HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB/T > Page536 > GB/T 45906.6-2025                   Home > Standard_List > GB/T > Page536 > GB/T 45906.6-2025

GB/T 45906.6-2025 English PDF

US$359.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 45906.6-2025: Substation secondary system - Part 6: Substation monitoring and control system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 45906.6-2025English359 Add to Cart 4 days [Need to translate] Substation secondary system - Part 6: Substation monitoring and control system Valid GB/T 45906.6-2025

PDF similar to GB/T 45906.6-2025


Standard similar to GB/T 45906.6-2025

GB/T 36278   GB/T 36050   GB/T 33592   GB/T 45906.10   GB/T 45906.1   GB/T 45906.2   

Basic data

Standard ID GB/T 45906.6-2025 (GB/T45906.6-2025)
Description (Translated English) Substation secondary system - Part 6: Substation monitoring and control system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 29.240.10
Word Count Estimation 18,122
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 45906.6-2025: Substation secondary system - Part 6: Substation monitoring and control system

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45906.6-2025
ICS 29.240.10 CCSF20 National Standard of the People's Republic of China Substation secondary system Part 6.Station Monitoring System Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 2 4 Abbreviations 2 5 General Requirements 2 6 Overall Architecture 2 6.1 System Architecture 2 6.2 System Configuration 3 7 Normal working conditions 3 7.1 Power supply and environmental requirements 3 7.2 Hardware Requirements 3 7.3 Software Requirements 4 8 Functional Requirements 4 8.1 Platform Functions 4 8.2 Monitoring Function 5 8.3 Control Function 6 8.4 Maintenance Function 7 8.5 Patrol Function 8 9 Human-Machine Interface 10 10 Information Interaction10 10.1 Information Interaction within the Site 10.2 Information Interaction with the Master Station 11 Performance Requirements11 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is Part 6 of GB/T 45906 "Substation Secondary Systems". GB/T 45906 has been published in the following parts. --- Part 1.General requirements; --- Part 2.Data and models; --- Part 3.Communication message specifications; --- Part 4.Network security protection; --- Part 5.Protection, control and related equipment; --- Part 6.Station monitoring system; --- Part 7.Centralized monitoring system; --- Part 8.Electrical operation error prevention; --- Part 9.Construction specifications; --- Part 10.Testing and inspection. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446), the National Electric Power System Management and its Information It is under the jurisdiction of the Technical Committee for Standardization of Information Exchange (SAC/TC82). This document was drafted by. State Electric Power Dispatching and Control Center, China Electric Power Research Institute Co., Ltd., China Southern Power Grid Power Dispatching Control Center, Beijing Sifang Relay Protection Engineering Technology Co., Ltd., State Grid Tianjin Electric Power Company, State Grid Jiangsu Electric Power Company, State Grid Liaoning Electric Power Company Provincial Electric Power Co., Ltd., State Grid Corporation of China East China Branch, State Grid Chongqing Electric Power Company, Xuji Electric Co., Ltd., NARI Technology Co., Ltd., Guodian Nanjing Automation Co., Ltd., Nanjing NARI Relay Protection Electric Co., Ltd., Changyuan Shenzhen Ruijie Automation Co., Ltd., Kylin Software Co., Ltd., State Grid Shandong Electric Power Company, State Grid Economic and Technological Research Institute Co., Ltd., Guangxi Power Grid Co., Ltd. The company's Electric Power Research Institute, Inner Mongolia Electric Power (Group) Co., Ltd., and State Grid Hebei Electric Power Co., Ltd. The main drafters of this document are. Chang Naichao, Zhao Na, Li Jin, Wang Guochun, Li Dan, Qin Hongxia, Li Jinsong, Chen Jian, Liu Xiaoping, Zhang Qibing, Wang Shunjiang, Qu Gang, Li Dezhi, Wang Shenqiang, Fang Wei, Zhang Jinhu, Diao Dongyu, Zhang Wei, Li Yalei, Ji Xin, Zhang Haining, Cui Xu, Ge Liqing, Teng Jingyu, Zhu Jiayun, Jia Liwei, Fang Ping, Zhao Mingyang, Li Qiyu, Guo Peng, Han Xinglei, Zhou Shengqi, Wu Congying, Zhou Ke, An Shengdong, Qin Zening, and Fan Ruiyi.

