HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (17 May 2025)

PDF GB/T 22065-2008 English


Search result: GB/T 22065-2008
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 22065-2008English150 Add to Cart 0-9 seconds. Auto-delivery. Pressure type SF6 gas density monitor Valid

PDF Preview: GB/T 22065-2008                   
      

GB/T 22065-2008: PDF in English (GBT 22065-2008)

GB/T 22065-2008 GB NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 17.100 N 11 Pressure type SF6 gas density monitor 压力式六氟化硫气体密度控制器 ISSUED ON. JUNE 20, 2008 IMPLEMENTED ON. JANUARY 01, 2009 Issued by. General Administration of Quality Supervision, Inspection and Quarantine; Standardization Administration of the People's Republic of China. Table of Contents Foreword ... 3  1 Scope ... 4  2 Normative references ... 4  3 Terms and definitions ... 5  4 Product classification ... 5  5 Technical requirements ... 7  6 Test methods ... 12  7 Inspection rules ... 15  8 Markings, packaging and storage ... 16  Appendix A (Normative) Test sequence and interval between test items ... 18  Appendix B (Informative) Additional requirements for instrument joint ... 19  Appendix C (Informative) Contact on/off function of electrical signaling device ... 20  Pressure type SF6 gas density monitor 1 Scope This standard specifies the product classification, technical requirements, test methods, inspection rules and markings, packaging and storage of pressure type SF6 gas density monitor. This standard is applicable to pressure type SF6 gas density monitor (hereinafter referred to as instrument) that use spring tubes as measuring elements, temperature compensation devices, and has the indicating and controlling the on/off function of electrical signals. 2 Normative references The provisions in following documents become the provisions of this Standard through reference in this Standard. For the dated references, the subsequent amendments (excluding corrections) or revisions do not apply to this Standard; however, parties who reach an agreement based on this Standard are encouraged to study if the latest versions of these documents are applicable. For undated references, the latest edition of the referenced document applies. GB 4208 Degrees of protection provided by enclosure(IP code) (GB 4208- 2008, IEC 60529.2001, IDT) GB/T 1226-2001 General pressure gauge GB/T 2423.10 Environmental testing for electric and electronic products - Part 2. Tests methods - Test Fc. Vibration (sinusoidal) (GB/T 2423.10-2008, IEC 60068-2-6.1995, IDT) GB/T 11023-1989 Test guide of SF6 gas tightness for high-voltage switchgear GB/T 11287 Electrical relays - Part 21. Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section one. Vibration tests (sinusoidal) (GB/T 11287-2000, idt IEC 60255-21-1.1988) GB/T 14598.3-2006 Electrical relays - Part 5. Insulation coordination for measuring relays and protection equipment - Requirements and tests (IEC 60255-5.2000, IDT) GB/T 15464 General-purpose specification for the packaging of instrumentation products JB/T 5528 Scale and distribution for pressure gauge JB/T 9329 Basic environmental conditions and testing methods for instruments transportation and storage in the transportation 3 Terms and definitions The following terms and definitions apply to this standard. 3.1 Rated pressure Under standard atmospheric pressure conditions, the pressure of SF6 gas which is charged into the equipment chamber as required before the equipment is put into operation or during gas replenishment. 3.2 Alarm pressure The pressure at which the instrument is required to issue alarm signal when the SF6 gas pressure in the equipment chamber is reduced to a certain setting value. 3.3 Atresia pressure The pressure at which the instrument is required to issue atresia signal when the SF6 gas pressure in the equipment chamber is reduced to a certain setting value. 4 Product classification 4.1 Type 4.1.1 The instrument measurement type is. pressure vacuum. 4.1.2 The instrument is divided into radial installation and axial installation in accordance with the thread installation method. 4.1.3 The instrument is divided into enclosure oil filling type and enclosure non- oil filling type in accordance with the aseismic requirements. 6 Test methods The test sequence of the instrument and the rest interval between each test item shall be in accordance with Appendix A (normative appendix). 6.1 Test conditions Refer to 5.2 Reference working conditions. 6.2 Test instruments The absolute value of the basic error limit of the standard instrument for testing is not greater than 1/4 of the absolute value of the basic error limit of the instrument being tested. 