GB 44171-2024: Safety management requirements for important load lifting operation in shipbuilding
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 44171-2024English379 Add to Cart 4 days [Need to translate] Safety management requirements for important load lifting operation in shipbuilding Valid GB 44171-2024

PDF similar to GB 44171-2024


Standard similar to GB 44171-2024

GB/T 7094   CB 1146.9   CB 1146.8   GB 44172   GB 44170   

Basic data

Standard ID GB 44171-2024 (GB44171-2024)
Description (Translated English) Safety management requirements for important load lifting operation in shipbuilding
Sector / Industry National Standard
Classification of Chinese Standard U09
Classification of International Standard 13.100
Word Count Estimation 18,141
Date of Issue 2024-06-25
Date of Implementation 2025-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB 44171-2024: Safety management requirements for important load lifting operation in shipbuilding


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Safety management requirements for important load lifting operation in shipbuilding Safety management requirements for lifting operations of heavy items in shipbuilding Safety management requirements for important load lifting operation in shipbuilding ICS 13.100 CCS U 09 National Standards of People's Republic of China Released on 2024-06-25 2025-01-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... 1 Scope ... 2 Normative referenced documents ... 3 Terms and Definitions ... 4 General requirements ... 4.1 Scope of Major Articles ... 4.2 General safety requirements ... This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed and coordinated by the Ministry of Industry and Information Technology of the People's Republic of China. Safety management requirements for lifting operations of heavy items in shipbuilding

1 Scope

This document stipulates the general requirements, management responsibilities, and requirements of personnel in heavy-duty lifting operations in shipbuilding enterprises. Requirements, safety requirements for heavy-duty lifting operations and emergency management requirements. This document applies to the safety management of heavy-unit lifting operations in shipbuilding enterprises.

2 Normative references

This document has no normative references.

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Hull rings A metal structural ring installed on a ship's hull section or other component to connect the lifting slings during lifting operations. 3.2 Joint lifting The two cranes are connected in an appropriate manner, with one crane controlling both cranes to perform joint lifting. The way. 3.3 Multi crane lifting A method in which two or more cranes are controlled and operated separately to lift the same object.

4 General requirements

4.1 Scope of major items Heavy items should be hoisted objects that meet any of the following conditions. The lifting load of a single lifting equipment exceeds 90% of the rated lifting capacity; a) Valuable equipment with an economic value of RMB 10 million or more, or key equipment that directly affects the completion of the task; b) Use cranes to lift together or two cranes, and the load borne by one crane is equal to or exceeds its rated lifting capacity. 70%; c) Objects that are oversized, irregular in shape, or have a shifted center of gravity that may collide with the crane during lifting operations. d) Note. On this basis, shipbuilding enterprises determine the scope of major parts according to their production and operation characteristics and the conditions of their lifting equipment. 4.2 General safety requirements 4.2.1 Lifting operators should obtain a special equipment operator certificate before taking up their posts, hold the certificate and undergo regular review. 4.2.2 Lifting operators should wear personal protective equipment as required and comply with safety regulations and operating procedures. 4.2.3 Crane operators should be familiar with the structure, performance and lifting command signals of the crane. If any abnormality is found in the crane, the crane operator should stop the crane immediately.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 44171-2024_English be delivered?

Answer: Upon your order, we will start to translate GB 44171-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 44171-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB 44171-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.