Path: Home > GB/T > Page147 > GB/T 44747.1-2024 Home > Standard_List > GB/T > Page147 > GB/T 44747.1-2024
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 44747.1-2024 | English | 329 |
Add to Cart
|
4 days [Need to translate]
|
Building construction machinery and equipment - Concrete placing systems for stationary equipment - Part 1: Terminology and commercial specifications
| Valid |
GB/T 44747.1-2024
|
PDF similar to GB/T 44747.1-2024
Basic data | Standard ID | GB/T 44747.1-2024 (GB/T44747.1-2024) | | Description (Translated English) | Building construction machinery and equipment - Concrete placing systems for stationary equipment - Part 1: Terminology and commercial specifications | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | P97 | | Classification of International Standard | 91.220 | | Word Count Estimation | 16,156 | | Date of Issue | 2024-10-26 | | Date of Implementation | 2025-05-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 44747.1-2024: Building construction machinery and equipment - Concrete placing systems for stationary equipment - Part 1: Terminology and commercial specifications ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT44747.1-2024
ICS 91.220
CCSP97
National Standard of the People's Republic of China
Construction machinery and equipment stationary concrete
Material placing machines - Part 1.Terminology and commercial specifications
(ISO 17740-1.2015, MOD)
Released on October 26, 2024
Implementation on May 1, 2025
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Categories 2
5 Size 7
6 Commercial Specifications 8
6.1 General Characteristics 8
6.2 Dimensional characteristics 9
6.3 System Characteristics 9
Reference 10
Figure 1.Standalone structure and standalone structure with balance arm and counterweight
Figure 2 Independent structure with weight 4
Figure 3.Independent structure with support 5
Figure 4 Internal climbing structure 6
Figure 5 Wall-attached structure 7
Figure 6 Schematic diagram of the working range of a fixed concrete placing boom 8
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 1 of GB/T 44747 "Construction Machinery and Equipment - Stationary Concrete Placing Booms".
The following parts have been published.
--- Part 1.Terminology and commercial specifications.
This document is modified to adopt ISO 17740-1.2015 "Construction machinery and equipment - Stationary concrete placing booms - Part 1.Terminology"
and Commercial Specifications.
This document adds a chapter on “Normative References”.
The technical differences between this document and ISO 17740-1.2015 and their reasons are as follows.
a) Change “concrete placing boom” to “fixed concrete placing boom” (see 3.1) to match the scope of this document and add the
Sexuality;
b) Change “controlstation” to “controlsystem” (see 3.5) to better fit the definition and increase operability;
c) Change “base structure” to “tower structure” (see 3.7) to distinguish it from the term in 3.11.1 and eliminate ambiguity;
d) Change “floorframe” to “climbingframe” (see 3.8) to improve the definition and description and increase operability;
e) Added the terms and definitions of internal climbing structure and wall-attached structure (see 3.13 and 3.14) to adapt to the content of Chapter 4.
The integrity of the document;
f) Added classification types, and added diagrams of independent structures with weight (see Figure 2) and floor climbing structures.
[See Figure 4a)], in order to apply my country's classification and increase the operability of this document;
g) The translation of the title of Figure 1 and its sub-figure b) has been changed to match the term 3.4 and the “Explanation of Reference Numbers” of Figure 1.
The following editorial changes have been made to this document.
--- Added informative reference GB/T 25638.1-2010;
--- Changed references.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Machinery Industry Federation.
This document is under the jurisdiction of the National Technical Committee for Standardization of Construction Machinery and Equipment (SAC/TC328).
This document was drafted by. Zoomlion Heavy Industry Science & Technology Co., Ltd., Zhejiang Xinrui Heavy Industry Technology Co., Ltd., Hunan Xiangjian Heavy Industry Technology Co., Ltd.
Co., Ltd., Langfang Kaibo Construction Machinery Technology Co., Ltd., Hangzhou Jianghe Mechanical and Electrical Equipment Engineering Co., Ltd., Sany Automobile Manufacturing Co., Ltd.,
Xuzhou XCMG Shi Weiying Machinery Co., Ltd., Xi'an University of Architecture and Technology, and Shenyang Jianzhu University.
The main drafters of this document are. Cheng Ke, Wang Jiaqian, Li Qiyang, Yu Jun, Hu Zhongbao, Cao Guowei, Fang Yi, Li Hui, Kong Shanzhong, Li Mengmeng, Zhang Ping,
Zou Defang.
introduction
Unifying and standardizing the terminology and commercial specifications of fixed concrete placing booms will help standardize the domestic fixed concrete placing boom market.
The revision of ISO 17740-1.2015 is conducive to exchanges with international peers and promotes domestic fixed
Concrete placing boom products are introduced to the world.
The unification of the terminology and commercial specifications of fixed concrete placing booms ensures the communication and cooperation between product manufacturers and users.
Smooth.
GB/T 44747 "Construction Machinery and Equipment - Fixed Concrete Placing Boom" is a standard for determining the fixed concrete placing boom.
The standardized specification is planned to consist of two parts.
--- Part 1.Terminology and commercial specifications. The purpose is to unify and standardize the terminology and commercial specifications of fixed concrete placing booms.
--- Part 2.Safety requirements. The purpose is to specify the structural and performance requirements of fixed concrete placing booms in terms of safety.
Construction machinery and equipment stationary concrete
Material placing machines - Part 1.Terminology and commercial specifications
1 Scope
This document defines the terminology and commercial specifications for stationary concrete placing booms.
This document does not apply to non-stationary or vehicle-mounted concrete placing equipment with concrete pumping systems.
2 Normative references
This document has no normative references.
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
It is installed on a fixed machine base and mainly consists of a distribution arm that can move within a certain range, a rotary assembly, a tower structure, etc., and is used for pouring concrete.
Concrete machinery and equipment.
3.2
Placing boom
The foldable boom equipped with a concrete delivery pipe is used to deliver concrete to the pouring station within the working range.
Note. A rubber hose is usually connected to the end of the delivery tube to help spread the material.
[Source. GB/T 25638.1-2010, 3.5, modified]
3.3
Rotary assembly boompedestal
A rotatable support structure connecting the fabric arm and the tower structure.
3.4
Balance arm and counterweight counter-jibandbalast
A balancing structure arranged in the opposite direction of the fabric arm to offset or partially offset the weight and bending moment of the fabric arm.
3.5
control system
Components or devices used to operate a concrete placing boom.
Note. The console includes wireless remote control, wired remote control, manual control and emergency control. When pumping and pouring concrete, the normal working position is
Remote control.
3.6
working platformworkingplatform
Typically used in work areas for installation and maintenance work.
3.7
Tower structure
A pipe column structure, truss structure or other form of structure on which a fixed boom can be installed.
Price & DeliveryUS$329.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 44747.1-2024: Building construction machinery and equipment - Concrete placing systems for stationary equipment - Part 1: Terminology and commercial specifications Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 44747.1-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 44747.1-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 44747.1-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 44747.1-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|