HOME   Cart(0)   Quotation   About-Us Tax PDFs Standard-List Powered by Google www.ChineseStandard.net Database: 189759 (16 Mar 2025)

GB/Z 37150-2018 PDF English


Search result: GB/Z 37150-2018 English: PDF (GB/Z37150-2018)
Standard IDContents [version]USDSTEP2[PDF] delivered inName of Chinese StandardStatus
GB/Z 37150-2018English150 Add to Cart 0-9 seconds. Auto-delivery. Guide of Risk Assessment of EMC Reliability Valid


PDF Preview: GB/Z 37150-2018


GB/Z 37150-2018: PDF in English (GBZ 37150-2018)

GB/Z 37150-2018 NATIONAL STANDARDIZATION TECHNICAL GUIDANCE DOCUMENT OF THE PEOPLE’S REPUBLIC OF CHINA ICS 33.100 L 06 Guide of Risk Assessment of EMC Reliability ISSUED ON: DECEMBER 28, 2018 IMPLEMENTED ON: JULY 01, 2019 Issued by: State Administration for Market Regulation; Standardization Administration of PRC. Table of Contents Foreword ... 3 1 Scope ... 4 2 Normative References ... 4 3 Terms and Definitions ... 4 4 Purpose and Role of EMC Risk Assessment ... 5 4.1 Overview ... 5 4.2 Purpose and role ... 5 5 EMC Risk Assessment Objects ... 6 6 Risk Criteria ... 6 7 EMC Risk Assessment Process ... 7 7.1 Overview ... 7 7.2 Identifying environmental information ... 8 7.3 Risk identification ... 9 7.4 Risk analysis ... 10 7.5 Risk assessment ... 12 8 Risk Assessment Tools ... 12 9 Risk Assessment Report Requirements ... 13 Appendix A (Informative) EMC Risk Management ... 14 Appendix B (Informative) Example of Assessment Tools of EMC Risk Assessment ... 18 Bibliography ... 21 Guide of Risk Assessment of EMC Reliability 1 Scope This technical guidance document gives guidelines on the purpose and role of risk assessment of electromagnetic compatibility (hereinafter referred to as “EMC”), risk assessment tarts, risk criteria, risk assessment processes, risk assessment tools, risk assessment reporting requirements. This technical guidance document is applicable to guide the selection of appropriate EMC risk assessment techniques; so that assess the EMC risk of at the levels of equipment, system and engineering site. This technical guidance document does not cover all techniques for EMC and risk assessment; the techniques not described here do not mean it is invalid. 2 Normative References The following documents are essential to the application of this document. For the dated documents, only the versions with the dates indicated are applicable to this document; for the undated documents, only the latest version (including all the amendments) are applicable to this document. GB/T 4365-2003 Electrotechnical Terminology - Electromagnetic Compatibility GB/T 23694-2013 Risk Management - Vocabulary 3 Terms and Definitions For the purpose of this document, the terms and definitions given in GB/T 4365-2003 and GB/T 23694-2013 and the following apply. 3.1 Risk assessment The whole process of risk identification, risk analysis and risk assessment. 3.2 Risk level The levels of risk assessment elements when making the risk assessment. The main roles of EMC risk assessment include: --- Identify the EMC risk and potential impact under specific tarts of equipment, system or engineering site; --- Increase understanding of EMC risk to facilitate the correct selection of risk response strategies; --- Identify the major factors that contribute to EMC risk and the weak links of EMC risk in equipment, system or engineering site; --- Analyze the EMC risk and uncertainties; --- Conducive to establish design principles; --- Help to determine whether the EMC risk is acceptable; --- Conducive to prevent EMC problems through additional measures; --- May be used as an input to risk management, and may be effectively linked to other components of the risk management process. 5 EMC Risk Assessment Objects EMC risk assessment may, according to different objects, be divided into equipment level, system level and engineering site level. The specific technical indicators as the assessment targets include the single, multiple or full EMC indicators of equipment, system and site. Equipment-level EMC risk assessment applies to the specific equipment (such as laptops, automotive parts, etc.); it shall assess the EMC risks facing the equipment structure and circuit board. System-level EMC risk assessment applies to the system (for instance, complete vehicle, etc.) consists of the products; it shall assess the EMC risks facing product itself or inter-product in the system. Engineering-site-level EMC risk assessment applies to the engineering site; it shall assess the EMC risks facing the complicated application environment, installation conditions and inter-system on the site. 6 Risk Criteria EMC risk criteria are criteria for assessing the importance of the risk. Therefore, the The method for EMC risk analysis may be qualitative, semi-quantitative, quantitative or a combination of the above. The level of details required for EMC risk analysis depends on the specific application, reliable data available, and needs of the manufacturer/user. Qualitative risk analysis may determine the risk consequences, likelihood and risk levels by degree of importance; such as “high”, “medium”, “low” or “Level-I”, “Level-II”, “Level-III” for the degree of importance. Semi-quantitative method may use the digital quantity to measure the consequences of the electromagnetic risk and the possibility of occurrence, and use the formula to combine the two to determine the risk level. Quantitative analysis may estimate the specific values of the electromagnetic risk consequences and the possibility of occurrence, and convert them into the corresponding risk level values. 