HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB > Page53 > GB 30736-2014                   Home > Standard_List > GB > Page53 > GB 30736-2014

GB 30736-2014 English PDF

US$279.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 30736-2014: The limitation on infilling components of sea reclamation and enclosure project
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 30736-2014English279 Add to Cart 3 days [Need to translate] The limitation on infilling components of sea reclamation and enclosure project Valid GB 30736-2014

PDF similar to GB 30736-2014


Standard similar to GB 30736-2014

GB/T 17742   GB 55018   DB/T 60   GB/T 50547   GB 55017   GB/T 40112   

Basic data

Standard ID GB 30736-2014 (GB30736-2014)
Description (Translated English) The limitation on infilling components of sea reclamation and enclosure project
Sector / Industry National Standard
Classification of Chinese Standard P13
Classification of International Standard 07.060; 93.020
Word Count Estimation 12,179
Date of Issue 6/9/2014
Date of Implementation 4/1/2015
Quoted Standard GB/T 12763.8; GB/T 14583; GB/T 14550; GB/T 17108; GB/T 17138; GB/T 17141; GB 17378.1; GB 17378.2; GB 17378.3; GB 17378.5; GB 17378.7; GB 18668; GB/T 22105.1; GB/T 22105.2; GB/T 22105.3; HJ/T 166; HJ 491
Regulation (derived from) National Standards Bulletin No. 11 of 2014
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Standard specifies the fill material reclamation project material requirements and classification requirements and sample collection and testing methods. This Standard applies to People's Republic of China within the jurisdiction of the waters around

GB 30736-2014: The limitation on infilling components of sea reclamation and enclosure project

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
The limitation on infilling components of sea reclamation and enclosure project ICS 07.060; 93.020 P13 National Standards of People's Republic of China Reclamation works filling material composition limits Issued on. 2014-06-09 2015-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

The standard Chapter 4 and 5 are mandatory, other content are recommended. This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard was proposed by the State Oceanic Administration. This standard by the National Standardization Technical Commission for Oceanography (SAC/TC283) centralized. This standard was drafted. National Marine Environmental Monitoring Center, State Oceanic Administration, Marine Consulting Center. The main drafters of this standard. Yang Xinmei, Xu Lina, Han Dragon, Zhang Yonghua, Fuyuan Bin. Reclamation works filling material composition limits

1 Scope

This standard specifies the filling material reclamation project material requirements and classification requirements and sample collection and detection methods. This standard applies to the jurisdiction of the People's Republic of China sea reclamation works within the detection and evaluation of filling material.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 12763.8 specification for oceanographic survey - Part 8. Marine Geology Geophysical Survey GB/T 14583 environmental terrestrial γ radiation dose rate measurement specification GB/T 14550 Determination of BHC and DDT in soil by gas chromatography GB/T 17108 marine function zoning Technical Guidelines Flame atomic GB/T 17138 Soil quality copper, zinc absorption spectrophotometry GB/T 17141 Soil quality lead and cadmium by graphite furnace atomic absorption spectrophotometry GB 17378.1 marine monitoring Part 1. General GB 17378.2 specification for marine monitoring Part 2. Data processing and quality control analysis GB 17378.3 specification for marine monitoring Part 3. Sample collection, storage and transportation GB 17378.5 specification for marine monitoring Part 5. Sediment analysis GB 17378.7 specification for marine monitoring Part 7. Ecological survey of offshore pollution and biological monitoring GB 18668 marine sediment quality GB/T 22105.1 soil quality total mercury, total arsenic, total lead Atomic fluorescence spectrometry - Part 1. Determination of total mercury in soil GB/T 22105.2 soil quality total mercury, total arsenic, total lead Atomic fluorescence spectrometry - Part 2. Determination of total arsenic in soil GB/T 22105.3 soil quality total mercury, total arsenic, total lead Atomic fluorescence spectrometry - Part 3. Determination of total lead in soil HJ/T 166 soil environmental monitoring technical specifications Flame atomic HJ491 total chromium in soil absorption spectrophotometry

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Reclamation project seareclamationandenclosureproject Around the sea and reclamation in general. By means of a cofferdam or embankment enclosure for sea reclamation projects. In ocean engineering circle surrounded by the sea Region, with gravel, dirt and other substances formed land fill for reclamation. 3.2 Reclamation works filling substance infilingcomponentsofseareclamationandenclosureproject In the reclamation project for the enclosure and fill a specific range of used waters and adjacent waters of Environmental Quality does not produce unacceptable Solid or semi-solid substances that damage, generally include an inert inorganic geological material, inert construction and demolition materials, dredged material and the like. 3.3 Background values environmentalbackgroundvalue Environmental levels of various elements of the reclamation project before implementation. 3.4 Inert inorganic geological material inertinorganicgeologicalmaterial Pollution and low organic matter content, and not the surrounding environment after throwing fill significant chemical reactions inorganic geological material is not subject to. 3.5 Inert construction and demolition materials constructionanddemolitionmaterial Construction, renovation, demolition and other works produced not contaminated and low organic matter content of the construction waste and spoil, and after throwing filled not Waters surrounding environment significant chemical reaction, their material composition of gravel, sand, clay, concrete, rubble and bricks and the like.

