Path:
Home >
GB/T >
Page536 > GB/T 44241-2024
Home >
Standard_List >
GB/T >
Page536 > GB/T 44241-2024
US$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 44241-2024: Virtual power plant management specification
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 44241-2024 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Virtual power plant management specification
| Valid |
GB/T 44241-2024
|
PDF similar to GB/T 44241-2024
Basic data
| Standard ID | GB/T 44241-2024 (GB/T44241-2024) |
| Description (Translated English) | Virtual power plant management specification |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.020 |
| Word Count Estimation | 14,178 |
| Date of Issue | 2024-07-24 |
| Date of Implementation | 2025-02-01 |
| Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 44241-2024: Virtual power plant management specification
---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB/T 44241-2024 English version. Virtual power plant management specification
ICS 29.020
CCSF20
National Standard of the People's Republic of China
Virtual Power Plant Management Specifications
Released on 2024-07-24
2025-02-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General Requirements 2
5 Planning, Design and Management 2
6 Construction Implementation Management 2
7 Access Detection Management 3
8 Registration and grid management 4
9 Operation Management 4
10 Operation Management 6
11 Exit Management 6
12 File Management 7
13 Verification Method 7
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Electricity Demand Side Management Standardization Technical Committee (SAC/TC575).
This document was drafted by. State Grid Zhejiang Electric Power Co., Ltd., State Electric Power Dispatching and Communication Center, China Southern Power Grid Research Institute Co., Ltd.
China Southern Power Grid Co., Ltd., China Electricity Council Technology Service Center Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd.
Lishui Power Supply Company, China Electric Power Research Institute Co., Ltd., Zhejiang Zheda Energy Technology Co., Ltd., Zhejiang Power Trading Co., Ltd.
Center Co., Ltd., Power Dispatching and Control Center of Guangdong Power Grid Co., Ltd., State Grid Jiangsu Electric Power Co., Ltd., State Grid Shanghai Electric Power Co., Ltd.
The company's Economic and Technological Research Institute, State Grid Fujian Electric Power Co., Ltd., State Grid Anhui Electric Power Co., Ltd., Southeast University, State Grid Shandong Electric Power
The company's Economic and Technological Research Institute, Suzhou Zhidian Energy Saving Technology Co., Ltd., Tianjin Anjie IoT Technology Co., Ltd., Zhejiang Huayun Information Technology Co., Ltd.
Technology Co., Ltd. and Beijing Haibosichuang Technology Co., Ltd.
The main drafters of this document are. Xiang Zhongming, Dong Shimeng, Luo Hongxuan, Zhang Feng, Liang Zhifeng, Guo Tao, He Sheng, Wang Yi, Qiu Yutao, Wang Xinyi, Wu Xiaogang,
Deng Weiss, Zhang Yao, Jiang Xuedong, Liu Qiang, Liu Zhuguang, Meng Zijie, Li Gang, Wang Xiaohui, Chen Hourong, Ma Jinhui, Gao Ciwei, Zhao Xin, Qian Yanan, Qin Ling,
Huang Bin and Guo Kai.
Virtual Power Plant Management Specifications
1 Scope
This document provides the principles for the management of the entire life cycle of virtual power plants, and stipulates the planning and design, construction and implementation, access testing, and registration of virtual power plants.
The requirements for grid connection, operation, management, withdrawal and archive management are described, and the corresponding verification methods are described.
This document applies to the planning, construction, access, testing, operation and decommissioning of virtual power plants that are connected to the grid management or participate in electricity market transactions.
Other virtual power plants shall follow suit.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 22239 Information security technology Network security level protection basic requirements
GB/T 25058 Information security technology Network security level protection implementation guide
GB/T 28448 Information security technology network security level protection assessment requirements
GB/T 32672 General technical specification for power demand response system
GB/T 36572 Guidelines for network security protection of power monitoring systems
GB 38755 Guidelines for safety and stability of power systems
GB/T 38969 Technical Guidelines for Power Systems
GB/T 39786 Information security technology Basic requirements for the application of cryptography in information systems
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Virtual power plant virtual power plant; VPP
Through advanced information and communication technology, intelligent metering and optimized control technology, distributed power supply, distributed energy storage, adjustable load, etc.
Distributed resources are integrated to form a system that can respond to grid demand, participate in power market operations or accept grid dispatch.
3.2
Virtual Power Plant Resources VPPresources
Distributed equipment or systems that can output electrical energy or provide electrical power regulation capabilities.
Note. Including but not limited to distributed power sources, distributed energy storage, adjustable loads and their combinations.
3.3
Virtual Power Plant Operator VPPoperator
The distributed resources and virtual machines with adjustable potential or power generation capacity are gathered together to participate in the power market or grid operation as a whole.
An institution that handles and represents related matters.
3.4
Virtual Power Plant Technical Support System VPPtechnicalsupportsystem
Operated by the virtual power plant operator, it provides technical support for its implementation of control strategies through two-way interactive communication of information, realizing information processing
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 44241-2024_English be delivered?
Answer: Upon your order, we will start to translate GB/T 44241-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 44241-2024_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 44241-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.