|
US$249.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 39983-2021: Ball arc guide - Acceptance specifications Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 39983-2021 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Ball arc guide - Acceptance specifications
| Valid |
GB/T 39983-2021
|
PDF similar to GB/T 39983-2021
Basic data | Standard ID | GB/T 39983-2021 (GB/T39983-2021) | | Description (Translated English) | Ball arc guide - Acceptance specifications | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J51 | | Word Count Estimation | 13,136 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 39983-2021: Ball arc guide - Acceptance specifications---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Ball arc guide-Acceptance specifications
ICS 25.060.10
J51
National Standards of People's Republic of China
Technical conditions for acceptance of ball guide rail pair
Released on 2021-04-30
2021-11-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Accuracy class 4
5 Model 4
6 Installation size 4
7 Accuracy inspection 6
8 Appearance quality 9
9 sign 9
10 Rust prevention, packaging and transportation 9
Reference 10
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the China Machinery Industry Federation.
This standard is under the jurisdiction of the National Standardization Technical Committee for Metal Cutting Machine Tools (SAC/TC22).
Drafting organizations of this standard. Nanjing Process Equipment Manufacturing Co., Ltd., National Machine Tool Quality Supervision and Inspection Center.
The main drafters of this standard. Yin Lingxiang, Yang Haibao, Wang Jikun, Wang Shoujue, Liu Zhiyun, Zhang Yunfeng, Chen Yanyan.
Technical conditions for acceptance of ball guide rail pair
1 Scope
This standard specifies the precision grade, model, installation size, precision inspection, appearance quality, logo, anti-rust packaging and
transport.
This standard applies to ball arc guide rails with balls as rolling elements. The rolling body is other forms of rolling arc guide rail pairs can also refer to
use.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
For all undated reference documents, the latest version (including all amendments) is applicable to this document.
GB/T 191-2008 Graphical signs for packaging, storage and transportation
GB/T 17421.1-1998 General rules for inspection of machine tools Part 1.Geometric accuracy of machine tools under no load or finishing conditions
JB/T 3207-2005 General technical conditions for product packaging of machine tool accessories
3 Terms and definitions
The following terms and definitions apply to this document.
3.1 General terms and definitions
3.1.1
Ball arc guide pair balarcguide
It is composed of an arc guide rail, an arc slider and a ball, which can be used as a guide and support component for arc motion.
See Figure 1 and Figure 2.
Note. The actual design does not have to be consistent with the structure shown in Figure 1.
8 Appearance quality
8.1 The ball and arc guide pair should have a compact structure and beautiful appearance under the conditions of ensuring strength and rigidity, and there should be no rust, bumps, scratches, etc. on the surface.
There should be no rust or blockage in all installation holes.
8.2 Returners and seals should not be misaligned.
8.3 After installation of the counterbore gland of the ball arc guide rail pair installation hole, it should not be higher than the surface of the arc guide rail.
9 signs
Permanent and clear marks shall be engraved on the non-working surface of the ball arc guide pair. The content of the logo includes trademark, model, and factory order
Number and reference rail symbol.
10 Rust prevention, packaging and transportation
10.1 Rust prevention
10.1.1 The anti-rust of the ball guide rail pair should be carried out in a clean and non-corrosive environment.
10.1.2 The ball and arc guide rail pair should be cleaned. After checking that there is no visible rust, dirt, oil, sweat, etc., anti-rust treatment should be carried out immediately.
10.1.3 After anti-rust treatment, the anti-rust period of the ball guide rail pair shall be no less than 2 years.
10.2 Packaging and transportation
10.2.1 The packaging of the ball guide rail pair requires moisture-proof, vibration-proof, safe and firm, convenient transportation, and should meet the requirements of JB/T 3207-2005.
Related regulations.
10.2.2 The external graphic mark of the packaging box shall comply with the requirements of GB/T 191-2008.The size and quality of the packing box should meet the requirements of the Ministry of Transport
The relevant provisions of the door.
10.2.3 Products that have undergone anti-rust treatment should pass through inner packaging. The inner packaging should be able to prevent the entry of corrosive gases and corrosive substances. In-pack
The installed product should be fixed in the packing box with supporting blocks, and the number of supporting blocks used for positioning of each set of ball arc guide rail pair shall not be less than two per meter.
It is not allowed to move, move or bend deformation of the ball arc guide rail pair during transportation.
10.2.4 The accompanying documents, including the certificate of conformity, instruction manual, and packing list, should be provided with one copy of each.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 39983-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 39983-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 39983-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 39983-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|