4 filling material reclamation project material requirements and classification

4.1 filling material reclamation project material requirements Reclamation works fill material should not contain metallurgical waste, mining waste, fuel waste, chemical waste, municipal solid waste (inert demolition Construction materials excluded), hazardous waste, agricultural waste, wood waste, plant debris and clear a large animal carcasses and other damage to the marine environment quality substance. 4.2 reclamation project filled the classification of substances Categories reclamation in filling substances shall meet the requirements of marine sediment quality of marine functional zones GB/T 17108 stipulated. 4.2.1 coastal reclamation fill material 4.2.1.1 The first coastal reclamation fill material Material 4.1 compliance, in line with the size of the block reclamation projects in the dam or cofferdam design requirements, in line with GB 18668 first Marine functional areas of substance use class marine sediment quality requirements for first class coastal reclamation fill material. 4.2.1.2 The second category coastal reclamation fill material Material 4.1 compliance, in line with the size of the block reclamation projects in the dam or cofferdam design requirements, in line with the second GB 18668 Marine functional areas of substance use class marine sediment quality requirements for the second class coastal reclamation fill material. 4.2.1.3 The third coastal reclamation fill material Material 4.1 compliance, in line with the size of the block reclamation projects in the dam or cofferdam design requirements, in line with GB 18668 Third Marine functional areas of substance use class marine sediment quality requirements for the third-class coastal reclamation fill material. 4.2.2 reclamation fill material Material 4.1 compliance, in line with the third substances coastal reclamation fill material composition limits required for the filling material reclamation.

5 reclamation projects require the use of filler material

5.1 Basic requirements Intended for filling material reclamation works shall comply with the provisions of Chapter 4, and should be carried out before use to detect its composition, does not comply with Chapter 4 Regulations and without substance should not be detected as an ingredient reclamation project filled with substance use. 5.2 Components of index Reclamation works filling material composition detection indicators include. material, odor, monolithic body weight, relative density, mercury, cadmium, lead, zinc, copper, chromium, Arsenic, organic carbon, sulfur compounds, petroleum, BHC, DDT, PCBs, coliform and γ radiation dose rate. 5.3 composition limits Reclamation project component for each fill mass index detection limits are listed in Table 1. Table 1 reclamation project filled with material composition limits Reference index first class second class third class

1 Material

It should not contain metallurgical waste, mining waste, fuel waste, chemical waste, municipal solid waste (inert demolition Except for construction materials), hazardous waste, agricultural waste, wood waste, plant debris and clear a large animal Damage to the marine environment, the quality of the material body, etc. 2 smell no smell, stench

3 body weight in line with the size of a single block reclamation projects in the dam or cofferdam design requirements

4 relative density greater than the relative density of construction sea water

5 ωd (Hg) (× 10-6) 0.20 0.50 1.20 6 ωd (Cd) (× 10-6) 0.50 1.50 6.00 7 ωd (Pb) (× 10-6) 60.0 130.0 300.0 8 ωd (Zn) (× 10-6) 150.0 350.0 720.0 9 ωd (Cu) (× 10-6) 35.0 100.0 240.0 10 ωd (Cr) (× 10-6) 80.0 150.0 324.0 11 ωd (As) (× 10-6) 20.0 65.0 112.0 12 ωd (OC) (× 10-2) 2.0 3.0 5.0 13 ωd (S2 -) (× 10-6) 300.0 500.0 720.0 14 ωd (oil) (× 10-6) 500.0 1000.0 1800.0 15 ωd (666) (× 10-6) 0.50 1.00 1.80 16 ωd (DDT) (× 10-6) 0.02 0.05 0.12 17 ωd (PCBs) (× 10-6) 0.02 0.20 0.72 18 coliform bacteria than the number of wet weight/(a / g, wet weight) 200 Implementation of environmental background values before a certain area γ radiation dose rate 19 γ radiation dose rate/(nGy/h) is not greater than reclamation project 5.4 Evaluation Method The sample to be used for reclamation in the fill mass index of each component detection detection value and the corresponding category in Table 1. Comparative composition limits, like Each product component detection index detection value did not exceed the respective substance category in Table 1 component limit requirements as the category reclamation project filled substance.

