|
Std ID |
Description (Standard Title) |
|
DL/T 5202-2004
|
Technical code for designing of electric energy metering system
|
|
DL/T 5143-2002
|
Design code of water supply and drainage for substation
|
|
DL/T 5154-2002
|
Technical Regulation of design for tower and pole structures fo overhead transmission line
|
|
DL/T 5155-2002
|
Technical code for designing AC station service of 220kV~500kV substation
|
|
DL/T 5157-2002
|
Design technical code of dispatching communication exchange network of electric power system
|
|
DL/T 5168-2002
|
Code for construction quality checkout and evaluation of 110kV~500kV overhead transmission lines
|
|
DL/T 5170-2002
|
Technical code for investigation of geotechnical engineering of substation
|
|
DL/T 5130-2001
|
Technical regulation for design of steel transmission pole
|
|
DL/T 5131-2001
|
The rural electric network construct and reconstruct technical guide
|
|
DL/T 5136-2001
|
Technical code for designing of electrical secondary wiring in fossil fuel power plants and substations
|
|
DL/T 5137-2001
|
Technical code for designing electrical measuring and energy metering device
|
|
DL/T 5138-2001
|
Technical specifications for aerial photographing and surveying of overhead transmission line
|
|
DL/T 5146-2001
|
Technical code for the surveying of 35kV~220kV overhead transmission lines
|
|
DL/T 5147-2001
|
Designing technical rules for security and automaticity equipment of power system
|
|
DL/T 5122-2000
|
Technical code of exploration and surveying for 500kV overhead transmission line
|
|
DL/Z 713-2000
|
Immunity requirement for protection and control equipment in 500kV substation
|
|
DL 5106-1999
|
Operation code of cross power transmission line in installing the conductor
|
|
DL/T 5092-1999
|
Technical code for designing 110~500kV overhead transmission line
|
|
DL/T 5103-1999
|
Design code for unattended substation of 35kV~110kV
|
|
DL/T 5076-1997
|
Technical specifications for hydrological survey of 220kV overhead transmission lines
|
|
DL/T 5078-1997
|
Design code for the miniaturization rural substation
|
|
DL/T 5049-1995
|
Technical Regulation of Exploration and Surveying for Large Crossing Overhead Transmission Line
|
|
DL 5033-1994
|
Code for Design of Telecommunication Lines Against Danger Effects From Electric Power Lines
|
|
DL/T 537-1993
|
Specification of 6~35kV Cubical Substation for Order
|
|
DL 5014-1992
|
Technical regulation for designing of reactive power compensation equipment for 330~500kV substations
|
|
DL 5162-2002
|
Technical code of safety and protection facility for hydropower and water conservancy construction engineering
|
|
DL/T 5133-2001
|
Design guide of construction equipment selection for hydropower and water conservancy project
|
|
DL/T 5072-1997
|
Code for designing insulation and painting of fossil fuel power plant
|
|
DL/T 654-2022
|
Technical guidelines for the life assessment of units in fossil-fuel power plant
|
|
DL/T 606.1-1996
|
General rules of guide for energy balance of thermal power plant
|
|
DL/T 606.3-1996
|
Guide for thermal energy balance of thermal power plant
|
|
DL/T 606.4-1996
|
Guide for balance of electrical energy of thermal power plant
|
|
DL/T 606.5-1996
|
Guide for water balance of thermal power plant
|
|
DL/T 5004-2025
|
Guide for furnishing test apparatus, maintenance device and architectural area of fossil fuel power plant
|
|
DL/T 5041-2023
|
(Technical regulations for communication design in thermal power plants)
|
|
DL/T 5203-2022
|
(Technical specification for explosion-proof design of coal and pulverizing systems in thermal power plants)
|
|
DL/T 5182-2021
|
Code for design of local equipment installation, piping, cables of I&C of fossil fuel power plant
|
|
DL/T 5210.1-2021
|
Code for construction quality acceptance of electric power construct - Part 1: Civil construction engineering
|
|
DL/T 5121-2020
|
Code for design of air and flue gas ducts/raw coal and pulverized coal piping of thermal power plant
|
|
DL/T 5174-2020
|
Code for design of combined-cycle power plant
|
|
DL 5190.2-2019
|
Technical specification for thermal power erection and construction. Part 2: Boiler unit
|
|
DL 5190.3-2019
|
Technical specification for thermal power erection and construction. Part 3: Steam turbine generator unit
|
|
DL 5190.4-2019
|
Technical specification for thermal power erection and construction - Part 4: Instrumentation and control
|
|
DL 5190.5-2019
|
Technical specification for thermal power erection and construction. Part 5: Piping and system
|
|
DL 5190.6-2019
|
(Technical specification for electric power construction - Part 6: Water treatment and system (supply) hydrogen equipment and systems)
|
|
DL 5190.8-2019
|
(Technical specification for electric power construction - Part 8: Processing and preparation)
|
|
DL/T 5210.6-2019
|
Code for construction quality acceptance of electric power construct - Part 6: Commissioning
|
|
DL/T 5790-2019
|
Technical specification for flue gas purification plant in thermal power plant
|
|
DL/T 5791-2019
|
(Guidelines for thermal control commissioning of thermal power generation construction engineering units)
|
|
DL/T 5187.1-2016
|
Technical Code for Designing Coal Handling of Fossil Fuel Power Plant - Part 1: Coal Handling System
|
|
DL/T 5738-2016
|
Technical Specifications of Deformation Joint Construction in Electric Construction Engineering
