-phase a.c. systems -- Part 5: Examples
|
GB/T 15544.5-2017
|
|
GB/T 15544.2-2017
|
Short-circuit current calculation in three-phase a.c. systems -- Part 2: Factors for the calculation of short-circuit currents
|
GB/T 15544.2-2017
|
|
GB/T 19862-2016
|
General requirements for monitoring equipment of power quality
|
GB/T 19862-2016
|
|
GB/T 2900.55-2016
|
Electrotechnical terminology -- Live working
|
GB/T 2900.55-2016
|
|
GB/T 31960.10-2016
|
Technical specification of power energy efficiency monitoring system -- Part 10: Test specification of power energy efficiency monitor terminal
|
GB/T 31960.10-2016
|
|
GB/T 31960.11-2016
|
Technical specification of power energy efficiency monitoring system -- Part 11: Test specification of power energy efficiency information collection and exchange terminal
|
GB/T 31960.11-2016
|
|
GB/T 31960.9-2016
|
Technical specification of power energy efficiency monitoring system -- Part 9: System testing specification
|
GB/T 31960.9-2016
|
|
GB/T 32575-2016
|
Engineering data handover for power plants
|
GB/T 32575-2016
|
|
GB/T 32823-2016
|
General guideline of measurement and verification of electric power and energy savings for energy conservation project of power grid
|
GB/T 32823-2016
|
|
GB/T 32894-2016
|
Technical guide of mode transition for pumped storage unit
|
GB/T 32894-2016
|
|
GB/T 31960.1-2015
|
Technical Specification of Power Energy Efficiency Monitoring System - Part 1: The General Rules
|
GB/T 31960.1-2015
|
|
GB/T 31367-2015
|
Technical guide for energy efficiency evaluation of medium and low voltage power distribution networks
|
GB/T 31367-2015
|
|
GB/T 31464-2015
|
The grid operation code
|
GB/T 31464-2015
|
|
GB/T 31960.2-2015
|
Technical specification of power energy efficiency monitoring system -- Part 2: Function specification of master station
|
GB/T 31960.2-2015
|
|
GB/T 31960.3-2015
|
Technical specification of power energy efficiency monitoring system -- Part 3: Communication protocol
|
GB/T 31960.3-2015
|
|
GB/T 31960.4-2015
|
Technical specification for power energy efficiency monitoring system -- Part 4: Function design specification of substation
|
GB/T 31960.4-2015
|
|
GB/T 31960.5-2015
|
Technical specification of power energy efficiency monitoring system -- Part 5: Design guidelines of master station
|
GB/T 31960.5-2015
|
|
GB/T 31960.6-2015
|
Technical specification of power energy efficiency monitoring system -- Part 6: Technical condition of power energy efficiency information concentrate and exchange terminal
|
GB/T 31960.6-2015
|
|
GB/T 31960.8-2015
|
Technical specification of power energy efficiency monitoring system -- Part 8: Specification of security protection
|
GB/T 31960.8-2015
|
|
GB/T 32127-2015
|
Guide for monitoring effect and comprehensive benefit evaluation of demand response
|
GB/T 32127-2015
|
|
GB/T 15544.1-2013
|
Short-circuit current calculation in three-phase a.c. systems -- Part 1: Calculation of currents
|
GB/T 15544.1-2013
|
|
GB/T 30155-2013
|
Technical guide for smart substation
|
GB/T 30155-2013
|
|
GB/T 28557-2012
|
Regulating evaluation of index on energy saving main parameter for electricity enterprise
|
GB/T 28557-2012
|
|
GB/T 28566-2012
|
Security specification and its evaluation for generating unit interconnection
|
GB/T 28566-2012
|
|
GB/T 28583-2012
|
Specification of electricity supply service
|
GB/T 28583-2012
|
|
GB/T 25099-2010
|
Step-down power saving device on distribution networks
|
GB/T 25099-2010
|
|
GB/T 12326-2008
|
Power quality - Voltage fluctuation and flicker
|
GB/T 12326-2008
|
|
GB/T 14545-2008
|
Washing tools with limited water for live working (short water gun with long water column)
|
GB/T 14545-2008
|
|
GB/T 15632-2008
|
General specification of wire holding tools for live working
|
GB/T 15632-2008
|
|
GB/T 15945-2008
|
Power quality -- Frequency deviation for power system
|
GB/T 15945-2008
|
|
GB/T 18269-2008
|
Live working - Hand tools for use up to 1kV a.c. and 1.5kV d.c.
|
GB/T 18269-2008
|
|
GB/T 12167-2006
|
Aluminium alloy grip clamps of tension wire for live working
|
GB/T 12167-2006
|
|
GB/T 12168-2006
|
Protective covers of insulating material for live working
|
GB/T 12168-2006
|
|
GB/T 19862-2005
|
General requirements for monitoring equipment of power quality
|
GB/T 19862-2005
|
|
GB/T 14545-2003
|
Washing tools with limited quantity water for live working (Short water gun with long water column)
|
GB/T 14545-2003
|
|
GB/T 2900.55-2002
|
Electrotechnical terminology -- Live working
|
GB/T 2900.55-2002
|
|
GB/T 18481-2001
|
Power quality -- Temporary and transient overvoltage
|
GB/T 18481-2001
|
|
GB/T 15543-1995
|
Quality of electric energy supply. Admissible three-phase voltage unbalance factor
|
GB/T 15543-1995
|
|
GB/T 15544-1995
|
Short-circuit current calculation in three-phase a. c. systems
|
GB/T 15544-1995
|
|
GB/T 15945-1995
|
Quality of electric energy supply. Permissible deviation of frequency for power system
|
GB/T 15945-1995
|
|
GB/T 14286-1993
|
Terminology for live working
|
GB/T 14286-1993
|