HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189760 (30 Nov 2024)

GB/T 41495-2022 PDF in English


GB/T 41495-2022 (GB/T41495-2022, GBT 41495-2022, GBT41495-2022)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/T 41495-2022English260 Add to Cart 0-9 seconds. Auto-delivery. Specification for truck-mounted concrete pump maintenance, repair and scrap Valid
Standards related to (historical): GB/T 41495-2022
PDF Preview

GB/T 41495-2022: PDF in English (GBT 41495-2022)

GB/T 41495-2022 NATIONAL STANDARD OF THE PEOPLE’S REPUBLIC OF CHINA ICS 91.220 CCS P 97 Specification for Truck-Mounted Concrete Pump Maintenance, Repair and Scrap ISSUED ON: APRIL 15, 2022 IMPLEMENTED ON: NOVEMBER 01, 2022 Issued by: State Administration for Market Regulation; Standardization Administration of the People’s Republic of China. Table of Contents Foreword ... 3 1 Scope ... 4 2 Normative References ... 4 3 Terms and Definitions ... 4 4 General Requirements ... 5 5 Daily Maintenance ... 6 6 Professional Daily Maintenance ... 7 7 Requirements for Replacement and Maintenance of key Components on Upper Structure ... 8 Appendix A (Normative) Maximum Allowable Load and Pre-Tightening Torque of Bolts ... 10 Appendix B (Normative) Daily Inspection Requirements List ... 12 Appendix C (Normative) Key Component Inspection Requirements List ... 14 Appendix D (Informative) Professional/User Daily Inspection and Treatment Record ... 16 Appendix E (Informative) Professional/User Inspection of Key Components and Treatment Record ... 19 Bibliography ... 22 Specification for Truck-Mounted Concrete Pump Maintenance, Repair and Scrap 1 Scope This Document specifies the general requirements for the maintenance, repair and scrap of the concrete pump truck (hereinafter referred to as the pump truck), the requirements for daily maintenance and regular maintenance, as well as the requirements for the change and maintenance of key components. This Document applies to pump trucks. 2 Normative References This Document has no normative references. 3 Terms and Definitions For the purposes of this Document, the following terms and definitions apply. 3.1 Mobile concrete pump with placing boom Mechanical equipment for the simultaneous installation of a concrete pump and a placing boom on a self-propelled chassis or on a trailer. [SOURCE: GB/T 7920.4-2016, 2.4.1.2, with modifications] 3.2 Upper structure The part of the pump truck except for the Class-II chassis that has been finalized. [SOURCE: QC/T 718-2013, 3.13, with modifications] 3.3 Key component The upper structure components whose serious failure during use shall endanger the safety of equipment and personal. 3.4 Repair maintenance of the pump truck shall be carried out according to the requirements of the pump truck manufacturer; and the chassis shall be maintained according to the requirements of the chassis manufacturer. 4.2 The pump truck that has been out of use for more than one month shall be maintained once before being reused. 4.3 On-site safety protection measures shall be implemented during on-site maintenance operations to ensure operational safety. On-site professional maintenance personnel shall be no less than 2; and special operators with certification requirements shall be certified to work. 4.4 If the high-strength bolts used for connection are loosened or reassembled, they shall be tightened with a torque wrench. The tightening torque of each type of connection thread shall meet the requirements of Appendix A. High-strength connecting bolts and nuts disassembled for structural maintenance shall not be used again; and new connecting bolts and nuts of the same grade shall be used for reassembly. 4.5 When the key component fails, it shall be shut down immediately for repair or replacement; after repair or replacement, it shall be operated according to the relevant provisions of the manufacturer, and check whether the equipment is running normally. 4.6 The key components such as boom, connecting rod, bottom frame and outrigger shall be welded by qualified personnel appointed by the equipment manufacturer. 4.7 The welding consumables for welding maintenance, materials replacement and maintenance procedures shall be approved in written by the manufacturer or professional maintenance personnel. 4.8 The maintenance of structural welds shall be recorded in the equipment file; and the equipment operator shall check it before starting each shift to confirm that there is no abnormality. The same weld repair shall not exceed 3 times, otherwise its components shall be scrapped. 4.9 The electrical wiring on the equipment shall not be modified without permission. 4.10 Solid waste generated during maintenance shall be collected and stored centrally; the remaining or discarded lubricating oil (grease) and hydraulic oil shall be placed in containers and properly disposed of. 5 Daily Maintenance 5.1 Daily inspection shall be carried out in accordance with Appendix B for each shift; and parts and components shall be visually inspected for cracks or damage according to Appendix C. The remaining parts and components shall be subject to daily maintenance according to the Maintenance Manual provided by the manufacturer. In order to ensure the inspection effect, the following actions shall be ensured before inspection: a) Clean up the rubbish, snow and other obstacles on the pump truck; b) Clean up oil stains and sundries on each working mechanism. 5.2 Any found abnormality shall be dealt with in time; so that the pump truck can reach the normal operation state. 5.3 The inspection and processing results are recorded in Appendix D. 6 Professional Daily Maintenance 6.1 In order to ensure the strict implementation of daily maintenance of the pump truck, the user of the pump truck should establish a maintenance ledger (including but not limited to data such as pumping time and pumping volume). Users shall not modify the pumping data of the pump truck equipment without permission. 6.2 The interval of professional daily maintenance is determined by the service life of the equipment, the cumulative pumping time, and the cumulative pumping volume. 6.3 For the equipment with delivery of the whole machine no more than 5 years, or the cumulative pumping time no more than 5000h, or the cumulative pumping concrete no more than 300000m3, whichever comes first, it shall be implemented according to the following inspection cycle and inspection requirements. a) Inspection cycle: every full year, or every 1000h pumped, or every 60000m3 of concrete pumped, whichever comes first. b) Inspection requirements: go to a professional maintenance agency or professional maintenance personnel for inspection and maintenance according to the requirements of Appendix C. 6.4 For the equipment with the delivery of the whole machine more than 5 years and less than or equal to 8 years, or the cumulative pumping time more than 5000h and less than or equal to 6800h, or the cumulative pumping concrete more than 300000m3 and less than or equal to 420000m3, whichever comes first, it shall be implemented according to the following inspection cycle and inspection requirements. a) Inspection cycle: every full year, or every 650h of pumped, or every 40000m3 of concrete pumped, whichever comes first. b) Inspection requirements: go to a professional maintenance agency or professional maintenance personnel for inspection and maintenance according to the requirements of Appendix C. ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.