6 reclamation in sample collection and testing methods filling substance

6.1 Sample Collection Reclamation project filled with material collected samples should comply with the provisions of Appendix A. 6.2 Sample Detection Reclamation in the seabed dredged material and other substances from the waters fill detect sample, using the method set out in Table 2. Inert inorganic ground Material and inert construction and demolition materials, etc. from the land reclamation project filled with the test substance in a sample, using the method set out in Table 3. sample Fill the test results "reclamation project filled material component detecting Report" (see Appendix B). Reclamation fill material sample detection method Table 2 sea-borne Wai No. Item reference standard analytical method detection limit

1 Material visual method

2 smell sensory method

3 body size visual method

4 relative density pycnometer method GB/T 12763.8 5 ωd (Hg) Atomic Fluorescence Spectrometry 0.002 × 10-6 GB 17378.5 6 ωd (Cd) flameless atomic absorption spectrophotometry 0.04 × 10-6 GB 17378.5 7 ωd (Pb) flameless atomic absorption spectrophotometry 1.0 × 10-6 GB 17378.5 8 ωd (Zn) by flame atomic absorption spectrophotometry 6 × 10-6 GB 17378.5 9 ωd (Cu) flameless atomic absorption spectrophotometry 0.5 × 10-6 GB 17378.5 10 ωd (Cr) flameless atomic absorption spectrophotometry 2.0 × 10-6 GB 17378.5 11 ωd (As) Atomic Fluorescence Spectrometry 0.06 × 10-6 GB 17378.5 12 ωd (OC) potassium dichromate oxidation - reduction volumetric method GB 17378.5 13 ωd (S2-) Iodometry 4.0 × 10-6 GB 17378.5 14 ωd (oil) UV spectrophotometry 1.0 × 10-6 GB 17378.5 15 ωd (666) Gas Chromatography α-666. 3pg γ-666. 4pg β-666. 3pg δ-666. 5pg GB 17378.5 16 ωd (DDT) Gas Chromatography pp'-DDE. 4pg op'-DDT. 11pg pp'-DDD. 6pg pp'-DDT. 18pg GB 17378.5 17 ωd (PCBs) by Gas Chromatography 59 × 10-6 GB 17378.5 18 coliform wet weight ratio of the number of fermentation GB 17378.7 19 γ radiation dose rate γ radiation dose rate meter method GB/T 14583 Table 3 material sample detection methods derived land reclamation project filled No. Item reference standard analytical method detection limit

1 Material visual method

2 smell sensory method

3 body size visual method

4 relative density pycnometer method GB/T 12763.8 5 ωd (Hg) Atomic Fluorescence Spectrometry 0.002 × 10-6 GB/T 22105.1 6 ωd (Cd) graphite furnace atomic absorption spectrophotometry 0.01 × 10-6 GB/T 17141 7 ωd (Pb) Atomic Fluorescence Spectrometry 0.06 × 10-6 GB/T 22105.2 8 ωd (Zn) by flame atomic absorption spectrophotometry 0.5 × 10-6 GB/T 17138 9 ωd (Cu) by flame atomic absorption spectrophotometry 1 × 10-6 GB/T 17138 10 ωd (Cr) by flame atomic absorption spectrophotometry 5 × 10-6 HJ491 11 ωd (As) Atomic Fluorescence Spectrometry 0.01 × 10-6 GB/T 22105.3 12 ωd (OC) --- potassium dichromate oxidation reduction volumetric method GB 17378.5 13 ωd (S2-) Iodometry 4 × 10-6 GB 17378.5 14 ωd (oil) UV spectrophotometry 2 × 10-6 GB 17378.5 15 ωd (666) Gas Chromatography α-BHC. 3.57 × 10-12g β-BHC. 3.73 × 10-12g γ-BHC. 1.18 × 10-12g δ-BHC. 9.79 × 10-13g GB/T 14550 16 ωd (DDT) Gas Chromatography p · p'-DDE. 1.76 × 10-12g o · p'-DDT. 7.56 × 10-12g p · p'-DDD. 5.57 × 10-12g p · p'-DDT. 1.47 × 10-12g GB/T 14550 17 ωd (PCBs) by Gas Chromatography 59 × 10-6 GB 17378.5 18 coliform wet weight ratio of the number of fermentation GB 17378.7 19 γ radiation dose rate γ radiation dose rate meter method GB/T 14583 6.3 Sample Collection and testing quality control requirements Undertake reclamation works filling material sample collection and testing work units should be certified through the measurement, the operator should be the holder on field Post. Quality control of sampling, testing and other aspects of data processing should be consistent with GB 17378.1, GB 17378.2, GB 17378.3 and HJ/T 166 requirements related.

