US$779.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31455.4-2015: Intelligent system of bus rapid transit -- Part 4: Technical requirements of depot/platform control system and peripheral equipment Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31455.4-2015 | English | 779 |
Add to Cart
|
6 days [Need to translate]
|
Intelligent system of bus rapid transit -- Part 4: Technical requirements of depot/platform control system and peripheral equipment
| Valid |
GB/T 31455.4-2015
|
PDF similar to GB/T 31455.4-2015
Basic data | Standard ID | GB/T 31455.4-2015 (GB/T31455.4-2015) | | Description (Translated English) | Intelligent system of bus rapid transit -- Part 4: Technical requirements of depot/platform control system and peripheral equipment | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | L73 | | Classification of International Standard | 35.240.60; 35.100.70 | | Word Count Estimation | 37,377 | | Date of Issue | 2015-05-15 | | Date of Implementation | 2015-08-01 | | Quoted Standard | GB 2312; GB/T 2423.1; GB/T 2423.2; GB/T 2423.3; GB 4208-2008; GB/T 5080.7; GB/T 9384; GB 16796-2009; GB/T 31455.1-2015; GB/T 31455.3-2015; SJ/T 11281-2007; SJ/T 11348-2006 | | Regulation (derived from) | National Standard Announcement 2015 No. 15 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the Bus Rapid Transit (BRT) system overall framework of the station platform intelligent control systems, technical requirements, interface specifications and inspection rules. This section applies to the construction and management of the station platform control system. |
GB/T 31455.4-2015: Intelligent system of bus rapid transit -- Part 4: Technical requirements of depot/platform control system and peripheral equipment ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Intelligent system of bus rapid transit Part 4. Technical requirements of depot/platform control system and peripheral equipment
ICS 35.240.60; 35.100.70
L73
National Standards of People's Republic of China
Bus Rapid Transit (BRT) Intelligent Systems
Part 4. Field station platform control systems and peripherals
skills requirement
Part 4. Technicalrequirementsofdepot/platformcontrolsystem
Issued on. 2015-05-15
2015-08-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 Abbreviations 1
5 system overall framework 1
6 3 Technical requirements
7 Interface Specification 10
24 8 Inspection Rules
Appendix A (normative) Peripheral address code and fault code 31
Index 33
Foreword
GB/T 31455 "Bus Rapid Transit (BRT) intelligent system" is divided into seven parts.
--- Part 1. General technical requirements;
--- Part 2. dispatch center system technical requirements;
--- Part 3. vehicle information terminal and automotive peripherals technical requirements;
--- Part 4. Field station platform control systems and peripheral equipment technical requirements;
--- Part 5. dispatch center and vehicle information terminal data communications interface specification;
--- Part 6. dispatch center and the station platform control system data communication interface specification;
--- Part 7. bus priority traffic signal controller equipment and data communications interface specification.
This section GB/T Part of 431,455.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part of the National Intelligent Transportation System Standardization Technical Committee (SAC/TC268) and focal points.
This section is drafted. Qingdao Hisense Network Technology Co., Ltd., the Department of Transportation Highway Research Institute, Beijing wisdom in the cross-country
Energy transport systems Technology Co., Ltd. Urumqi Municipal Public Security Bureau Traffic Police Detachment, integrated transport project research center of Urumqi city,
Urumqi Public Transport Group.
The main drafters of this section. Top Liu, Wu Feng Yan, Sangli, Liufang Dong, Wang Baoshan, Wang Jing, Liu Xin, Mu three steel, Wangxin Lei, Li Wei,
Zhou Zhongyuan, Wan Si Jun, Zhang steady, Yang Jindong, Dujun Wei, Yang Xiping, Cho Chang, Shaoxi Guo, He Hui, Zhang, Hong Xiaolong, Wang Xiaokun.
Bus Rapid Transit (BRT) Intelligent Systems
Part 4. Field station platform control systems and peripherals
skills requirement
1 Scope
GB/T 31455 provisions of this part of the Bus Rapid Transit (BRT) system intelligent control system of the station platform the overall framework of technical requirements,
Interface specifications and inspection rules.
This section applies to the construction and management of the station platform control system.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 2312 exchange information with Chinese characters coded character set basic set
GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Cold
GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. Dry heat
GB/T 2423.3 Environmental testing for electric and electronic products Part 2. Test methods - Test Cab. Damp heat test
GB 4208-2008 shell protection (IP code)
GB/T 5080.7 Equipment reliability testing efficiency constant failure rate assumption under the MTBF of test plans
GB/T 9384 radio broadcast, radio and television receivers, tape recorders and audio amplifiers (amplifiers) to the test environment
Sum Test Method
GB 16796-2009 security alarm equipment safety requirements and test methods for prevention
GB/T 31455.1-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 1. General Technical Requirements
GB/T 31455.3-2015 Bus Rapid Transit (BRT) Intelligent Systems - Part 3. Car-vehicle information terminals and peripheral equipment technology
Claim
SJ/T 11281-2007 light emitting diode (LED) display test method
SJ/T 11348-2006 Methods of measurement of digital TV flat panel display
3 Terms and Definitions
GB/T 31455.1-2015 defined terms and definitions apply to this document.
4 Abbreviations
GB/T 31455.1-2015 defined abbreviations applicable to this document.
5 system overall framework
5.1 System overall framework diagram
Station platform control system should include control panels, electronic stop sign, grid display, security doors, fare collection equipment, gates, network digital camera
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31455.4-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31455.4-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31455.4-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31455.4-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|