HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB 44172-2024 English PDF

US$379.00 ยท In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 44172-2024: Safety management requirements for hot work in shipyard
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 44172-2024English379 Add to Cart 4 days [Need to translate] Safety management requirements for hot work in shipyard Valid GB 44172-2024

PDF similar to GB 44172-2024


Standard similar to GB 44172-2024

GB/T 7094   CB 1146.9   CB 1146.8   GB 44171   GB 44170   

Basic data

Standard ID GB 44172-2024 (GB44172-2024)
Description (Translated English) Safety management requirements for hot work in shipyard
Sector / Industry National Standard
Classification of Chinese Standard U09
Classification of International Standard 13.100
Word Count Estimation 18,115
Date of Issue 2024-06-25
Date of Implementation 2025-01-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB 44172-2024: Safety management requirements for hot work in shipyard

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Safety management requirements for hot work in shipyard Safety management requirements for open flame operations in shipbuilding ICS 13.100 CCS U 09 National Standards of People's Republic of China Released on 2024-06-25 2025-01-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... 1 Scope ... 2 Normative referenced documents ... 3 Terms and Definitions ... 4 Classification of open flame work ... 4.1 Assignment Grading ... 4.2 Level 1 Open Flame Operation ... 4.3 Secondary open flame work ... 4.4 Level 3 Open Flame Operation ... This document applies to the safety management of open flame operations in shipbuilding enterprises.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document. GB 9448 Welding and cutting safety GB 39800.1 Specification for personal protective equipment Part 1.General

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Hot work Work involving exposed flames and hot workpieces. Note. This includes hot work such as welding, gas cutting, cutting, carbon arc gouging, pyrotechnic correction, etc. 3.2 confined space Closed or partially closed, not designed as a fixed workplace, people can enter to work, which may cause toxic, harmful, flammable and explosive substances Spaces where matter accumulates or oxygen content is insufficient.

4 Open flame work classification

4.1 Assignment Grading Enterprises should classify open flame operations according to the complexity, danger and hazard of the on-site operating environment. It is divided into three levels. level one open flame operation, level two open flame operation and level three open flame operation. 4.2 Level 1 open flame operation Level 1 open flame operations are mainly carried out in the following places/parts/areas. Ship space/part/area. a) Fuel tank after refueling/gassing; 1) Tanks, cabinets, boxes, piping systems, equipment, etc. that carry oil/gas or have not been cleaned of oil/gas after unloading; 2) Pressure vessels and pipelines in operation; 3) With inflammable and explosive compartments, refrigerant compartments, etc.; 4)

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 44172-2024_English be delivered?

Answer: Upon your order, we will start to translate GB 44172-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 44172-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB 44172-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.