HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB/T > Page536 > GB/T 45906.7-2025                   Home > Standard_List > GB/T > Page536 > GB/T 45906.7-2025

GB/T 45906.7-2025 English PDF

US$359.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.7-2025: Substation secondary system - Part 7: Centralized monitoring and control system of substationm
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 45906.7-2025English359 Add to Cart 4 days [Need to translate] Substation secondary system - Part 7: Centralized monitoring and control system of substationm Valid GB/T 45906.7-2025

PDF similar to GB/T 45906.7-2025


Standard similar to GB/T 45906.7-2025

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 45906.10   GB/T 45906.1   GB/T 45906.2   

Basic data

Standard ID GB/T 45906.7-2025 (GB/T45906.7-2025)
Description (Translated English) Substation secondary system - Part 7: Centralized monitoring and control system of substationm
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240.10
Word Count Estimation 18,110
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 45906.7-2025: Substation secondary system - Part 7: Centralized monitoring and control system of substationm


---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.7-2025
ICS 29.240.10 CCSF20 National Standard of the People's Republic of China Substation secondary system Part 7.Centralized monitoring system control system Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 General Requirements 2 6 System Architecture 2 6.1 Overall Architecture 2 6.2 Hardware and Network Architecture 3 6.3 Software Architecture 3 7 Functional Requirements 4 7.1 Basic Platform 4 7.2 Functional Application 5 8 Information Interaction 7 8.1 Interaction with Substation System 7 8.2 Interaction with the Scheduling System 7 8.3 Interaction with business management system 8 9 Performance Requirements 8 10 Safety Requirements 8 Appendix A (Informative) Typical Hardware Configuration of Centralized Control System 10 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 7 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has published the following parts. --- Part 1.General requirements; --- Part 2.Data and models; --- Part 3.Communication message specifications; --- Part 4.Network security protection; --- Part 5.Protection, control and related equipment; --- Part 6.Station monitoring system; --- Part 7.Centralized monitoring system; --- Part 8.Electrical operation error prevention; --- Part 9.Construction specifications; --- Part 10.Testing and inspection. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Electric Power System Management and its Information It is under the jurisdiction of the Technical Committee for Standardization of Information Exchange (SAC/TC82). This document was drafted by. China Electric Power Research Institute Co., Ltd., State Grid Corporation of China, State Grid Jiangsu Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Fujian Electric Power Co., Ltd., State Grid Sichuan Electric Power Co., Ltd., State Grid Economic and Technological Research Institute Co., Ltd., State Grid Corporation of China North China Branch, State Grid Hebei Electric Power Co., Ltd., China Southern Power Grid Power Dispatching and Control Center, Guangdong Power Dispatching and Control Center of Power Grid Corporation, Inner Mongolia Electric Power (Group) Co., Ltd., State Grid Nanrui Nanjing Control System Co., Ltd., Beijing Sifang Relay Protection Engineering Technology Co., Ltd., Xuji Electric Co., Ltd., Nanjing Nanrui Relay Protection Electric Co., Ltd., Guodian Nanjing Automation Co., Ltd. Limited Company. The main drafters of this document are. Sun Yang, Chen Guoping, Zhang Wei, Li Yan, Zhao Yongqiang, Zhang Jinhu, Hao Baoxin, Li Jinsong, Qian Ping, Wang Deqing, Wu Congying, Yu Yifeng, Zhao Na, Fan Qing, Li Wenzhuo, Lu Tong, He Rui, Li Mengyuan, Zhou Quanyue, Han Liu, Deng Li, Qin Zening, Liu Kemeng, Wu Tianlong, An Shengdong, Li Ang, Sheng Zhenming, Ru Dongwu, Fang Ping, Hu Xunhui, Xu Yanming, Wen Pei, Teng Jingyu, Tan Tingfang, Wu Erke, and Liu Chunlei.

introduction

In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized. Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards. GB/T 46906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc. The substation secondary system consists of 10 parts. --- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements. --- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes. --- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service. --- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems. --- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment. --- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc. --- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements. --- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements. --- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering. System and technical requirements. --- Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 7.Centralized monitoring system

1 Scope

This document specifies the overall requirements, system architecture, functional requirements, and requirements, information interaction, performance requirements and security requirements. This document applies to the design, development, construction, operation, maintenance and overhaul of centralized control systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 22239 Information security technology - Basic requirements for network security level protection GB/T 36572 Guidelines for Cybersecurity Protection of Power Monitoring Systems GB/T 45906.1 Substation secondary systems Part 1.General requirements GB/T 45906.2 Substation secondary systems Part 2.Data and models GB/T 45906.4 Substation secondary systems Part 4.Network security protection GB/T 45906.8 Substation secondary system Part 8.Prevention of electrical operation errors GB 50052 Design Specification for Power Supply and Distribution Systems GB 50174 Design specification for electronic information system rooms GB/T 50980 Design specification for power dispatching and communication center engineering DL/T 476 Power System Real-time Data Communication Application Layer Protocol DL/T 634.5104 Telecontrol equipment and systems Part 5-104.Transmission protocol using the standard transmission protocol set IEC 60870- 5-101 Network Access DL/T 860 (all parts) Power automation communication networks and systems DL/T 890 (all parts) Energy Management System Application Programming Interface DL/T 5430 Design specification for remote monitoring center of unmanned substation

3 Terms and Definitions

The terms and definitions defined in GB/T 45906.1 and the following apply to this document. 3.1 The basic software platform of the centralized monitoring system of substations provides data, models and interface services for the integration and operation of centralized control systems. The basic conditions for the development, operation, communication and resource management of the station's centralized monitoring function application. 3.2 Function application function application Running on the centralized monitoring system basic platform, a business association composed of one or more services is used to complete one or more

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45906.7-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 45906.7-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45906.7-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 45906.7-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information