|
Std ID |
Description (Standard Title) |
Detail |
|
NB/T 10323-2019
|
(Test procedures for distributed photovoltaic power generation grid-connected interface device)
|
NB/T 10323-2019
|
|
NB/T 10324-2019
|
(Technical regulations for high-voltage ride-through detection of photovoltaic power stations)
|
NB/T 10324-2019
|
|
NB/T 10325-2019
|
(Technical specifications of mobile testing platform for photovoltaic modules)
|
NB/T 10325-2019
|
|
NB/T 10326-2019
|
Code for operating and overhauling of excitation system of small hydropower units
|
NB/T 10326-2019
|
|
NB/T 10327-2019
|
Low-voltage active three-phase unbalanced load regulator
|
NB/T 10327-2019
|
|
NB/T 10328-2019
|
Heat-shrinkable polyolefin tubing for high-voltage copper bus-bar of electric vehicles
|
NB/T 10328-2019
|
|
NB/T 10329-2019
|
DC fuse-links for the protection of electric vehicles propelled by lithium-ion traction battery
|
NB/T 10329-2019
|
|
NB/T 10330-2019
|
DC contactors for electrical vehicle
|
NB/T 10330-2019
|
|
NB/T 10331-2019
|
Multi-function commutation switch
|
NB/T 10331-2019
|
|
NB/T 10332-2019
|
(Design specification of roller compacted concrete gravity dam)
|
NB/T 10332-2019
|
|
NB/T 10333-2019
|
(Code for design of traffic road in hydropower project)
|
NB/T 10333-2019
|
|
NB/T 10334-2019
|
(Specification for investigation and evaluation of hydraulic resources)
|
NB/T 10334-2019
|
|
NB/T 10335-2019
|
(Code for design of RCC arch dam)
|
NB/T 10335-2019
|
|
NB/T 10336-2019
|
(Specification for geological survey of small and medium hydropower projects)
|
NB/T 10336-2019
|
|
NB/T 10337-2019
|
(Procedures for preparing pre-feasibility study report of hydropower project)
|
NB/T 10337-2019
|
|
NB/T 10338-2019
|
(Code for defining the scope of land acquisition treatment for hydropower project construction)
|
NB/T 10338-2019
|
|
NB/T 10339-2019
|
(Regulations for engineering geological survey of hydropower project dam site)
|
NB/T 10339-2019
|
|
NB/T 10340-2019
|
(Hydropower project pit prospecting regulations)
|
NB/T 10340-2019
|
|
NB/T 10341.1-2019
|
(Design specification for hoist of hydropower project. Part 1: Design specification for fixed hoist)
|
NB/T 10341.1-2019
|
|
NB/T 10341.2-2019
|
(Code for design of hoist of hydropower project. Part 2: Code for design of mobile hoist)
|
NB/T 10341.2-2019
|
|
NB/T 10341.3-2019
|
(Design specification for hoist of hydropower project. Part 3: Design specification for screw hoist)
|
NB/T 10341.3-2019
|
|
NB/T 10342-2019
|
(Guidelines for design of hydropower station regulation assurance)
|
NB/T 10342-2019
|
|
NB/T 10343-2019
|
(Technical specification for soft soil foundation treatment of hydropower projects)
|
NB/T 10343-2019
|
|
NB/T 10344-2019
|
(Code for design of water and soil conservation in hydropower projects)
|
NB/T 10344-2019
|
|
NB/T 10345-2019
|
(Code for selection and layout design of high-voltage electrical equipment in hydropower plants)
|
NB/T 10345-2019
|
|
NB/T 10346-2019
|
(Code for landscape planning and design of hydropower projects)
|
NB/T 10346-2019
|
|
NB/T 10347-2019
|
(Code for environmental impact assessment of hydropower projects)
|
NB/T 10347-2019
|
|
NB/T 10348-2019
|
(Regulations for Compiling Emergency Response Plan for Water Storage of Hydropower Project Reservoir)
|
NB/T 10348-2019
|
|
NB/T 10349-2019
|
(Technical regulations for safety inspection of pressure steel pipes)
