HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

GB/T 25482-2010 English PDF

US$209.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 25482-2010: Automatic closed flashpoint analyzer
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 25482-2010English209 Add to Cart 3 days [Need to translate] Automatic closed flashpoint analyzer Valid GB/T 25482-2010

PDF similar to GB/T 25482-2010


Standard similar to GB/T 25482-2010

GB/T 20730.2   GB/T 19146   GB/T 22065   GB/T 45358   GB/T 25475   GB/T 25473   

Basic data

Standard ID GB/T 25482-2010 (GB/T25482-2010)
Description (Translated English) Automatic closed flashpoint analyzer
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard N11
Classification of International Standard 17.200.20
Word Count Estimation 9,975
Date of Issue 2010-12-01
Date of Implementation 2011-05-01
Quoted Standard GB/T 191-2008; GB/T 261-2008; GB/T 2829-2002; GB/T 4793.1-2007; GB/T 11606-2007; GB/T 13384-2008; SH/T 0768-2005
Regulation (derived from) Announcement of Newly Approved National Standards No. 9, 2010 (No. 164 overall)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the requirements for automatic flash point tester, test methods, inspection rules and signs, packaging, transport and storage. This standard applies with automatic heating, lid, mixing, ignition, automatic display flash point flash point tester.

GB/T 25482-2010: Automatic closed flashpoint analyzer

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Automatic closed flashpoint analyzer ICS 17.200.20 N11 National Standards of People's Republic of China Automatic closed flash point meter 2010-12-01 release 2011-05-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of the People 's Republic of China China National Standardization Management Committee released

Foreword

This standard is proposed by the China Machinery Industry Federation. This standard is nationalized by the National Industrial Process Measurement and Control Standardization Technical Committee (SAC/TC124). The drafting of the standard unit. Shandong three pumps or the Senson Instrument Co., Ltd., Jiangsu River Power Distribution Analysis Instrument Co., Ltd., the national quality of analytical instruments Supervision and inspection center, Xi'an Thermal Engineering Research Institute Co., Ltd., Sinopec Qilu Petrochemical Company victory refinery. The main drafters of this standard. Wang Guofeng, Wu Yuanhai, Wu Rongkun, Yuan Zheng, Meng Yuchan, Xu Li. Automatic closed flash point meter

1 Scope

This standard specifies the requirements, test methods, inspection rules and marking, packaging, transportation and storage of the automatic closed flash point meter. This standard is applicable to automatic closed flash meter (hereinafter referred to as "instrument") with automatic temperature rise, open cover, stirring, ignition and flash point value.

2 normative reference documents

The terms of the following documents are hereby incorporated by reference into this standard. Whichever is the date of the reference file, which is followed by all (Excluding corrigenda) or revisions do not apply to this standard, however, encourage the parties to reach an agreement under this standard Whether you can use the latest version of these files. For undated references, the latest edition applies to this standard. GB/T 191-2008 Packaging and storage icon (ISO 780..1997, MOD) GB/T 261-2008 Determination of flash point Binsky - Martin closed cup method (ISO 2719..2002, MOD) GB/T 2829-2002 Periodic inspection count Sampling procedures and tables (for inspection of process stability) GB 4793.1-2007 Safety requirements for electrical equipment for measurement, control and laboratory use - Part 1. General requirements (IEC 61010-1. 2001, IDT) Environmental testing methods for analytical instruments GB/T 11606-2007 General technical requirements for packaging of electromechanical products GB/T 13384-2008 SH/T 0768-2005 Flash point determination method (normally closed closed cup method)

3 request

3.1 normal working conditions The normal working conditions of the instrument should meet. a) Ambient temperature 5 ℃ ~ 30 ℃; b) relative humidity should not exceed 80%; c) vibration and electromagnetic interference used without affecting the instrument; d) indoor non-corrosive gas, a good ventilation device; e) Power supply. voltage 220V ± 22V, frequency 50Hz ± 1Hz.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 25482-2010_English be delivered?

Answer: Upon your order, we will start to translate GB/T 25482-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 25482-2010_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 25482-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information