Path: Home > GB/T > Page723 > GB/T 28815-2025 || Home > Standard_List > GB/T > Page723 > GB/T 28815-2025
Price & DeliveryUS$379.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 28815-2025: Technical requirements for master station of real-time dynamic monitoring system of power system Status: Valid
GB/T 28815: Evolution and historical versions
| Std ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status |
| GB/T 28815-2025 | English | 379 |
Add to Cart
|
4 days [Need to translate]
|
Technical requirements for master station of real-time dynamic monitoring system of power system
| Valid |
| GB/T 28815-2012 | English | 369 |
Add to Cart
|
3 days [Need to translate]
|
Specification for master station of real-time dynamics monitoring system for power systems
| Valid |
Basic data | Standard ID | GB/T 28815-2025 (GB/T28815-2025) | | Description (Translated English) | Technical requirements for master station of real-time dynamic monitoring system of power system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F21 | | Classification of International Standard | 29.240.01 | | Word Count Estimation | 18,191 | | Date of Issue | 2025-12-02 | | Date of Implementation | 2026-07-01 | | Older Standard (superseded by this standard) | GB/T 28815-2012 | | Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 28815-2025: Technical requirements for master station of real-time dynamic monitoring system of power system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.240.01
CCSF21
National Standards of the People's Republic of China
Replaces GB/T 28815-2012
Technical requirements for real-time dynamic monitoring master station of power system
Published on 2025-12-02
Implemented on July 1, 2026
State Administration for Market Regulation
The State Administration for Standardization issued a statement.
Table of contents
Preface III
1.Scope 1
2 Normative References 1
3.Terms and Definitions 1
4.Abbreviations 2
5.General Requirements 2
6.Basic Functional Requirements 3
7 Application Functional Requirements 6
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents".
Drafting.
This document supersedes GB/T 28815-2012 "Technical Specification for Real-time Dynamic Monitoring Master Station of Power System" and is consistent with GB/T 28815-2012.
Compared to previous versions, aside from structural adjustments and editorial changes, the main technical changes are as follows.
a) A new chapter, "Terms and Definitions" (see Chapter 3), and a new chapter, "Abbreviations" (see Chapter 4), have been added;
b) Change "General Requirements" to "General Requirements" and incorporate the relevant content from the.2012 version (see Chapter 5,.2012 version).
Chapters 3 and 4); change "System Functions" to "Basic Functional Requirements" and incorporate the relevant content from the.2012 version.
(See Chapter 6, Chapter 5 of the.2012 edition); Change "Application Functionality" to "Application Functionality Requirements", and include the relevant content from the.2012 edition.
The revised version is included (see Chapter 7, Chapter 6 of the.2012 edition);
c) Added "Data Acquisition" content (see 6.1.2);
d) Added requirements for "data quality monitoring and statistics" (see 6.2), "data interaction and sharing" (see 6.3), and "offline files of main and sub-sites".
"Interaction" requirement (see 6.4);
e) The monitored content has been expanded (see 7.1.1);
f) Requirements for locating oscillation disturbance sources and identifying spurious oscillations have been added (see 7.2.1.1);
g) Added monitoring and analysis requirements for "subsynchronous oscillation and supersynchronous oscillation" (see 7.2.2) and "medium-high frequency oscillation" monitoring and analysis requirements.
(See 7.2.3);
h) Added "DC fault" identification requirements (see 7.3.1.4);
i) The requirement for "active online testing of primary frequency modulation" has been added (see 7.4.2);
j) Added the requirement of "online evaluation of grid connection performance of new energy power plants and energy storage power stations" (see 7.4.4);
k) Added the requirement for "harmonic and interharmonic analysis and statistics" (see 7.6);
l) The sections "Test Methods" (see Chapter 7 of the.2012 edition), "Inspection Rules" (see Chapter 8 of the.2012 edition), and "Marking, Packaging" have been removed.
The contents of "loading, transportation and storage" (see Chapter 9 of the.2012 edition).
Please note that some content in this document may involve patents. The issuing organization of this document assumes no responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee on Standardization of Power System Management and Information Exchange (SAC/TC82).