|
NB/T 10349-2019
|
|
NB/T 10350-2019
|
(Guidelines for sustainable hydropower evaluation)
|
NB/T 10350-2019
|
|
NB/T 10351-2019
|
(Regulations for compiling general planning and design report of seismic monitoring of hydropower project reservoir)
|
NB/T 10351-2019
|
|
NB/T 10352-2019
|
(Code for energy-saving design of hydropower projects)
|
NB/T 10352-2019
|
|
NB/T 10353-2019
|
(Technical Regulations for Solar Energy Evaluation of Solar Power Generation Project)
|
NB/T 10353-2019
|
|
NB/T 10354-2019
|
(Long tube trailer)
|
NB/T 10354-2019
|
|
NB/T 10355-2019
|
(Tube bundle container)
|
NB/T 10355-2019
|
|
NB/T 10356-2019
|
(Blowout prevention method for underground coal mine drilling)
|
NB/T 10356-2019
|
|
NB/T 10357-2019
|
(Technical specification for filter-type bladder sealing)
|
NB/T 10357-2019
|
|
NB/T 10358-2019
|
(General technical requirements for filter-type bladder sealer)
|
NB/T 10358-2019
|
|
NB/T 10359-2019
|
(Coal and gas outburst alarm technology method)
|
NB/T 10359-2019
|
|
NB/T 10360-2019
|
(Technical specification for coal mine gas and geological map management)
|
NB/T 10360-2019
|
|
NB/T 10361-2019
|
(Real-time monitoring technology method of mine ventilation network)
|
NB/T 10361-2019
|
|
NB/T 10362-2019
|
(Code for design of coal mine low concentration gas oxidation utilization engineering)
|
NB/T 10362-2019
|
|
NB/T 10363-2019
|
(Determination method of evaluation index of coal mine gas drainage)
|
NB/T 10363-2019
|
|
NB/T 10364-2019
|
(Prediction method of gas emission in fully mechanized top coal caving face)
|
NB/T 10364-2019
|
|
NB/T 10365-2019
|
(Code for design of vertical shaft for gas drainage in coal mining affected area)
|
NB/T 10365-2019
|
|
NB/T 10369-2019
|
(Mine plastic sheathed thermal insulation steel pipe)
|
NB/T 10369-2019
|
|
NB/T 10370-2019
|
(Specification for performance inspection of welded stainless steel pipes for coal mine gas drainage)
|
NB/T 10370-2019
|
|
NB/T 10371-2019
|
(Specification for performance inspection of spiral welded steel pipe with coating (cladding) reinforcing rib for coal mine gas drainage)
|
NB/T 10371-2019
|
|
NB/T 10372-2019
|
(Steel-plastic composite protective net for coal mine underground)
|
NB/T 10372-2019
|
|
NB/T 10373-2019
|
(Basic requirements for the preparation of green mining construction plans for coal mining)
|
NB/T 10373-2019
|
|
NB/T 10374-2019
|
(Technical requirements for coal mine engineering mining green mines)
|
NB/T 10374-2019
|
|
NB/T 10375-2019
|
(Code for evaluation of coal mine engineering green mine construction)
|
NB/T 10375-2019
|
|
NB/T 10376-2019
|
(General technical requirements for closed coal storage facility safety testing system)
|
NB/T 10376-2019
|
|
NB/T 10377-2019
|
(Technical Requirements for Smooth Blasting of Air Pillar Charged in Coal Mine Rock Roadway)
|
NB/T 10377-2019
|
|
NB/T 10378-2019
|
(Technical specification for fluidized bed drying of fine coal)
|
NB/T 10378-2019
|
|
NB/T 10379-2019
|
(Technical requirements for a pulverized coal preparation system for efficient industrial boilers)
|
NB/T 10379-2019
|
|
NB/T 10380-2019
|
(General technical requirements for pulverized coal for high-efficiency industrial boilers)
|
NB/T 10380-2019
|
|
NB/T 10381-2019
|
(Technical Specification of Hydrogen and Oxygen Stable Isotope Tracing for Coal Mine Water Filling Source)
|
