Path: Home > GB/T > Page298 > GB/T 2423.45-2012 || Home > Standard_List > GB/T > Page298 > GB/T 2423.45-2012
GB/T 2423.45-2012 English PDF
Price & DeliveryUS$285.00 · In stock · Download in 9 secondsGB/T 2423.45-2012: Environmental testing - Part 2: Test methods - Test Z/ABDM: Climatic sequence Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedureStatus: Valid
GB/T 2423.45: Evolution and historical versions
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivery | Name of Chinese Standard | Status |
| GB/T 2423.45-2012 | English | 285 |
Add to Cart
|
0-9 seconds. Auto-delivery
|
Environmental testing - Part 2: Test methods - Test Z/ABDM: Climatic sequence
| Valid |
| GB/T 2423.45-1997 | English | 599 |
Add to Cart
|
3 days
|
Environmental testing for electric and electronic products - Part 2: Test methods - Test Z/ABDM: Climatic sequence
| Obsolete |
Excerpted PDFs (Download full copy in 9 seconds upon purchase)PDF Preview: GB/T 2423.45-2012
GB/T 2423.45-2012: Environmental testing - Part 2: Test methods - Test Z/ABDM: Climatic sequence ---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT2423.45-2012
GB
NATIONAL STANDARD OF THE
PEOPLE'S REPUBLIC OF CHINA
ICS 19.040
K 04
Replacing GB/T 2423.45-1997
Environmental testing - Part 2.Test methods - Test
Z/ABDM. Climatic sequence
(IEC 60068-2-61.1991, MOD)
Issued on: DECEMBER 31, 2012
Implemented on: JUNE 1, 2013
Issued by. General Administration of Quality Supervision, Inspection and
Quarantine of PRC;
Standardization Administration of PRC.
Table of Contents
Foreword... 3
1 Scope... 6
2 Normative references... 6
3 Definitions... 7
4 Test apparatus... 7
5 Severities... 8
6 Pre-conditioning... 8
7 Initial measurements... 8
8 Testing... 8
9 Recovery... 12
10 Final measurements... 12
11 Information to be given in the relevant specification... 12
Appendix A (informative) Guidance for specification writers... 18
Appendix B (informative) Guidance for the conduct of the test... 19
Appendix NA (Informative) Parts of GB/T 2423... 20
Foreword
This part is Part 45 of GB/T 2423.The parts of GB/T 2423 are shown in Informative
Appendix NA.
This part was drafted in accordance with the rules given in GB/T 1.1-2009.
This part replaces GB/T 2423.45-1997 Environmental testing for electric and electronic
products - Part 2.Test methods - Test Z/ABDM. Climatic sequence. Compared to GB/T
2423.45-1997, the main changes are as follows.
-- The degree of consistency differs (the 1997 version is an identical version, while
this version is a modified version);
-- The first paragraph of Chapter 1 has been edited.
-- Regarding normative references, the specific adjustments are as follows.
GB/T 4797 has replaced IEC 60721-2;
GB/T 4798 has replaced IEC 60721-3;
-- In Chapter 2, Chinese national standards that are identical to international
standards have been cited;
-- In Chapter 4, the content "When using a dedicated test chamber in which... in
the sequence are successively established" has been changed to "When using a
single test chamber in which... in the sequence are met";
-- In Chapter 5, the statement "The severity is defined by... the air pressure and the
duration of exposure, if the optional "low air pressure" step is required (Chapter
4 in IEC 68-2-3), and finally, the number of damp heat cycles according to 8.2.5
of this standard." has been changed to "The severity is defined by... the air
pressure and the duration of exposure [if the optional "low air pressure" step is
required (Chapter 4 in GB/T 2423.21-2008)], and finally, the number of damp
heat cycles according to 8.2.5 of this part";
-- The "test Aa" and "test Ba" in this part have been changed to "test Ab" and "test
Bb";
-- In Chapter 7, "be submitted to" has been changed to "carry out";
-- In 8.2.5, all "dimensional and functional inspection" has been changed to
"dimensional and functional check";
-- The content "(including 8.2.1 and 8.2.4)" has been removed from 8.3.1 and
"(including 8.2.1 and 8.2.3)" from 8.4.1;
-- In Figure 1, Figure 2, and Figure 3, "non-mandatory" has been changed to
"optional";
-- The column "IEC standards" in Figure 3 has been changed to "GB/T standards";
-- In Figure 4, "1 h 30" has been changed to "1.5 h";
-- In Appendix A.1, the statement "... at the final stage" has been changed to "...
at the end";
-- In Appendix B.3, "a dedicated test chamber" has been changed to "a single test
chamber";
-- The informative appendix "Parts of GB/T 2423" has been added (see Appendix
NA).