|
|
DL/T 5724-2015
|
Technical Specifications for Wastewater Treating about Aggregate System of Hydropower Project
|
|
DL/T 715-2015
|
Selection guide for the metallic material of fossil power plants
|
|
DL/T 868-2014
|
Qualification standard for welding procedures
|
|
DL/T 5312-2013
|
Specification for construction quality checkout and evaluation of electric equipment installation for 1000kV substation
|
|
DL/T 5041-2012
|
Technical code for the design of fossil-fired power plant inner communication
|
|
DL/T 5187.3-2012
|
Technical code for the design of coal handling fossil-fired power plant. Part 3: Coal handling automation system
|
|
DL/T 5210.1-2012
|
Specification for construction quality acceptance and evaluation of electric power construct. Part 1: Civil construction engineering
|
|
DL/T 5004-2010
|
Guide for furnishing test apparatus, maintenance device and architectural area of fossil fuel power plant
|
|
DL/T 1083-2008
|
Specification of distributed control system for fossil fuel power plant
|
|
DL/T 5374-2008
|
Regulation for content and depth of pre-feasibility study Report of fossil fuel power plant
|
|
DL/T 5375-2008
|
Regulation for content and depth of feasibility study report of fossil fuel power plant
|
|
DL/T 5072-2007
|
Code for designing insulation and painting of fossil fuel power plant
|
|
DL/T 5095-2007
|
Technical code for designing load of main building in fossil fuel power plant
|
|
DL/T 1012-2006
|
Code for acceptance test of TSI and ETS in fossil fuel power plant
|
|
DL/T 5045-2006
|
Code for design of ash slag damming of fossil fuel power plants
|
|
DL/T 5046-2006
|
Technical code for the design of waste water treatment of fossil fuel power plants
|
|
DL/T 5074-2006
|
Technical code for investigation of geotechnical Engineering of fossil fuel power plant
|
|
DL/T 5339-2006
|
Code for hydraulic design of fossil fuel power plants
|
|
DL/T 5366-2006
|
Technical code for stress calculating of steam/water piping in fossil fuel power plant
|
|
DL/T 5203-2005
|
Technical code for explosion prevention design of coal and pulverized coal preparation system of fossil fuel power plant
|
|
DL/T 5204-2005
|
Code for oil/gas piping design of fossil fuel power plant
|
|
DL/T 5210.1-2005
|
Specification for construction quality acceptance and evaluation of electric power construct Part 1: Civil construction engineering
|
|
DL/T 5226-2005
|
Technical rule for designing network computerized monitoring and control system in fossil fuel power plant
|
|
DL/T 5227-2005
|
Technical rule of thermal power automation design for auxiliary system (shop) of fossil fuel power plant
|
|
DL/T 5044-2004
|
Technical code for designing DC system of power projects
|
|
DL/T 5182-2004
|
Technical rule for designing of local equipment installation, pipeline and cables of IC in power plant
|
|
DL/T 5187.1-2004
|
Technical coal for designing coal handling of fossil fuel power plant Part 1: Coal handling system
|
|
DL/T 5187.2-2004
|
Technical code for designing coal handling of fossil fuel power plant Part 2: Dust prevention and control
|
|
DL/T 5190.4-2004
|
The code of erection and acceptance of electric power construction Part 4: Chemistry for fossil fuel power plant
|
|
DL/T 5190.5-2004
|
The specification of erection and acceptance of electric power constrution Part5: Section of instrumentation and control
|
|
DL/T 5196-2004
|
Technical code for designing flue gas desulfurization plants of fossil fuel power plants
|
|
DL/T 5174-2003
|
Design rule for combined-cycle power plants
|
|
DL/T 5175-2003
|
Technical rule for designing thermodynamic control system of fossil fuel power plants
|
|
DL/T 5177-2003
|
Guide for design of relay protection in hydraulic power plants
|
|
DL/T 5142-2002
|
Code for designing ash handling system of power plant
|
|
DL/T 5145-2002
|
Technical code for design and calculation of pulverized coal prepapation system of fossil-fired power plant
|
|
DL/T 5153-2002
|
Technical rule for designing auxiliary power system of fossil fuel power plants
|
|
DL/T 5161.10-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 10: 35kV and under over-head power line
|
|
DL/T 5161.11-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 11: Elevator
|
|
DL/T 5161.1-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 1: General rules
|
|
DL/T 5161.12-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 12: Low-voltage apparatus
|
|
DL/T 5161.13-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 13: Power converter equipment
|
|
DL/T 5161.14-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 14: Crane
|
|
DL/T 5161.15-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 15: Electric device of explosion atmospheres
|
|
DL/T 5161.16-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 16: 1kV and under feeder cable engineering
|
|
DL/T 5161.17-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 17: Electric lighting device
|
|
DL/T 5161.2-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 2: High voltage electric power equipment
|
|
DL/T 5161.3-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation Part 3: Power transformer, Oil immersed reactor and Mutual inductor
|
|
DL/T 5161.4-2002
|
Specification for construction quality checkout and evaluation of electric equipment installation. Part 4: Bus bar installation
|