introduction

In order to meet the transformation and development needs of the substation secondary system, the top-level design of the overall architecture, functions, data and equipment of the substation secondary system is realized. Design, promote the optimization and upgrading of new power system equipment manufacturing industry, improve the overall performance and reliability level of substation secondary system, formulate this system List standards. GB/T 45906 "Substation Secondary System" comprehensively covers general requirements, equipment system functional requirements, project implementation and testing, etc. The substation secondary system is planned to consist of 10 parts. --- Part 1.General requirements. The purpose is to standardize the overall requirements and reliability, functional integration, information interaction, Network security and other technical requirements. --- Part 2.Data and Model. The purpose is to standardize the substation secondary system data and model framework, clarify data classification, collection Processing requirements, modeling methods, and model configuration processes. --- Part 3.Communication message specification. The purpose is to standardize the communication protocol set of the substation secondary system, clarify the data objects and communication The implementation method of the service. --- Part 4.Network security protection. The purpose is to standardize the technical requirements for security protection of substation secondary systems. --- Part 5.Protection control and related equipment. The purpose is to standardize substation relay protection and safety automatic devices, automation equipment Technical requirements for power equipment, power metering and power quality equipment, collection and execution equipment, communication equipment and auxiliary monitoring equipment. --- Part 6.Station Monitoring System. The purpose is to standardize the technical requirements of the station monitoring system, including functions, performance, information exchange, etc. --- Part 7.Centralized monitoring system. The purpose is to standardize the system architecture, functions, performance, information exchange, and Mutual technical requirements. --- Part 8.Electrical operation error prevention. The purpose is to standardize the overall requirements, architecture, functions and Energy, performance and application requirements. --- Part 9.Construction Specifications. The purpose is to standardize the overall requirements, design principles, process control and construction of substation secondary system engineering. System and technical requirements. --- Part 10.Testing and inspection. The purpose is to standardize the general principles and requirements for the inspection of substation secondary system equipment and systems. Please wait. Substation secondary system Part 6.Station Monitoring System

1 Scope

This document specifies the overall requirements, overall architecture, normal working conditions, functional requirements, human-machine interface, signal processing, and other aspects of the substation monitoring system. Information interaction and performance requirements. This document applies to the design, development, testing, construction, operation, maintenance and overhaul of substation monitoring systems.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 9813.3 General computer specifications Part 3.Servers GB/T 26865.2 Power System Real-time Dynamic Monitoring System GB/T 33602 General Service Agreement for Power Systems GB/T 34121 Technical Specification for Relay Protection Configuration Tool for Smart Substations GB/T 36572 Guidelines for Cybersecurity Protection of Power Monitoring Systems GB/T 37546 Technical specification for unmanned substation monitoring system GB/T 45906.1 Substation secondary systems Part 1.General requirements GB/T 45906.2 Substation secondary systems Part 2.Data and models GB/T 45906.3 Substation secondary system Part 3.Communication message specification GB/T 45906.4 Substation secondary systems Part 4.Network security protection GB/T 45906.8 Substation secondary system Part 8.Prevention of electrical operation errors DL/T 283.1-2018 Power Video Surveillance Systems and Interfaces Part 1.Technical Requirements DL/T 476 Power System Real-time Data Communication Application Layer Protocol DL/T 634.5101 Telecontrol Equipment and Systems Part 5-101.Transmission Protocol Basic Telecontrol Task Supporting Standard DL/T 634.5104 Telecontrol equipment and systems Part 5-104.Transmission protocol using the standard transmission protocol set IEC 60870- 5-101 Network Access DL/T 667 Telecontrol Equipment and Systems Part 5.Transmission Protocol Section 103.Information Interface Supporting Standard for Relay Protection Equipment DL/T 719 Telecontrol Equipment and Systems Part 5.Transmission Protocol Section 102.Power System Electric Energy Accumulation Transmission Support standard DL/T 860 (all parts) Power automation communication networks and systems DL/T 1146 DL/T 860 Implementation Technical Specifications DL/T 1403 Technical Specification for Intelligent Substation Monitoring System DL/T 2332 Technical Requirements for Intelligent Alarms in Substation Automation Systems

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 45906.6-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 45906.6-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 45906.6-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 45906.6-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information