Path: Home > GB/T > Page536 > GB/T 30155-2013 Home > Standard_List > GB/T > Page536 > GB/T 30155-2013
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 30155-2013 | English | 419 |
Add to Cart
|
3 days [Need to translate]
|
Technical guide for smart substation
| Valid |
GB/T 30155-2013
|
PDF similar to GB/T 30155-2013
Basic data | Standard ID | GB/T 30155-2013 (GB/T30155-2013) | | Description (Translated English) | Technical guide for smart substation | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F20 | | Classification of International Standard | 29.240.10 | | Word Count Estimation | 18,131 | | Quoted Standard | GB 1094.1; GB 1094.2; GB 1094.3; GB/T 1094.4; GB 1094.5; GB 1984; GB 1985; GB/T 2900.15; GB/T 2900.50; GB/T 2900.57; GB 7674; GB/T 11022; GB/T 14285; GB/T 19862; GB/T 20840.5; GB/T 20840.7; GB/T 20840.8; GB/T 25931; DL/T 282; DL/T 478; DL/T 634.5104; DL/T | | Regulation (derived from) | National Standards Bulletin No. 25 of 2013 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the terms and definitions related to intelligent substation, clear principles of intelligent substation technology, architecture and functional requirements for smart substation equipment, testing, design, commissioning, operation |
GB/T 30155-2013: Technical guide for smart substation---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical guide for smart substation
ICS 29.240.10
F20
National Standards of People's Republic of China
Smart Substation Technical Guidelines
Issued on. 2013-12-17
2014-08-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations 1
4 General 3
5 3 Architecture
6 major equipment and functional requirements 4
7 Design 9
8 detects 10
9 Debugging 10
Operation and maintenance 10 10
Appendix A (informative) intelligent substation communication network and system basic architecture diagram 12
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the China Electricity Council.
This standard is drafted by. State Grid Corporation.
Participated in the drafting of this Standard. China Electric Power Research Institute, State Grid Electric Power Research Institute, China Power Engineering Consulting Group Corporation,
Southern China Power Grid Co., Ltd., Jiangsu Provincial Electric Power Design Institute, China Southern Power Grid Co., Ltd. Research Institute, Tsinghua University, XJ Group
Co., Ltd., Beijing Sifang Automation Co., Ltd.
Drafters of this standard. Shen Jiang, Liu and promising, Huang Fang, Ni Yimin, Zhou Ze Xin, Li Zhenyu, Chen Zhirong, Luo Jie Yi, Su Lin, PROCEEDINGS
Easy Yonghui, Ren Yanming, Xiao Yan, Cao unity, Xu Jing, Ya floor, Lin Fan Tao, Li Juan, Zhao Ying Ke, Bai Jingfen, Zhang Yan, Yang Wei, Xiao Liang, Zhang,
Zhang Haibin, Chen Shuo, white bell, Zhaoyan Ru.
Introduction
Intelligent substation as an important part of the smart grid in China has experienced pilot construction of smart substation should have the skills
Art features and basic technical requirements have a more mature understanding, in order to better guide the direction of intelligent substation technology to promote smart substation
Equipment and systems development, to promote the standard design and construction of intelligent substation formulated standards.
Currently there is no international standard intelligent substation. These requirements are based on the current state of the art intelligent substation construction, fully taking into account
Trends in technology development.
The standard preparation process, solicit scheduling, production, infrastructure, design, research, manufacturing and related equipment, such as multi Committee for Standardization
Surface observations, absorbed the latest achievements of smart grid research at home and abroad.
Smart Substation Technical Guidelines
1 Scope
This standard specifies the terms and definitions related to intelligent substation, a clear technical principles intelligent substation, architecture and function to
Demand for intelligent substation equipment, testing, design, commissioning, operation and maintenance and other sectors to make provision.
This standard applies to 110 (66) kV ~ 750kV voltage level intelligent substation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 1094 (all parts) Power Transformer
GB 1984 AC high voltage circuit breakers
GB 1985 high-voltage AC disconnectors and earthing switches
GB/T 2900.15 Electrotechnical terminology transformers, transformers, regulators and reactors
GB/T 2900.50 Electrotechnical terminology Generation, transmission and distribution of generic terms
GB/T 2900.57 Electrotechnical terminology Generation, transmission and distribution operations
GB 7674 rated voltage of 72.5kV and above the gas-insulated metal-enclosed switchgear
GB/T 11022 common technical requirements for high-voltage switchgear and control equipment standards
GB/T 14285 Technical Specification for automatic protection and safety devices
GB/T 19862 General requirements for power quality monitoring equipment
GB/T 20840 (all parts) transformer
Precision clock GB/T 25931 network measurement and control systems synchronization protocol
DL/T 282 units combined technical conditions
DL/T 478 relay protection and automatic safety devices General
DL/T 634.5104 Telecontrol equipment and systems - Part 5-104. Transmission protocols using standard transmission protocol set IEC
60870-5-101 network access
DL/T 663 220kV ~ 500kV power system fault recording device dynamic testing requirements
DL/T 860 (all parts) substation communication networks and systems
DL/T 890 (all parts) Energy management system application program interface (EMS-API)
DL/T 1092 power system security and stability control system General technical conditions
DL/T 1100 (all parts) power system time synchronization system
3 Terms and definitions, abbreviations
3.1 Terms and Definitions
GB/T 2900.15, GB/T 2900.50, GB/T 2900.57, DL/T 860.1 and DL/T 860.2 and the following terms defined in
And definitions apply to this document.
Price & DeliveryUS$419.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30155-2013: Technical guide for smart substation Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30155-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30155-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30155-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30155-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|