HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB/T 31455.2-2015 English PDF

US$1519.00 · In stock
Delivery: <= 8 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31455.2-2015: Intelligent system of bus rapid transit -- Part 2: Technical requirements of dispatch center system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31455.2-2015English1519 Add to Cart 8 days [Need to translate] Intelligent system of bus rapid transit -- Part 2: Technical requirements of dispatch center system Valid GB/T 31455.2-2015

PDF similar to GB/T 31455.2-2015


Standard similar to GB/T 31455.2-2015

GB/T 44130.1   GB/T 38555   GB/T 39105   GB/T 31455.4   GB/T 31455.5   GB/T 31455.3   

Basic data

Standard ID GB/T 31455.2-2015 (GB/T31455.2-2015)
Description (Translated English) Intelligent system of bus rapid transit -- Part 2: Technical requirements of dispatch center system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard L73
Classification of International Standard 35.240.60; 35.100.70
Word Count Estimation 72,723
Date of Issue 2015-05-15
Date of Implementation 2015-08-01
Quoted Standard GB/T 14394; GB 50526; GB/T 31455.1-2015; GB/T 31455.5-2015; GB/T 31455.6-2015
Regulation (derived from) National Standard Announcement 2015 No. 15
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Standard specifies the Bus Rapid Transit (BRT) system overall framework of intelligent control center systems, technical requirements, interface specifications and inspection rules. This Standard applies to the construction and management of the system control center.

GB/T 31455.2-2015: Intelligent system of bus rapid transit -- Part 2: Technical requirements of dispatch center system


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Bus Rapid Transit (BRT) intelligent systems - Part 2. Technical requirements dispatch center system) ICS 35.240.60; 35.100.70 L73 National Standards of People's Republic of China Bus Rapid Transit (BRT) Intelligent Systems Part 2. Technical requirements dispatch center system Part 2. Technicalrequirementsofdispatchcentersystem Issued on. 2015-05-15 2015-08-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Introduction Ⅲ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Abbreviations 1 5 system overall framework 1 6 2 Technical Requirements 7 7 Interface Specification 47 8 Inspection Rules Appendix A (normative) dispatch center system interface data element 52 Index 68

Foreword

GB/T 31455 "Bus Rapid Transit (BRT) intelligent system" is divided into seven parts. --- Part 1. General technical requirements; --- Part 2. dispatch center system technical requirements; --- Part 3. vehicle information terminal and automotive peripherals technical requirements; --- Part 4. Field station platform control systems and peripheral equipment technical requirements; --- Part 5. dispatch center and vehicle information terminal data communications interface specification; --- Part 6. dispatch center and the station platform control system data communication interface specification; --- Part 7. bus priority traffic signal controller equipment and data communications interface specification. This section GB/T Part of 231,455. This section drafted in accordance with GB/T 1.1-2009 given rules. This part of the National Intelligent Transportation System Standardization Technical Committee (SAC/TC268) and focal points. This section is drafted. Qingdao Hisense Network Technology Co., Ltd., the Department of Transportation Highway Research Institute, Beijing wisdom in the cross-country Energy transport systems Technology Co., Ltd. Urumqi Municipal Public Security Bureau Traffic Police Detachment, integrated transport project research center of Urumqi city, Ulu Qi wood Bus Group. The main drafters of this section. Wang Baoshan, Liu top, Liu Dongmei, Wu Feng Yan, Liu Fangdong, Yi Qian, three steel Mou, Liu, Wan Si Jun, Wang Wenjing, Du Junwei, pipe Tokunaga, Hooky fire, Wangxin Lei, Liu Gang, Wan Li, Zhang steady, Li Kunpeng, Wangxiao Kun, Yang Xiping, Cho Chang, Shaoxi Guo, He Hui, Zhang, Hong Xiaolong. Bus Rapid Transit (BRT) Intelligent Systems Part 2. Technical requirements dispatch center system

1 Scope

GB/T 31455 provisions of this part of the Bus Rapid Transit (BRT) system overall framework of intelligent control center systems, technical requirements, interfaces Specifications and inspection rules. This section applies to the construction and management of the system control center.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 14394 computer software reliability and maintainability management GB 50526 Public Broadcasting System engineering and technical norms GB/T 31455.1-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 1. General Technical Requirements GB/T 31455.5-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 5. dispatch center and vehicle information terminal communication data Interface Specification GB/T 31455.6-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 6. dispatch center with the station control system communication platform Data Interface Specification

3 Terms and Definitions

GB/T 31455.1-2015 defined terms and definitions apply to this document.

4 Abbreviations

GB/T 31455.1-2015 defined abbreviations applicable to this document.

5 system overall framework

Dispatch center system is divided into nine business systems. operations control center system, passenger information service center system, security door central system, Ticketing center system, video surveillance systems, digital broadcasting center system, perimeter guard center system, the bus system and at the center of Priority System clock synchronization between business systems through a communication gateway for data exchange. Overall dispatch center system framework shown in Figure 1.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31455.2-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31455.2-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 5 ~ 8 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31455.2-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31455.2-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.