NB/T 10381-2019
|
|
NB/T 10382-2019
|
(Technical specification for testing and inspection of flotation compound agent for coal preparation)
|
NB/T 10382-2019
|
|
NB/T 10383-2019
|
(Mine hydraulic self-moving trackless equipment train)
|
NB/T 10383-2019
|
|
NB/T 10384-2019
|
(Integral casting scraper conveyor)
|
NB/T 10384-2019
|
|
NB/T 20005.10-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 10: Grade 2 and 3 steel welded with filler metals)
|
NB/T 20005.10-2019
|
|
NB/T 20005.1-2019
|
(Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants. Part 1: Grade 1, 2, 3 forgings)
|
NB/T 20005.1-2019
|
|
NB/T 20005.13-2019
|
(Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants Part 13: Seamless steel tubes for heat transfer tubes of Class 2 and 3 heat exchangers)
|
NB/T 20005.13-2019
|
|
NB/T 20005.14-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 14: Butt-welded seamless pipe fittings of grades 2 and 3)
|
NB/T 20005.14-2019
|
|
NB/T 20005.15-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 15: Grade 2 and 3 pipe fittings welded with filler metals)
|
NB/T 20005.15-2019
|
|
NB/T 20005.16-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 16: Elbow for main steam system)
|
NB/T 20005.16-2019
|
|
NB/T 20005.2-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants. Part 2: Tube sheet forgings for heat exchangers of grades 2 and 3)
|
NB/T 20005.2-2019
|
|
NB/T 20005.4-2019
|
(Carbon steel and low alloy steel for pressurized water reactor nuclear power plants Part 4: Forging and rolling parts for main steam system, main feedwater flow control system, auxiliary feedwater system and steam turbine bypass system)
|
NB/T 20005.4-2019
|
|
NB/T 20005.5-2019
|
(Carbon steel and low-alloy steel for pressurized water reactor nuclear power plants. Part 5: Class 1, 2, and 3 pressure castings)
|
NB/T 20005.5-2019
|
|
NB/T 20006.15-2019
|
(Alloy steel for pressurized water reactor nuclear power plants Part 15: Manganese for pressure boundary)
|
NB/T 20006.15-2019
|
|
NB/T 20006.18-2019
|
(Alloy steel for pressurized water reactor nuclear power plants Part 18: Manganese-nickel-molybdenum alloy steel forgings for the overall top cover of reactor pressure vessels)
|
NB/T 20006.18-2019
|
|
NB/T 20006.19-2019
|
(Alloy steel for pressurized water reactor nuclear power plants Part 19: Manganese-nickel-molybdenum alloy steel forgings for reactor coolant pump casings)
|
NB/T 20006.19-2019
|
|
NB/T 20006.44-2019
|
(Alloy steel for pressurized water reactor nuclear power plants Part 44: Alloy steel rods for safety grade equipment bolts)
|
NB/T 20006.44-2019
|
|
NB/T 20007.10-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 10: Cold-rolled and cold-drawn austenitic stainless steel seamless steel tubes for heat transfer tubes of Class 2 and 3 heat exchangers)
|
NB/T 20007.10-2019
|
|
NB/T 20007.11-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 11: Grade 1, 2, and 3 austenitic stainless steel pipes welded with filler metals)
|
NB/T 20007.11-2019
|
|
NB/T 20007.12-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 12: Butt-welded stainless steel pipe fittings of grade 1, 2, and 3 welded with filler metals)
|
NB/T 20007.12-2019
|
|
NB/T 20007.20-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 20: Martensitic stainless steel for pumps Class A, B, C non-pressure casting internals)
|
NB/T 20007.20-2019
