Path:
Home >
GB/T >
Page536 > GB/T 45906.8-2025
Home >
Standard_List >
GB/T >
Page536 > GB/T 45906.8-2025
US$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.8-2025: Substation secondary system - Part 8: Preventing electric mal-operation
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 45906.8-2025 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Substation secondary system - Part 8: Preventing electric mal-operation
| Valid |
GB/T 45906.8-2025
|
PDF similar to GB/T 45906.8-2025
Basic data
| Standard ID | GB/T 45906.8-2025 (GB/T45906.8-2025) |
| Description (Translated English) | Substation secondary system - Part 8: Preventing electric mal-operation |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.240.10 |
| Word Count Estimation | 14,130 |
| Date of Issue | 2025-08-01 |
| Date of Implementation | 2026-02-01 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 45906.8-2025: Substation secondary system - Part 8: Preventing electric mal-operation
---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.8-2025
ICS 29.240.10
CCSF20
National Standard of the People's Republic of China
Substation secondary system
Part 8.Prevention of electrical errors
Released on August 1, 2025
Implementation on February 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General Requirements 2
5 Functional Architecture 2
6 Functional and performance requirements 2
6.1 Station control layer error prevention 2
6.2 Interval layer error prevention 5
6.3 Process level error prevention 5
6.4 Master Station Error Prevention 5
7 Application Requirements 6
7.1 Basic Requirements 6
7.2 Remote Control Operation Prevention 6
7.3 Preventing errors in sequential control operations
7.4 Preventing errors during local operation
References 8
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 8 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts.
--- Part 1.General requirements;
--- Part 2.Data and models;
--- Part 3.Communication message specifications;
--- Part 4.Network security protection;
--- Part 5.Protection, control and related equipment;
--- Part 6.Station monitoring system;
--- Part 7.Centralized monitoring system;
--- Part 8.Electrical operation error prevention;
--- Part 9.Construction specifications;
--- Part 10.Testing and inspection.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446).
This document was drafted by. State Grid Shandong Electric Power Company, Nanjing Nanrui Relay Protection Electric Co., Ltd., State Grid Corporation of China, State Grid Tianjin Electric Power Company,
Municipal Power Company, State Grid Anhui Electric Power Co., Ltd., State Grid Fujian Electric Power Co., Ltd., Changyuan Shenzhen Ruijibao Automation Co., Ltd., Zhuhai
UTE Electric Power Technology Co., Ltd., Changyuan Gongchuang Electric Power Safety Technology Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd.,
China Electric Power Research Institute Co., Ltd., Xuji Electric Co., Ltd., NARI Nanjing Control System Co., Ltd., NARI
Technology Co., Ltd., China Energy Engineering Group Liaoning Electric Power Survey and Design Institute Co., Ltd., China Southern Power Grid Power Dispatching and Control Center,
China Southern Power Grid Energy Development Research Institute Co., Ltd. and Inner Mongolia Electric Power (Group) Co., Ltd.
The main drafters of this document are. Liu Yuanlong, Teng Jingyu, Dong Yu, Sun Yang, Zhao Yongqiang, Li Yan, Xie Xiaodong, Wang Quan, You Daning, Fan Rongqi, Ge Ning,
Wang Shuying, Zhang Yongwu, Li Yongxi, Ge Liqing, Lin Pi, Wang Anning, Wang Zhijie, Han Maolin, Tian Weiyun, Wang He, Wang Shenqiang, Zhang Wei, Zhao Na,
Zhang Haiting, Han Xiao, Peng Bin, Li Jinsong, Jiang Baichao, Lu Tong, Li Ang, Chang Qing, Wei Lue, Bai Wen, Guo Lijun, He Mei, Li Jin, Liu Kemeng, Leng Xiangbiao,
An Shengdong, Jiang Tao, and Qiao Hongwei.
introduction
In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized.
Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system
List standards.
GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc.
The substation secondary system is planned to consist of 10 parts.
--- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction,
Network security and other technical requirements.
--- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection
Processing requirements, modeling methods, and model configuration processes.
--- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication
The implementation method of the service.
--- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems.
--- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment
Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment.
--- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc.
--- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and
Mutual technical requirements.
--- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and
Energy, performance and application requirements.
--- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering.
System and technical requirements.
--- Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems.
Please wait.
Substation secondary system
Part 8.Prevention of electrical errors
1 Scope
This document specifies the overall requirements, functional architecture, functions and performance, and application requirements for electrical operation error prevention of substation secondary systems.
This document is applicable to the design, development, testing, construction, operation, maintenance and
Maintenance.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB 26860 Electricity Safety Work Regulations - Electrical Parts of Power Plants and Substations
GB/T 36572 Guidelines for Cybersecurity Protection of Power Monitoring Systems
GB/T 40095 Technical specification for measurement and control equipment of intelligent substations
GB/T 45906.4 Substation secondary system Part 4.Network security protection
DL/T 687 General technical requirements for microcomputer-based systems to prevent electrical misoperation
DL/T 1404 Technical Specification for Preventing Electrical Misoperation in Substation Monitoring Systems
3 Terms and Definitions
The terms and definitions defined in DL/T 687 and DL/T 1404 and the following apply to this document.
3.1
Operations that do not comply with the anti-error operation procedures will be locked out.
3.2
preventingmal-operationrulescheck
Determine whether the error prevention rules are met, and if not, lock the operation.
3.3
tagoutinterlocking
On the monitoring system wiring diagram, a signboard with the function of prohibiting the operation of this system is set on the electrical equipment to achieve operation locking.
3.4
Based on the network topology, the operation of circuit breakers, disconnectors and grounding switches can be locked to prevent errors at the master station.
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 45906.8-2025_English be delivered?
Answer: Upon your order, we will start to translate GB/T 45906.8-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 45906.8-2025_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 45906.8-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.