GB/T 40773-2021: Technical specification of monitoring and control system for auxiliary facilities in substation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 40773-2021English299 Add to Cart 3 days [Need to translate] Technical specification of monitoring and control system for auxiliary facilities in substation Valid GB/T 40773-2021

PDF similar to GB/T 40773-2021


Standard similar to GB/T 40773-2021

GB/T 40588   GB/T 40427   GB/T 40609   GB/T 45418   GB/T 15148   

Basic data

Standard ID GB/T 40773-2021 (GB/T40773-2021)
Description (Translated English) Technical specification of monitoring and control system for auxiliary facilities in substation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F21
Word Count Estimation 16,152
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 40773-2021: Technical specification of monitoring and control system for auxiliary facilities in substation


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of monitoring and control system for auxiliary facilities in substation ICS 29.240.01 CCSF21 National Standards of People's Republic of China Technical Specification for Monitoring System of Substation Auxiliary Facilities Released on 2021-10-11 2022-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 System composition and requirements 2 5 Functional requirements 2 6 Performance requirements 5 7 Safety protection requirements 6 8 Power and environmental requirements 6 9 Test method 7 Appendix A (informative) Schematic diagram of the structure of the monitoring system for the auxiliary facilities of the substation 12

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" Drafting. Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents. This document was proposed by the China Electricity Council. This document is under the jurisdiction of the National Power System Management and Information Exchange Standardization Technical Committee (SAC/TC82). Drafting organizations of this document. Guodian Nanjing Automation Co., Ltd., Anhui Nanrui Jiyuan Grid Technology Co., Ltd., State Power Dispatching Control Center, China Southern Power Grid Power Dispatching Control Center, NARI Group Co., Ltd., China Electric Power Research Institute Co., Ltd., State Power Grid East China Branch, State Grid Jilin Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd. Research Institute, Guangdong Power Grid Co., Ltd. Electric Power Research Institute, State Grid Sichuan Electric Power Company Electric Power Research Institute, State Grid Zhejiang Provincial Electric Power Co., Ltd. Taizhou Power Supply Company, Zhejiang Dahua Technology Co., Ltd., Hangzhou Hikvision Digital Technology Co., Ltd. The main drafters of this document. Ji Ling, Tian Xiaofeng, Wang Yongfu, Du Qiwei, Zhou Bin, Jiang Yanjun, Liu Wenbiao, Zuo Jianxun, Lu Tianjian, Zhang Ximing, Dou Renhui, Li Jinsong, Pan Yongwei, Yao Nan, Yang Song, Yin Jun, Hu Chunchao, Zheng Yongkang, Wang Zhouhong, Ren Qun, Jiang Zhizhou. Technical Specification for Monitoring System of Substation Auxiliary Facilities

1 Scope

This document specifies the composition, functional requirements, performance requirements, safety protection, power supply, environmental requirements and experiment method. This document is applicable to the design, manufacture, construction, test and acceptance of the monitoring system for auxiliary facilities of substations.

2 Normative references

The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to This document. GB/T 2887 General Specification for Computer Site GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test GB/T 17626.5 Electromagnetic compatibility test and measurement technology surge (impact) immunity test GB/T 17626.6 Electromagnetic compatibility test and measurement technology Radio frequency field induced conducted disturbance immunity GB/T 17626.8 Electromagnetic compatibility test and measurement technology Power frequency magnetic field immunity test GB/T 30155 Technical Guidelines for Smart Substations GB/T 33602 Power System General Service Agreement GB/T 36572 Electric Power Monitoring System Network Security Protection Guidelines DL/T 283.1 Power Video Monitoring System and Interface Part 1.Technical Requirements DL/T 634.5104 Telecontrol equipment and system Part 5-104.Transmission protocol adopts IEC 60870- standard transmission protocol set 5-101 network access DL/T 860 (all parts) Electric power automation communication network and system DL/T 1403 Technical Specification for Intelligent Substation Monitoring System DL/T 5149 Design Regulations for Substation Monitoring System GA/T 367 Technical Requirements for Video Security Monitoring System

3 Terms and definitions

GB/T 2887, GB/T 30155, DL/T 283.1, DL/T 1403, GA/T 367 and the following terms and definitions are applicable to This document. 3.1 Monitoring and control system for auxiliary facilities in substation Through system integration and information sharing, the fire protection, security guards, power monitoring, environmental monitoring, lighting control and video in the substation are realized A comprehensive monitoring system for information collection, analysis, monitoring, operation and visual display of auxiliary facilities such as monitoring.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 40773-2021_English be delivered?

Answer: Upon your order, we will start to translate GB/T 40773-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 40773-2021_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 40773-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.