Appendix A

(Normative) Reclamation project filled with material sample collection requirements A.1 Sample Tools Sampling tools include. --- Sampling shovel; --- Bamboo or bamboo knife; --- Cores sampler; --- Sample bags lined with plastic film or glass jar. A.2 sampling points and the sampling level laid A.2.1 Sampling Spot Location A.2.1.1 reclamation project will be prepared for filling material coverage area is divided into equal-area grids, each grid set a sampling point. A.2.1.2 When the regional distribution coverage area greater than or equal 20hm2, each 20hm2 laid least one sampling point, insufficient Based upon a sampling point 20hm2 the layout. When drawn from the regional distribution area of less than 20hm2, laid at least two sampling points. A.2.2 Sampling level When intended for reclamation in the thickness of the filling material is greater than 20cm stacked, should be layered samples. Surface sampling depth of 0 ~ 20cm, Self The surface layer down sampling, each additional 50cm, set up a sampling level, is still a lack of 50cm sample level. A.3 Sample Collection A.3.1 Table A.1 sampling shall be completed in the form sampling registration form. A.3.2 sample volume should meet the needs of samples tested, the sample volume generally less than 1kg. A.3.3 case when sampling bulk matter, using its smash hit emulated, whichever part of the sample pieces. Section A.3.4 after measurement sample or metal organic compounds, application Shinai (bamboo) to remove contact with a metal or plastic sampler sampling. A.3.5 Determination of metal samples should be packed in bags lined with plastic film samples, samples of organic compounds should be measured in full bloom in a wide-mouth glass Bottle. A.3.6 sample storage container preservation methods and sample pretreatment methods, according to the relevant provisions of GB 17378.3 or HJ/T 166 in carried out. Table A.1 reclamation project filled with material sampling registration form Reclamation Project Name Sampling date Date Marine functional zones where the reclamation project name Filled with substance use □ □ enclosed sea reclamation Sampling Unit Name (Seal) Metrology Accreditation Certificate No Sampling locations provinces (autonomous regions and municipalities) City (county, city) township (town, street) Sampling locations where the sea Sample No. Sample point number Geographical coordinates North latitude and longitude A material level of odor sampling block size b a coastal reclamation fill material filling substance the following situations. a) depending on the material to fill in the specific circumstances of the names. 1) inert inorganic geological material; 2) inert construction and demolition materials; 3) dredged material; 4) Other (specify when selecting the specific name of the material). b) whether the material contains. 1) metallurgical waste, mining waste, fuel waste, chemical industry waste and other industrial waste; 2) agricultural waste; Except 3) of municipal solid waste (inert construction and demolition materials); 4) hazardous wastes; 5) wood waste; 6) significant large-scale plant debris and animal carcasses; 7) other hazardous wastes. b intended for reclamation fill material may not fill this. Sampling people reviewer

Appendix B

(Normative) Substance composition testing report reclamation project filled Table B.1 is a reclamation project filled with material detection report. Table B.1 reclamation project filled with material composition testing report Page of Reclamation Project Name Date The date furnished Marine functional zones where the reclamation project name Filled with substance use □ □ enclosed sea reclamation Detection Unit Name (Seal) Metrology Accreditation Certificate No Sampling locations provinces (autonomous regions and municipalities) City (county, city) township (town, street) Sampling locations where the sea No. Test Indicators Sample No

1 a material

2 Odor

3 body size b

The relative density of 4 5 ωd (Hg) (× 10-6) 6 ωd (Cd) (× 10-6) 7 ωd (Pb) (× 10-6) 8 ωd (Zn) (× 10-6) 9 ωd (Cu) (× 10-6) 10 ωd (Cr) (× 10-6) 11 ωd (As) (× 10-6) 12 ωd (OC) (× 10-2) 13 ωd (S2 -) (× 10-6) 14 ωd (Oil) (× 10-6) 15 ωd (666) (× 10-6) 16 ωd (DDT) (× 10-6) 17 ωd (PCBs) (× 10-6) 18 coliform bacteria than the number of wet weight/(number/g) 19 γ radiation dose rate/(nGy/h) The same as a fill in the content and requirements of Table A.1. b intended for reclamation fill material may not fill this. Informant reviewer

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 30736-2014_English be delivered?

Answer: Upon your order, we will start to translate GB 30736-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 30736-2014_English with my colleagues?

Answer: Yes. The purchased PDF of GB 30736-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information