6.3 Inspection point a) The inspection points for basic errors are marked with a numbered scale line and rated pressure points (except for set-points). b) The inspection points for set-point deviations and switching errors are the alarm pressure and atresia pressure marked on the dial. c) The inspection points for temperature compensation is the rated pressure marked on the dial. 6.4 Test methods It is tested by comparing the measured instrument with a standard instrument. 6.5 Basic error test 6.5.1 During the test, load shall be increased from zero uniformly and slowly, check each specified inspection point to the upper limit of measurement (the vacuum inspection point shall not be less than 90% of the local extractable ultimate vacuum), and keep it for 3 minutes, and then evenly and slowly reduce the load and check each inspection point to zero. 6.5.2 At the time of inspection, each inspection point shall make two readings, one reading made when the load reaches the specified inspection value stably, the other reading made after tapping gently the instrument enclosure. 6.5.3 The basic error shall be measured once before and after gentle tapping in both positive and negative strokes. The difference between the indication value before and after tapping and the indication value at the inspection point shall meet the requirements of clause 5.3. 6.6 Return difference test provisions of clause 5.10. After removing the load, the test is to be carried out within 30 min in accordance with clauses 6.5 ~ 6.10. 6.13 Alternating pressure test The instrument is installed on an alternating pressure tester capable of generating a sinusoidal waveform with a frequency of (60 ± 5) times/min, an alternating pressure amplitude and an alternation number in compliance with the prescribed values as specified in clause 5.11, and is inspected within 30 minutes after the test in accordance with clause 6.5 ~ 6.10. 6.14 Insulation test Under the environmental conditions specified in clause 5.12, connect the 500 V megohmmeter between each terminal of the instrument and each terminal and the enclosure, measure their insulation resistance respectively. Then, in the same way, connect it into the insulation strength test bench to gradually increase the test voltage from zero to 2 kV (1 kV between each terminals of the micro switch type), maintain it for 1 min, there shall be free from arcing and breakdown. Then smoothly reduce the test voltage to zero, finally cut off the power. 6.15 Sealing performance test Increase the charged SF6 gas pressure to 110% of rated pressure, blow out residual SF6 gas around the instrument, use a plastic film to cover the instrument, after 24 h, use the SF6 gas leak detector with a sensitivity of at least 10-8 to detect the SF6 gas concentration in the plastic film and in the enclosure, calculate the absolute leakage rate of the instrument in accordance with the method as specified in clause 4.2.1 of GB/T 11023-1989, the value shall be not more than the values as specified in clause 5.13. 6.16 Enclosure protection class test It is tested in accordance with the relevant requirements in GB 4208. After the test, it shall be inspected in accordance with 6.14. 6.17 Lightning impulse withstand voltage test It is tested in accordance with the relevant requirements in clause 6.1.3.2 of GB/T 14598.3-2006. After the test, it shall be inspected in accordance with 6.14. 6.18 Impact resistance test Put the instrument in the normal working position and perform test in accordance with the impact parameters as specified in clause 5.16 of this standard. After the test, it shall be inspected in accordance with 6.5 ~ 6.10. with the technical requirements of this standard. a) New product trial production finalization; b) Batch produced instruments are to be tested every 3 years; c) When there are major changes in the design, process and materials, etc.; d) When the production is resumed after suspension of instrument production. Note. In the type test b) and d), the items under 5.14, 5.15, 5.17 and 5.19 are not carried out. 8 Markings, packaging and storage 8.1 Markings The instrument’s dial or nameplate shall generally be marked with. a) Manufacturer’s name or trademark; b) Name of the instrument; c) Units of measurement; d) Accuracy level; e) Rated power; f) Maximum operating voltage; g) Maximum allowable current; h) Rated pressure; i) Alarm pressure; j) Atresia pressure; k) Year of manufacture and instrument number. 8.2 Packaging Instrument packaging shall comply with the requirements of GB/T 15464. 8.3 Storage The instrument shall be stored in a dry and ventilated room. The indoor air shall ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.

Similar standards: GB/T 20730.2   GB/T 19146   CJ 128   GB/T 45358