HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 18916.40-2018 English PDF

US$159.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 18916.40-2018: Norm of water intake -- Part 40: Shipbuilding
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 18916.40-2018English159 Add to Cart 3 days [Need to translate] Norm of water intake -- Part 40: Shipbuilding Valid GB/T 18916.40-2018

PDF similar to GB/T 18916.40-2018


Standard similar to GB/T 18916.40-2018

GB/T 18916.39   GB/T 18916.41   GB/T 18916.35   GB/T 18916.53   GB/T 18916.49   GB/T 18916.47   

Basic data

Standard ID GB/T 18916.40-2018 (GB/T18916.40-2018)
Description (Translated English) Norm of water intake -- Part 40: Shipbuilding
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard P41
Classification of International Standard 13.060.25
Word Count Estimation 8,833
Date of Issue 2018-12-28
Date of Implementation 2019-04-01
Quoted Standard GB/T 12452; GB/T 12924; GB/T 18820; GB/T 21534; GB 24789; CB/T 3484
Regulation (derived from) National Standard Announcement No. 17 of 2018
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration
Summary This standard specifies the terms and definitions, calculation methods and water withdrawal quotas for water withdrawal quotas for metal vessels. This standard is applicable to the management of water withdrawals of existing, newly built and rebuilt metal shipbuilding enterprises. This standard does not apply to the management of water withdrawals by non-metallic shipbuilding companies.

GB/T 18916.40-2018: Norm of water intake -- Part 40: Shipbuilding

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Norm of water intake--Part 40. Shipbuilding ICS 13.060.25 P41 National Standards of People's Republic of China Water withdrawal quotas Part 40. Shipbuilding Published on.2018-12-28 Implementation of.2019-04-01 State market supervision and administration China National Standardization Administration issued

Foreword

GB/T 18916 "Water quota", has been or is planned to be released The following sections. --- Part 1. Thermal power generation; --- Part 2. Iron and steel joint ventures; --- Part 3. Petroleum refining; ---Part 4. Textile dyeing and finishing products; ---Part 5. Paper products; --- Part 6. Beer manufacturing; --- Part 7. Alcohol manufacturing; ---Part 8. Synthetic ammonia; --- Part 9. MSG manufacturing; --- Part 10. Pharmaceutical products; --- Part 11. Coal preparation; --- Part 12. Alumina production; --- Part 13. Ethylene production; ---Part 14. Wool textile products; ---Part 15. Liquor manufacturing; ---Part 16. Electrolytic aluminum production; ---Part 17. Production of stacked bauxite; ---Part 18. Copper smelting production; ---Part 19. Lead smelting production; ---Part 20. Chemical fiber filament weaving products; --- Part 21. Silk products; --- Part 22. Starch sugar manufacturing; ---Part 23. Manufacture of citric acid; ---Part 24. Hemp textile products; ---Part 25. Viscose fiber products; ---Part 26. Soda ash; ---Part 27. Urea; ---Part 28. Industrial sulfuric acid; ---Part 29. caustic soda; --- Part 30. Coking; --- Part 31. Sintering/Pellet in the steel industry; --- Part 32. Iron ore beneficiation; --- Part 33. Coal indirect liquefaction; --- Part 34. Direct liquefaction of coal; --- Part 35. Coal to methanol; ---Part 36. Coal to ethylene glycol; ---Part 37. Wet-process phosphoric acid; ---Part 38. Polyvinyl chloride; --- Part 39. Coal-based natural gas; --- Part 40. Shipbuilding; --- Part 41. Yeast manufacturing; --- Part 42. Yellow wine manufacturing. This part is the 40th part of GB/T 18916. This part is drafted in accordance with the rules given in GB/T 1.1-2009. This part is proposed by the Ministry of Water Resources of the People's Republic of China and the National Development and Reform Commission of the People's Republic This part is under the jurisdiction of the National Water Conservation Standardization Technical Committee (SAC/TC442). This section drafted by. China Shipbuilding Industry Comprehensive Technology and Economic Research Institute, Shanghai Waigaoqiao Shipbuilding Co., Ltd., Taizhou port ships have Limited company, China National Institute of Standardization, Shanhaiguan Shipbuilding Heavy Industry Co., Ltd. The main drafters of this section. Zhao Chenning, Sun Meng, Bai Xue, Dai Jianheng, Wu Jian, Wang Zhongyan, Cai Wei, Zhang Yu. Water withdrawal quotas Part 40. Shipbuilding

1 Scope

This part of GB/T 18916 specifies the terms and definitions, calculation methods and water withdrawal quotas for the water withdrawal quota for metal vessels. This section applies to the management of water withdrawals of existing, newly built and rebuilt metal shipbuilding enterprises. This section does not apply to the management of water withdrawals by non-metallic shipbuilding companies.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 12452 Enterprise Water Balance Test General GB/T 12924 ship craft terminology hull construction and installation process GB/T 18820 General rules for the preparation of water withdrawal quotas for industrial enterprises GB/T 21534 Industrial Water Saving Terminology GB 24789 Water unit water metering equipment management and general rules CB/T 3484 civil ship revised gross tonnage calculation

3 Terms and definitions

The following terms and definitions defined by CB/T 3484, GB/T 12924, GB/T 18820 and GB/T 21534 apply to this file. 3.1 Metal ship metalship The hull structure is a ship based on metal materials. 3.2 Fixed total tons of compensatedgrosston; CGT A measure of the complexity of the ship used to reflect the shipbuilding volume of a collective based on the gross tonnage.

4 calculation method

4.1 General provisions 4.1.1 Scope of water withdrawal The water withdrawal range refers to the amount of water extracted by the enterprise from various conventional water sources, including from surface water (measured by water supply from the water purification plant), groundwater, The water supply project of the town, as well as the water quantity of other water or water products (such as steam, hot water, geothermal water, etc.) purchased by the enterprise from the market. 4.1.2 Water supply range Metal ship manufacturing water supply range, including major production (including water-fire bending, plasma cutting, pyrotechnics, segmentation and hull

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 18916.40-2018_English be delivered?

Answer: Upon your order, we will start to translate GB/T 18916.40-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 18916.40-2018_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 18916.40-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information