This document was drafted by. State Grid Henan Electric Power Research Institute and China Power Engineering Consulting Group North China Electric Power Design Institute.
Limited Company, China Electric Power Research Institute Co., Ltd., NARI Technology Co., Ltd., National Power Dispatch and Control Center, Beijing Sifang
Relay Protection Engineering Technology Co., Ltd., State Grid Electric Power Research Institute Co., Ltd., China Southern Power Dispatch and Control Center, North China Electric Power University, and other relevant institutions.
State Grid Jiangsu Electric Power Co., Ltd., State Grid Henan Electric Power Co., Ltd., Nanjing NARI Relay Protection & Automation Co., Ltd., and China Power Precision Engineering Co., Ltd.
State Grid Sichuan Electric Power Research Institute, State Grid Shandong Electric Power Research Institute, State Grid Zhejiang Electric Power Co., Ltd.
The company's partners include Shaoxing Power Supply Company, Beijing Jiaotong University, Shenyang University of Technology, State Grid Corporation of China North China Branch, and Guodian Nanjing Automation Co., Ltd.
Limited Liability Company, State Grid Jiangxi Electric Power Co., Ltd., Shanghai Kuanyu Industrial Network Equipment Co., Ltd., and Changyuan Shenrui Relay Protection Automation Co., Ltd.
The main drafters of this document are. Zhang Daonong, Li Qiang, Bi Tianshu, Yu Yuehai, Zhang Jiangnan, Li Jin, Chang Naichao, Xie Xiaodong, Xu Yong, and Wang Yongfu.
Chang Guanghui, Liu Dong, Bian Baoyin, Shi Lin, Chen Li, Zhang Xiao, Feng Shilin, Wen Fuguang, Wu Po, Xu Feiyang, Yuan Mingjun, Chen Kai, Xia Chenglin, Zhang Haidong
Song Kun, Liang Zhengtang, Zhang Lizong, Xia Mingchao, Chen Qifang, Pei Maolin, Yang Mengjuan, Liu Hao, Liu Hui.
The release history of this document and the document it replaces is as follows.
---First published in.2012 as GB/T 28815-2012;
---This is the first revision.
Technical requirements for real-time dynamic monitoring master station of power system
1 Scope
This document specifies the overall requirements, basic functional requirements, and application functional requirements for the real-time dynamic monitoring master station of the power system.
This document applies to real-time dynamic monitoring master stations of power systems installed in power grid dispatching agencies at all levels. It also applies to power generation groups and other enterprises.
The main monitoring station shall follow suit.
2 Normative references
The contents of the following documents, through normative references within the text, constitute essential provisions of this document. Dated citations are not included.
For references to documents, only the version corresponding to that date applies to this document; for undated references, the latest version (including all amendments) applies.
This document.
GB/T 2887 General Specifications for Computer Venues
GB/T 22239 Information Security Technology - Basic Requirements for Network Security Level Protection
GB/T 26865.2 Real-time dynamic monitoring system for power systems - Part 2.Data transmission protocol
GB/T 36572 Guidelines for Network Security Protection of Power Monitoring Systems
GB/T 40595 Technical Specifications and Test Guidelines for Primary Frequency Regulation of Grid-Connected Power Sources
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
A system for monitoring and analyzing the dynamic processes of power systems based on synchronous phasor measurement, broadband measurement, and communication technologies.
Note. Includes the main site and sub-sites.
3.2
power system
Synchronous phasor measurement devices/wideband measurement devices and phasor datasets installed in the same power plant, substation, converter station, or energy storage power station
A collection of concentrators/wideband data concentrators.
Note. This is abbreviated as real-time dynamic monitoring substation or substation for power system.
3.3
power system
Computer systems and related software used to receive and forward data from substations, and to perform storage, management, analysis, alarm, and decision-making functions.
Note. Abbreviated as Power System Real-time Dynamic Monitoring Master Station or Master Station.
3.4
Wide-frequency oscillation
Oscillations in the power grid at frequencies ranging from a few tenths of a hertz to several kilohertz are non-rated frequencies.

Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28815-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 28815-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 28815-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28815-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 28815-2025?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 28815-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|