GB/T 37134-2018 English PDFUS$599.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37134-2018: Guide for ancillary service of grid connected power plants Status: Valid
Basic dataStandard ID: GB/T 37134-2018 (GB/T37134-2018)Description (Translated English): Guide for ancillary service of grid connected power plants Sector / Industry: National Standard (Recommended) Classification of Chinese Standard: F20 Classification of International Standard: 29.020 Word Count Estimation: 30,352 Date of Issue: 2018-12-28 Date of Implementation: 2019-07-01 Issuing agency(ies): State Administration for Market Regulation, China National Standardization Administration GB/T 37134-2018: Guide for ancillary service of grid connected power plants---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Guide for ancillary service of grid connected power plants ICS 29.020 F20 National Standards of People's Republic of China Guidelines for auxiliary services for grid-connected power plants Published on.2018-12-28 2019-07-01 implementation State market supervision and administration China National Standardization Administration issued ContentForeword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General 2 5 auxiliary services 2 6 provided and called 5 7 data measurement 6 8 Basic auxiliary service assessment 6 9 Paid auxiliary service assessment principles and requirements 7 10 Paid Supplementary Service Compensation Principles and Requirements 9 11 settlement 10 12 Disclosure and Access to Information 11 Appendix A (informative appendix) Calculation and assessment of primary FM integrated indicators 12 Appendix B (informative) Operating conditions for genset reactive power regulation time 15 Appendix C (informative) Calculation method for peak load contribution rate of generator sets 16 Appendix D (informative) AVC performance indicators 19 Appendix E (informative appendix) AGC performance index calculation and compensation assessment metrics 22 Reference 25ForewordThis standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the National Energy Administration. This standard is under the jurisdiction of the National Electricity Regulatory Standardization Technical Committee (SAC/TC296). This standard was drafted. North China Energy Regulatory Bureau, North China Power Grid Co., Ltd., North China Electric Power Research Institute Co., Ltd., Tsinghua University Xueyuan, State Grid North Power Co., Ltd., State Grid Xinyuan Holdings Co., Ltd. Beijing Shisanling Storage Power Plant. The main drafters of this standard. Shi Peiran, Xie Xu, Kang Jingqiu, Jiang Changming, Cui Zhengyi, Chen Dayu, Lu Feng, Liu Jun, Xie Liang, Chen Zhizhen, Lei Yu, Luliang Junchao, Zhao Wei, Liu Hui, Shi Yang, Qi Jialin, Zhang He, Wu Bing, Cui Da, Xu Ying, Su Feng, Guo Lei, Liang Chuanwei, Qiu Xiaozhi, Chen Qixin, Chen Xiaofeng, Yang Zhanliang, Liu Jingbo. Guidelines for auxiliary services for grid-connected power plants1 ScopeThis standard stipulates the basic technical requirements and foundations for the provision, call, measurement, assessment and compensation of auxiliary services for grid-connected power plants. This principle. This standard is applicable to grid-connected power plants (including self-supplied power plants) participating in power grid operation, and provincial and above power dispatching agencies. The power dispatching agencies below the provincial level can refer to the implementation. This standard does not apply to the electricity spot market and the power auxiliary service market.2 Normative referencesThe following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 7064 hidden pole synchronous generator technical requirements Basic technical conditions of GB/T 7894 hydro-generator GB/T 19963 Wind farm access to power system technical regulations GB/T 19964 Photovoltaic power station access to power system technical regulations GB/T 30370 Thermal power generation unit primary frequency test and performance acceptance guidelines GB/T 31464 grid operation guidelines HAF103 Nuclear Power Plant Operation Safety Regulations3 Terms and definitionsThe following terms and definitions apply to this document. 3.1 Power system powersystem Power generation, power supply (transmission, substation, distribution), electrical facilities, and relay protection and safety automatic devices required to ensure their normal operation, The unified whole of the secondary facilities such as metering device, dispatching automation, and power communication. 3.2 Grid power plant gridconnectedpowerplant Incorporate into the power of the grid (burning coal, fuel, gas and biomass), hydraulic, nuclear, wind, solar, ocean energy, energy storage, etc. Power plant (field, station). 3.3 Genset generatorset Convert other forms of energy (such as coal, fuel, gas, water, nuclear, wind, solar, biomass, ocean energy, etc.) into electrical energy Complete power generation equipment. 3.4 Electric energy storage facility electricstoragefacility A facility that stores electrical energy by chemical or physical means and releases it in the form of electrical energy when needed. ......Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37134-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 37134-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.Question 2: Can I share the purchased PDF of GB/T 37134-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37134-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to Sales@ChineseStandard.net. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. |