This part is modified in relation to IEC 60068-2-61.1991 Environmental testing - Part
2.Test methods - Test Z/ABDM. Climatic sequence by using the redrafting method.
The technical differences between this part and IEC 60068-2-61.1991, and the reasons
therefor, are as follows.
-- Regarding normative references, this part has been adjusted to reflect technical
differences in order to adapt to Chinese technical conditions. The specific
adjustments are as follows.
GB/T 2423.1-2008, which is identical to IEC 60068-2-1.2007, has replaced
IEC 60068-2-1.1990;
GB/T 2423.2-2008, which is identical to IEC 60068-2-2.2007, has replaced
IEC 60068-2-2.1974 and the first supplement IEC 60068-2-2A.1976;
GB/T 2423.4-2008, which is identical to IEC 60068-2-30.2005, has
replaced IEC 60068-2-30.1980;
GB/T 2424.2-2005, which is identical to IEC 60068-3-4.2001, has replaced
IEC 60068-2-28.1980;
GB/T 4797 has replaced IEC 60721-2;
GB/T 4798 has replaced IEC 60721-3;
Environmental testing - Part 2.Test methods - Test
Z/ABDM. Climatic sequence
1 Scope
This part of GB/T 2423 provides standard composite test methods for determining the
suitability of a specimen when subjected to environmental conditions consisting of a
sequence of temperature, humidity and, where required, low air pressure environmental
stresses.
The order of application of the stresses AND the conditions for the change from one
step to the next have been chosen to accelerate and amplify degradation mechanisms of
the same type as those observed under natural climatic conditions.
NOTE. Environmental conditions occurring in nature are classified in GB/T 4797 and GB/T 4798.
This part may be applied to other electrotechnical products when the degradation
mechanisms are the same and the specified requirements for testing can be satisfied. In
other cases, it may form a basis for the writing of a similar test.
In this test, specimens are exposed to environmental tests in a standard order and
categorized according to the basic code defined in Appendix A of GB/T 2421.1-2008
except that the third group of digits is used as an indication of the number of cycles in
Step 5 of the damp heat cyclic Test Db (see Chapter 5 in GB/T 2423.4-2008). In the
climatic categories -/-/56, 40/-/-, etc., in this part, the dashes may be replaced by any of
the standard values appropriate to the space, as in the following examples. 55/100/56,
25/085/56, 40/085/21.Where any modification is necessary, the relevant specification
shall provide the necessary information for each step in the selected method (see
Chapter 8).
This test is frequently specified to follow other tests involving mechanical stress, for
example, tests for robustness of terminations, solderability, shock and vibration, as a
means of determining whether the sealing of the specimen has been damaged.
2 Normative references
The following documents are essential for the application of this document. For any
dated reference, only the version corresponding to that date applies to this document;
for any undated reference, the latest version (including all amendments) applies to this
document.
...... Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.
Tips & Frequently Asked QuestionsQuestion 1: How long will the true-PDF of English version of GB/T 2423.45-2012 be delivered?Answer: The full copy PDF of English version of GB/T 2423.45-2012 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice. Question 2: Can I share the purchased PDF of GB/T 2423.45-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 2423.45-2012_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. www.ChineseStandard.us -- GB/T 2423.45-2012 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds. Question 5: Should I purchase the latest version GB/T 2423.45-2012?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 2423.45-2012 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
How to buy and download a true PDF of English version of GB/T 2423.45-2012?A step-by-step guide to download PDF of GB/T 2423.45-2012_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as USD, Euro, KRW, JPY, AUD, CAD, RMB, IDR, INR, THB, HKD etc.). Step 2: Search keyword "GB/T 2423.45-2012". Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart. Step 4: Select payment option (Via payment agents Stripe or PayPal). Step 5: Customize Tax Invoice -- Fill up your email etc. Step 6: Click "Checkout". Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively. Step 8: Optional -- Go to download PDF. Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice. See screenshots for above steps: Steps 1~3 | Steps 4~6 | Step 7 | Step 8 | Step 9
|