US$249.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40606-2021: Technical specifications for online security analysis and auxiliary decision-making of power grid Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 40606-2021 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Technical specifications for online security analysis and auxiliary decision-making of power grid
| Valid |
GB/T 40606-2021
|
PDF similar to GB/T 40606-2021
Basic data Standard ID | GB/T 40606-2021 (GB/T40606-2021) | Description (Translated English) | Technical specifications for online security analysis and auxiliary decision-making of power grid | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F21 | Word Count Estimation | 13,150 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40606-2021: Technical specifications for online security analysis and auxiliary decision-making of power grid ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specifications for online security analysis and auxiliary decision-making of power grid
ICS 29.240
CCSF21
National Standards of People's Republic of China
Power grid online security analysis and control auxiliary decision-making
specifications
Released on 2021-10-11
2022-05-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 2
5 Analysis mode 2
6 Data preparation 2
7 Analysis function 3
Appendix A (normative) Intraday rolling dispatch plan 7
Appendix B (normative) Ultra-short-term/short-term bus load forecasting 9
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446).
Drafting organizations of this document. National Electric Power Dispatching Control Center of State Grid Corporation of China, China Electric Power Research Institute Co., Ltd., Beijing
Kedong Electric Power Control System Co., Ltd., China Southern Power Grid Electric Power Dispatching Control Center, Nari Group Co., Ltd., State Grid Fujian Provincial Power
Power Co., Ltd., State Grid Anhui Electric Power Co., Ltd., State Grid Ningxia Electric Power Co., Ltd., State Grid Hebei Electric Power Co., Ltd., State Grid Shanxi Province
Electric Power Company, State Grid Shaanxi Electric Power Company, State Grid Qinghai Electric Power Company, State Grid Sichuan Electric Power Company, State Grid Zhejiang Electric Power Co., Ltd.
Division, East China Branch of State Grid Corporation of China.
The main drafters of this document. Zhu Weijiang, Lu Guangming, Feng Changyou, Dai Hongyang, Pi Junbo, Lu Ying, Ma Chao, Yu Zhihong, Yan Jianfeng, Zheng Liang,
Yu Jianming, Yao Haicheng, Xu Taishan, Jia Xiaobu, Wang Yi, Zhu Jianjun, Yuan Guichuan, Peng Wei, Leng Xiwu, Tian Bei, Shi Dongyu, Bao Yanhong, Bao Yingkai,
Li Hongqiang, Xie Mei, Han Ye, Xie Chang, He Qifei, Zhang Shuang, Hou Jinxiu, Deng Xiaoyuan, Xu Wei, Kang Jiandong, Liu Huakun, Yang Lin, Gao Bo, Jiang Zhengwei,
Ding Ping, Ren Xiancheng, Zhang Lulu, Shen Fengjie, Wang Bing, Wan Fangru, Jia Yupei, Wang Yang, Wei Yawei, Liu Qiang, Dong Yifeng, Hu Chaofan, Zhuang Wei, Zha Xianyu,
Liu Dong, Shan Huaping, Shi Chen, Wei Zun, Xue Hengyu, Chang Kang, Li Chengyu, Yang Liang.
Power grid online security analysis and control auxiliary decision-making
specifications
1 Scope
This document specifies the technical requirements for power grid online safety analysis and control auxiliary decision-making analysis mode, data preparation, and analysis functions.
This document is applicable to online safety analysis and control auxiliary decision-making of power grids with voltage levels of 220kV and above, and power grids below 220kV
Follow the execution.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 15544.1 Three-phase AC system short-circuit current calculation Part 1.Current calculation
GB/T 33590.2 Technical Specification for Smart Grid Dispatching Control System Part 2.Terminology
GB/T 33601 General model data naming specification for power grid equipment
GB/T 35692 System Planning Guidelines for HVDC Transmission Projects
GB 38755 Safety and Stability Guidelines for Power Systems
DL/T 1234 Technical Specification for Power System Security and Stability Calculation
3 Terms and definitions
The following terms and definitions defined in GB/T 33590.2 and GB 38755 apply to this document.
3.1
Powergridonlinesecurityanalysis
Based on the online calculation data of the grid history, current or future operation mode, analyze the safety of the power system according to the set disturbance, and obtain the results from the analysis.
Warnings will be given for limit violations, instability, and so on.
3.2
Auxiliary decision-making
Aiming at the overrun and instability obtained from the online security analysis of the power grid, a solution to meet the security and stability constraints is proposed.
3.3
Dispatchingschedule
The dispatching agency prepares the general term for power generation plan, AC and DC link exchange plan, and maintenance plan.
Note. The power generation plan includes power generation plans such as thermal power units, nuclear power units, hydropower units, and new energy stations.
3.4
Intradayrolingdispatchingschedule
According to the operation needs of the power grid, the regulatory agency takes into account the electricity spot market transactions and forms a dispatch plan after rolling adjustments within the day.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40606-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40606-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40606-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40606-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|