|
US$569.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 32229-2015: Road test methods for all-terrain vehicles Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 32229-2015 | English | 569 |
Add to Cart
|
5 days [Need to translate]
|
Road test methods for all-terrain vehicles
| Valid |
GB/T 32229-2015
|
PDF similar to GB/T 32229-2015
Basic data | Standard ID | GB/T 32229-2015 (GB/T32229-2015) | | Description (Translated English) | Road test methods for all-terrain vehicles | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | T80 | | Classification of International Standard | 43.020 | | Word Count Estimation | 27,240 | | Date of Issue | 2015-12-10 | | Date of Implementation | 2016-04-01 | | Quoted Standard | GB/T 8170; GB/T 5373; GB 24926; GB 24929; GB/T 24935 | | Regulation (derived from) | National Standard Announcement 2015 No.38 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the vehicle preparation work, test conditions, test methods and value rules for all-terrain vehicle road test. This standard applies to all-terrain vehicle road test. |
GB/T 32229-2015: Road test methods for all-terrain vehicles---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Road test methods for all-terrain vehicles
ICS 43.020
T80
National Standards of People's Republic of China
All - terrain vehicle road test method
2015-12-10 released
2016-04-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface III
1 Scope 1
2 normative reference document 1
General 1
4 have the special requirements of the performance test method 3
5 speed meter check method 4
6 Maximum speed test method 5
7 Minimum stable speed test method (except for vehicles with automatic clutch) 6
8 Accelerated performance test method 7
9 coasting distance test method (not applicable to all-terrain vehicles with stepless speed change, automatic gearshift and automatic clutch) 8
Test method for climbing ability
11 Test method for parking performance 9
Test method of deviation deviation
13 Handling stability test method 10
14 terrain through the performance test method 11
Appendix A (informative) Test Record Form 13
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed and centralized by the National Four-wheel All-terrain Standardization Technical Committee (SAC/TC344).
This standard is responsible for drafting units. Shanghai Motor Vehicle Testing Center.
This standard participates in the drafting unit. Jinhua Entry-Exit Inspection and Quarantine Bureau, National Motorcycle Quality Supervision and Inspection Center, Jiangsu Linhai Power Machinery
Group Co., Ltd., Chongqing Construction Motorcycle Co., Ltd., China Quality Certification Center, Zhejiang Chunfeng Power Co., Ltd., Nanchang Motorcycle
Quality Supervision and Inspection Institute, Qianjiang Motor Co., Ltd., Zhejiang Feishen Vehicle Industry Co., Ltd., Xingyue Group Co., Ltd., Chongqing Aerospace Bashan Mount
Bicycle Co., Ltd., National Motorcycle Quality Supervision and Inspection Center (Chongqing).
The main drafters of this standard. Jiang Yong, Shi Junxiao, Jia Quanli, Dai Lei, Zhou Ji, Gao Jun, Ding Jianli, Chen Jianfa, Yuan Jianjun, Shen Changqun, Yang Limin,
Zhu Zhu, He Dajun.
All - terrain vehicle road test method
1 Scope
This standard specifies the vehicle preparation work, test conditions, test methods and value rules for all-terrain road test.
This standard applies to all-terrain vehicle road tests.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Representation and Judgment of Numerical Correction Rule and Limit Value of GB/T 8170
Method for determination of size and quality parameters of motorcycles and mopeds GB/T
GB 24926 All terrain vehicle braking performance requirements and test methods
GB 24929 All-terrain vehicle speeding noise limits and measurement methods
Test method for maximum roll stability angle of all - terrain vehicle GB/T 24935
3 General
3.1 Preparation before trial
3.1.1 Check and adjust by commission
3.1.1.1 The test vehicle must be accompanied by a maintenance manual or related technical documentation.
3.1.1.2 Check the name, trademark, model, vehicle identification code, engine number and date of manufacture of the test vehicle manufacturer and record.
3.1.1.3 Check the assembly of the assembly, parts, accessories, assembly quality and integrity of the exposed parts are visible damage, the vehicle tool is
No complete According to the use of maintenance instructions or the provisions of the relevant technical documents to check the tightening of important fasteners, the lubrication point of the lubricating oil
(Fat) filling and sealing conditions, the electrical system can work properly, the operating system and the braking system can work properly.
3.1.1.4 It is permissible to adjust the test vehicle in accordance with the maintenance instructions or the relevant technical documentation to make it in a normal technical condition.
3.1.2 by the test run away
3.1.2.1 The test vehicle shall be carried out on a flat road with a relatively small slope in accordance with the maintenance instructions or the relevant technical documents.
3.1.2.2 During the period of operation should always check the various parts of the vehicle tightening and working conditions, timely adjustment, troubleshooting, and detailed records
Barrier situation. The distance is.200km. If the production enterprises have to go with the standard, according to corporate norms to go together.
3.1.2.3 The details of the walking process are recorded in Table A.1 as specified in Appendix A.
3.1.2.4 After maintenance, follow the maintenance manual.
3.1.3 size and quality of the test
If necessary, you can measure the size and quality of the test vehicle according to GB/T 5373 before the performance test.
3.2 General test conditions
3.2.1 commissioned
3.2.1.1 The fuel and lubricating oil grades and mixing ratios used in the test vehicle shall comply with the provisions of the technical documentation of the vehicle (if necessary,
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 32229-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 32229-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 32229-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 32229-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|