 Basic data             | Standard ID | NB/T 10337-2019 (NB/T10337-2019) |           | Description (Translated English) | (Procedures for preparing pre-feasibility study report of hydropower project) |           | Sector / Industry | Energy Industry Standard (Recommended) |           | Classification of Chinese Standard | P59 |           | Classification of International Standard | 27.140 |           | Word Count Estimation | 130,121 |           | Date of Issue | 2019-12-30 |           | Date of Implementation | 2020-07-01 |           | Issuing agency(ies) | National Energy Administration | NB/T 10337-2019: (Procedures for preparing pre-feasibility study report of hydropower project)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Specification for Preparation of Pre-feasibility Study Report
for Hydropower Projects
Energy Industry Standards of the People's Republic of China
Replace DL/T 5206-2005
Regulations for preparing pre-feasibility study report of hydropower project
 ForewordAccording to the “National Energy Administration’s Circular on Issuing the.2015 Energy Industry Standard System (Revision) Plan
Knowing” (Guoneng Technology (2015) No. 283), the procedure preparation team has conducted extensive investigations and studies, and earnestly summarized the
Based on practical experience, and on the basis of extensive solicitation of opinions, this regulation will be revised.
The main technical contents of this regulation are. basic regulations, comprehensive instructions, engineering tasks and construction necessity,
Hydrology and sedimentation, engineering geology, engineering scale, construction land acquisition and resettlement, environmental protection and water and soil conservation, engineering
Process layout and building, electromechanical and metal structure, construction organization design, investment estimation, economic evaluation, conclusion
And recommendations.
The main technical content of the revision of this regulation is.
-Add a chapter "Basic Provisions" and revise the relevant content of the "General Provisions";
--Add related content of pumped storage power station;
-Add an appendix "Catalogue for Preparation of Pre-feasibility Study Report of Hydropower Station";
-Add an appendix "Catalogue for the preparation of pre-feasibility study reports for pumped storage power stations";
-Add the appendix "Pumped-storage power station engineering characteristics table";
-Revise the chapter "Necessity of Project Construction" to "Project Tasks and Necessity of Construction";
-Revise the chapter "Hydrology" to "Hydrological Sediment";
-Revise the chapter "Project Planning" to "Project Scale";
-Revise the chapter "Environmental protection" to "Environmental protection and soil and water conservation";
-Revise the chapter "Comprehensive Evaluation and Conclusions" to "Conclusions and Recommendations".
This regulation is managed by the National Energy Administration, proposed by the General Institute of Hydropower and Water Conservancy Planning and Design, and responsible for daily management.
Interpretation of specific technical content by the Energy Industry Hydropower Planning and Reservoir Environmental Protection Standardization Technical Committee.
If you have any comments or suggestions during the implementation process, please send them to the General Institute of Hydropower and Water Conservancy Planning and Design (Address. Xicheng, Beijing)
No. 2, Kangbei Street, Liupu District, Zip Code. 100120).