|
|
NB/T 20007.53-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 53: Austenitic stainless steel seamless steel tubes for safety grade equipment)
|
NB/T 20007.53-2019
|
|
NB/T 20007.54-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 54: Austenitic stainless steel seamless heat exchange tubes for safety equipment)
|
NB/T 20007.54-2019
|
|
NB/T 20007.9-2019
|
(Stainless steel for pressurized water reactor nuclear power plants Part 9: Butt-welded seamless pipe fittings of grade 1, 2, and 3 austenitic stainless steel)
|
NB/T 20007.9-2019
|
|
NB/T 20008.12-2019
|
(Other materials for pressurized water reactor nuclear power plants Part 12: Forging and rolling rods for bolts and nuts of Class 1, 2, and 3)
|
NB/T 20008.12-2019
|
|
NB/T 20008.13-2019
|
(Other materials for pressurized water reactor nuclear power plants Part 13: Class 1, 2, 3 studs, bolts, screws, screws and nuts)
|
NB/T 20008.13-2019
|
|
NB/T 20008.36-2019
|
(Other materials for pressurized water reactor nuclear power plants Part 36: Nickel-based alloy wire for safety equipment)
|
NB/T 20008.36-2019
|
|
NB/T 20008.37-2019
|
(Other materials for pressurized water reactor nuclear power plants Part 37: Stainless steel clad steel plate for safety injection box)
|
NB/T 20008.37-2019
|
|
NB/T 20008.38-2019
|
(Other materials for pressurized water reactor nuclear power plants Part 38: Nickel-based corrosion-resistant alloy forgings for blast valve shear covers)
|
NB/T 20008.38-2019
|
|
NB/T 20009.37-2019
|
(Welding materials for pressurized water reactor nuclear power plants Part 37: Submerged arc welding wires and fluxes for steel containment)
|
NB/T 20009.37-2019
|
|
NB/T 20011-2019
|
(Code for design of steel structure related to nuclear safety of PWR nuclear power plant)
|
NB/T 20011-2019
|
|
NB/T 20012-2019
|
(Code for design of concrete structure related to nuclear safety of PWR nuclear power plant)
|
NB/T 20012-2019
|
|
NB/T 20080-2019
|
(Identification of safety-grade exhaust-type lead-acid batteries for nuclear power plants)
|
NB/T 20080-2019
|
|
NB/T 20105-2019
|
(Code for design load of nuclear power plant building)
|
NB/T 20105-2019
|
|
NB/T 20127-2019
|
(Technical requirements for the manufacture and installation of embedded parts of PWR nuclear power plants)
|
NB/T 20127-2019
|
|
NB/T 20143.7-2019
|
(Process gas treatment Part 7: Hydrogen igniter)
|
NB/T 20143.7-2019
|
|
NB/T 20143.8-2019
|
(Process gas treatment Part 8: Silica gel desiccant)
|
NB/T 20143.8-2019
|
|
NB/T 20476.10-2019
|
(Nuclear power plant operation permit continuation. Part 10: Pre-stressed concrete containment time aging analysis)
|
NB/T 20476.10-2019
|
|
NB/T 20476.11-2019
|
(Nuclear Power Plant Operation Permit Extension Part 11: Supplementary Guide to Final Safety Analysis Report)
|
NB/T 20476.11-2019
|
|
NB/T 20476.12-2019
|
(Nuclear Power Plant Operation Permit Renewal Part 12: Guidelines for Compiling Applications)
|
NB/T 20476.12-2019
|
|
NB/T 20476.6-2019
|
(Nuclear Power Plant Operation Permit Continuation Part 6: Analysis of Reactor Pressure Vessel Time Limit Aging)
|
NB/T 20476.6-2019
|
|
NB/T 20476.7-2019
|
(Nuclear Power Plant Operation Permit Renewal Part 7: Steam Generator Time Aging Analysis)
|
NB/T 20476.7-2019
|
|
NB/T 20476.8-2019
|
(Nuclear Power Plant Operation Permit Extension Part 8: Metal Fatigue Analysis)
|
NB/T 20476.8-2019
|