7.4.2 Risk level and classification of EMC assessment elements EMC risk level is the result of risk analysis. It may be classified according to the degree of influence of individual elements. It may also be classified according to the qualitative, semi-quantitative and quantitative analysis methods. It may be divided into “Level-I”, “Level-II”, “Level-III” according to the qualitative analysis method. The divided levels shall be typical, with no overlapping parts between the levels. The divided levels are as follows: a) Level-I: When the requirements of risk assessment elements are not met under certain conditions, it shall definitely lead to failure (if the test fails); b) Level-II: When the requirements of the risk assessment elements are not met, there shall be other clear remedies to avoid failure; c) Level-III: When the requirements are not met, it does not necessarily lead to test failure. Some specific risk elements obtained in the EMC risk analysis may not exist in the assessment object. These risk elements may be divided into the following two types according to their impacts on the consequences: a) Type-a: If there is no relevant information (required) about the risk elements in the product, then the risk level of such risk elements is considered to be highest, Level-I; b) Type-b: If there is no relevant information (not required) about the risk elements in the product, then the risk level of such risk elements is considered to be lowest, Level-III. --- The obtained results shall be able to deepen the understanding of the nature of the risks and how to deal with them; --- Shall be used in a traceable, repeatable and verifiable manner. Explain the reasons for choosing a technique in terms of relevance and applicability. When using different techniques to obtain the assessment results, the used techniques and results shall be comparable. The example of risk assessment tools can refer to Appendix B. 9 Risk Assessment Report Requirements The process and results of the EMC risk assessment shall be recorded. The risk elements shall be expressed in understandable terms; meanwhile, the risk level shall also be clearly stated. The assessment results shall be recorded in a comprehensive assessment report; such assessment report shall have sufficient details to provide the correctness of the assessment. The assessment report shall contain at least the following information: --- The objectives and scope of EMC risk assessment required for equipment, system and engineering site; --- The relationship BETWEEN assessed equipment, system and engineering site AND test items; --- The used risk criteria and their rationality; --- List the brand, specification and model of product, as well as the specific product information; --- Risk assessment methods and selecting rational analysis; --- The result of risk identification; --- The results and assessment of risk analysis; --- Analysis on sensitivity and uncertainty; --- Key assumptions and other factors that need to be monitored; --- Conclusions and recommendations. be effective when required. For the level of effectiveness for the specific control measures or a set of related control measures, a qualitative statement can be made. In most cases, it is difficult to ensure a high degree of accuracy. However, stating and recording the measured level of effectiveness of risk control results are valuable; because this information helps the decision makers compare, judge and select when improving the existing control measures and implementing different risk response. A.2.3 Supervision and inspection Risk assessment process emphasizes the environmental and other factors of the equipment, system and engineering site; these factors may change over time, and may alter or invalidate the risk assessment results. These factors shall be identified and continuously supervised and inspected; so that update the information input of the new risk assessment, and conduct the dynamic assessment against the risk. Data monitored to improve the risk assessment shall be identified and collected. The effects of the risk control measures shall also be monitored and recorded; so that provide data for risk analysis. The responsibility for the establishment and inspection of evidence and documents shall be clarified. As part of the EMC risk management process, EMC risk and control shall be supervised and inspected regularly to confirm: --- Assumptions about EMC risks remain valid; --- Assumptions for which the EMC risk assessment is based on, including the internal and external environment, remain valid; --- Expected results being achieved; --- Results of EMC risk assessment are in line with practical experience; --- EMC risk response is effective. A.2.4 Communication and recording A successful EMC risk assessment relies on effective communication and negotiation with the manufacturer/user of the equipment, system and engineering site, as well as the technical capabilities of the EMC risk assessment implementer. The involvement of EMC risk assessment stakeholders in the EMC risk assessment management process helps: --- Development of communication plans; Appendix B (Informative) Example of Assessment Tools of EMC Risk Assessment B.1 Overview This Appendix gives several methods for EMC risk assessment. The selection principle of the risk assessment method shall analyze whether it is suitable for the relevant equipment, system and engineering site from the perspective of applicability; combine with EMC related experience and EMC test results for risk result to verify the correctness of the risk assessment. B.2 Risk index method B.2.1 Overview The risk index method is an effective tool for classifying the risk levels and is a semi- quantitative assessment of risk. The risk index is an estimated value derived by a sequential scale scoring method. NOTE: A variable measurement scale that has the nature of nominal data and can show the order or level of data. A suitable index model may be designed to summarize the plus, subtraction, multiplication and/or division of the scores of each EMC risk element. Once the scoring system is established, the model shall be used on the known equipment, system and engineering site; and compare with the EMC test results to confirm its effectiveness. B.2.2 Advantages and limitations The advantages of the risk index method include: --- The risk index method may provide an effective level-classification tool; --- A variety of factors affecting the level may be integrated to the analysis of the risk level. Limitations include: If the process (mode) and its output results fail to be well-confirmed, it may make the results meaningless. B.3 Risk matrix method ......
 
Source: Above contents are excerpted from the PDF -- translated/reviewed by: www.chinesestandard.net / Wayne Zheng et al.