Editor-in-chief of this regulation. General Institute of Hydropower and Water Conservancy Planning and Design
The main drafters of this regulation. Wan Wengong, Yang Dequan, Zhao Quansheng, Yang Baiyin, Yu Weiqi, Wang Huiming, Yu Qinggui, Zhao Wuyi
Wang Kuiyin Xu Sheng Niu Wenbin Liu Guoyang Zhang Dongsheng Meng Fanfan Chen Yuying Lin Zhaohui Han Lingli Li Xiangfeng Zheng Linping Gao Jie
Zhou Xiaoxi Xie Hao Ye Rui
Main reviewers of this regulation. Peng Caide, Zheng Xingang, Zhang Yijun, and Yang Zhigang
Gong Jianxin Fang Guangda Chen Hongyu Zhou Jian
Jin Feng Lu Zhaoqin Ji Jin Hua Shi Qingnian
Chen Guozhu Wang Wenyuan Yang Hongbin Zhai Haiyan
Wang Yiming Du Xiuhui Zhou Zhenzhong Single Zhigang
Jiang Zhong See Wang Kangzhu Zhao Sheyi Yang Dinggui
Zhou Zhong Guo Yunfeng Ning Hua late Li Linian
Li Hongyuan Li ShishengTable of contents1 General...1
2 Basic regulations...2
3 General description...4
4 Engineering tasks and construction necessity...6
4.1 River planning or site selection planning for pumped storage power stations...6
4.2 Engineering Tasks...6
4.3 Scope of power supply and electricity market...6
4.4 Necessity of project construction...6
4.5 Charts...7
5 Hydrological and Sediment...8
5.1 River Basin Overview...8
5.2 Basic information...8
5.3 Weather...8
5.4 Runoff...8
5.5 Flood...9
5.6 Sediment...9
5.7 Evaporation, water temperature and ice conditions...9
5.8 Relationship between water level and flow...9
5.9 Automatic Hydrological Forecasting System...10
5.10 Charts...10
6 Engineering Geology...11
6.1 Overview...11
6.2 Regional geology and structural stability...11
6.3 Engineering geological conditions of the reservoir area...11
6.4 Engineering geological conditions of the hub project area...12
6.5 Natural building materials...13
6.6 Conclusions and recommendations...13
6.7 Charts and accessories...13
7 Project scale...14
7.1 Overview...14
7.2 Runoff regulation...14
7.3 Flood regulation...14
7.4 Reservoir characteristic water level...14
7.5 Installed capacity...15
7.6 Comprehensive Utilization...15
7.7 Initial impoundment...16
7.8 Sediment erosion and siltation and reservoir backwater...16
7.9 Operation Mode and Energy Index...16
7.10 Charts...17
8 Construction of land acquisition and resettlement...18
8.1 Overview...18
8.2 Scope of construction land acquisition...18
8.3 Physical indicators...18
8.4 Preliminary resettlement planning...18
8.5 Estimation of resettlement compensation fees for construction land acquisition...19
8.6 Analysis of the impact of land acquisition for construction of project comparison and selection options...19
8.7 Charts and accessories...19
9 Environmental protection and soil and water conservation...21
9.1 Overview...21
9.2 Environmental Status...21
9.3 Preliminary Evaluation...21
9.4 Countermeasures...22
9.5 Investment estimation...22
9.6 Evaluation conclusions and recommendations...23
9.7 Figures and accessories...23
10 Project layout and buildings...24
10.1 Engineering classification and design standards...24
10.2 Design basis and basic information...24
10.3 Dam site and plant site...24
10.4 Dam type...24
10.5 Hub layout and main buildings...24
10.6 Conclusions and recommendations...25
10.7 Charts...25
11 Electromechanical and metal structures...26
11.1 Overview...26
11.2 Hydraulic machinery...26
11.3 Electrical...26
11.4 Control protection and communication...26
11.5 Arrangement of electromechanical equipment...27
11.6 Metal structure...27
11.7 Charts...27
12 Construction Organization Design...28
12.1 Construction conditions...28
12.2 Construction Diversion...28
12.3 Material source planning...28
12.4 Construction of the main project...28
12.5 Construction Transportation...28
12.6 Main construction plant facilities and general construction layout...29
12.7 Total construction progress...29
12.8 Charts...29
13 Investment estimation...30
13.1 Compilation instructions...30
13.2 Investment Estimate Table and Attached Table...31
13.3 Accessories...32
14 Economic Evaluation...33
14.1 Overview...33
14.2 National Economic Evaluation...33
14.3 Financial Evaluation...33
14.4 Economic evaluation conclusion...34
14.5 Schedule...34
15 Conclusions and recommendations...35
Appendix A Catalogue of Pre-feasibility Study Report of Hydropower Station...36
Appendix B Catalogue for preparation of pre-feasibility study report of pumped storage power station...41
Appendix C Engineering Characteristics Table of Hydropower Station...46
Appendix D Engineering Characteristics Table of Pumped Storage Power Station...54
Explanation of terms used in this regulation...65
Attachment. Article description...
 
 |