|
US$299.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31455.7-2015: Intelligent system of bus rapid transit -- Fart 7: Interface specifications between public transport priority device and traffic signal control Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31455.7-2015 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
Intelligent system of bus rapid transit -- Fart 7: Interface specifications between public transport priority device and traffic signal control
| Valid |
GB/T 31455.7-2015
|
PDF similar to GB/T 31455.7-2015
Basic data | Standard ID | GB/T 31455.7-2015 (GB/T31455.7-2015) | | Description (Translated English) | Intelligent system of bus rapid transit -- Fart 7: Interface specifications between public transport priority device and traffic signal control | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | L73 | | Classification of International Standard | 35.240.60; 35.100.70 | | Word Count Estimation | 14,198 | | Date of Issue | 2015-05-15 | | Date of Implementation | 2015-08-01 | | Quoted Standard | GB/T 31455.1-2015; GB/T 31455.3-2015 | | Regulation (derived from) | National Standard Announcement 2015 No. 15 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the device bus priority and traffic signal controller (hereinafter referred to as signal) in architecture, interface specifications and inspection rules for data communications. This section applies to transit signal priority equipment and machines communicate via switch and serial bus. |
GB/T 31455.7-2015: Intelligent system of bus rapid transit -- Fart 7: Interface specifications between public transport priority device and traffic signal control ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Intelligent system of bus rapid transit Fart 7. Interface specifications between public transport priority device and traffic signal control
ICS 35.240.60; 35.100.70
L73
National Standards of People's Republic of China
Bus Rapid Transit (BRT) Intelligent Systems
Part 7. bus priority facilities
And communication data traffic signal controller interface specification
Part 7. Interfacespecificationsbetweenpublictransportprioritydevice
Issued on. 2015-05-15
2015-08-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Abbreviations 1
5 system overall framework 1
6 Interface Specification 2
7 Inspection rules 8
Appendix A (normative) Equipment and bus priority traffic signal controller address 9
Index 10
Foreword
GB/T 31455 "Bus Rapid Transit (BRT) intelligent system" is divided into seven parts.
--- Part 1. General technical requirements;
--- Part 2. dispatch center system technical requirements;
--- Part 3. vehicle information terminal and automotive peripherals technical requirements;
--- Part 4. Field station platform control systems and peripheral equipment technical requirements;
--- Part 5. dispatch center and vehicle information terminal data communications interface specification;
--- Part 6. dispatch center and the station platform control system data communication interface specification;
--- Part 7. bus priority traffic signal controller equipment and data communications interface specification.
This section GB/T Part of 731,455.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part of the National Intelligent Transportation System Standardization Technical Committee (SAC/TC268) and focal points.
Drafting this Part. Research Institute of Highway Ministry of Transport, Qingdao Hisense Network Technology Co., Ltd. Beijing in the cross-country wisdom
Energy transport systems Technology Co., Ltd. Urumqi Municipal Public Security Bureau Traffic Police Detachment, integrated transport project research center of Urumqi city,
Urumqi Public Transport Group.
The main drafters of this section. Liu Fangdong, Pan Yong, Liu top, Wu Feng Yan, Wang Baoshan, Zhang Xiaoliang, three steel Mou, Zhang Xi, Li Haibo, Liu Dongmei,
Xu Longfang, Huangyan Lu, Yang Jindong, Liu, Wan Si Jun, Zhang steady, Wangxiao Kun, Dujun Wei, Yang Xiping, Cho Chang, Shaoxi Guo, He Hui, Zhang,
Hong Xiaolong.
Bus Rapid Transit (BRT) Intelligent Systems
Part 7. bus priority facilities
And communication data traffic signal controller interface specification
1 Scope
GB/T 31455 provisions of this part of the device and the bus priority traffic signal controller (hereinafter referred to as signal) for data communication
Architecture, interface specifications and inspection rules.
This section applies to bus priority signal equipment and machines communicate via the switch and serial bus.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 31455.1-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 1. General Technical Requirements
GB/T 31455.3-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 3. Car-vehicle information terminals and peripheral equipment technology
Claim
3 Terms and Definitions
GB/T 31455.1-2015 defined terms and definitions apply to this document.
4 Abbreviations
GB/T 31455.1-2015 defined abbreviations applicable to this document.
5 system overall framework
5.1 System overall framework diagram
BRT priority system by the car information terminals, bus priority equipment and signals of three parts, the system framework shown in Figure 1.
1 Bus Rapid Transit priority system frame chart
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31455.7-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31455.7-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31455.7-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31455.7-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|