HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

NB/T 10127-2018 English PDF

US$1039.00 ยท In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
NB/T 10127-2018: Performance design standard for furnaces and burners of large-capacity pulverized-coal-fired boilers
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
NB/T 10127-2018English1039 Add to Cart 8 days [Need to translate] Performance design standard for furnaces and burners of large-capacity pulverized-coal-fired boilers Valid NB/T 10127-2018

PDF similar to NB/T 10127-2018


Standard similar to NB/T 10127-2018

GB/T 16507.2   GB/T 16507.1   GB/T 12145   NB/T 47033   NB/T 11477   NB/T 10790   

Basic data

Standard ID NB/T 10127-2018 (NB/T10127-2018)
Description (Translated English) Performance design standard for furnaces and burners of large-capacity pulverized-coal-fired boilers
Sector / Industry Energy Industry Standard (Recommended)
Classification of Chinese Standard J98
Classification of International Standard 27.060.30
Word Count Estimation 45,450
Date of Issue 2018-12-25
Date of Implementation 2019-05-01
Older Standard (superseded by this standard) JB/T 10440-2004
Quoted Standard GB/T 211; GB/T 212; GB/T 213; GB/T 214; GB/T 219; GB/T 476; GB/T 1574; GB/T 2565; GB/T 2900.48-2008; GB/T 3715; GB/T 10184; GB/T 16507; GB/T 34348; TSG G0001; TSG G0002
Regulation (derived from) Natural Resources Department Announcement No. 7 of 2019
Issuing agency(ies) National Energy Administration
Summary This standard specifies the combustion mode of large-scale pulverized coal boilers, the determination method of the effective volume of the furnace, the selection of furnace thermal parameters and burner design parameters, the evaluation index of furnace and burner design performance, and other requirements related to the selection design. This standard is applicable to the design of furnaces and burners of large-scale pulverized coal boilers equipped with 300MW and above capacity generators (maximum continuous evaporation capacity of 1000t/h and above). The pulverized coal boilers with a generating capacity of less than 300MW can also be used. This standard does not apply to supercharged combustion boilers, cyclone combustion boilers and liquid slag pulverized coal boilers.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of NB/T 10127-2018_English be delivered?

Answer: Upon your order, we will start to translate NB/T 10127-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of NB/T 10127-2018_English with my colleagues?

Answer: Yes. The purchased PDF of NB/T 10127-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information