Thyristor valves of multistage controlled shunt reactors in extra high-voltage transmission systems
| Valid |
GB/T 32516-2016
|
PDF similar to GB/T 32516-2016
Basic data | Standard ID | GB/T 32516-2016 (GB/T32516-2016) | | Description (Translated English) | Thyristor valves of multistage controlled shunt reactors in extra high-voltage transmission systems | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K46 | | Classification of International Standard | 29.200 | | Word Count Estimation | 19,170 | | Date of Issue | 2016-02-24 | | Date of Implementation | 2016-09-01 | | Regulation (derived from) | National Standard Announcement No | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 32516-2016: Thyristor valves of multistage controlled shunt reactors in extra high-voltage transmission systems ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Thyristor valves of multistage controlled shunt reactors in extra high-voltage transmission systems
ICS 29.200
K46
National Standards of People's Republic of China
UHP grade controllable shunt reactor thyristor valve
Issued on. 2016-02-24
2016-09-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
CONTENTS
Preface Ⅰ ...
1 Scope 1 ...
2 Normative references 1 ...
3 Terms and definitions ...
4 system consisting of 2 ...
5 Conditions 3 ...
5.1 Environmental conditions 3 ...
5.2 4 ... electrical conditions
5.3 Installation Location conditions 4 ...
5.4 Other Conditions 4 ...
6 Technical requirements 4 ...
6.1 General requirements 4 ...
6.2 Performance requirements thyristor valve 4 ...
6.3 Reactor 5 can take ...
6.4 Overload 5 ...
7 Inspection rules 6 ...
7.1 Inspection Type 6 ...
7.2 Test item 6 ...
7.3 Test description 6 ...
8 Test 7 ...
8.1 dielectric strength test 7 ...
8.2 Test run 9 ...
9 packaging, transportation and storage 10 ...
9.1 Packaging 10 ...
9.2 Transport 10 ...
9.3 Storage 11 ...
Appendix A (informative) thyristor valve test Reference formula 12 ...
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Electrical Equipment Industrial Association.
This standard by the national power electronic systems and equipment Standardization Technical Committee (SAC/TC60) centralized.
This standard is mainly drafted by. State Grid Smart Grid Institute, Xi'an Electric Power Systems Ltd., XJ Group Corporation, Xi'an Electronic Power Research Institute, North China Electric Power University, State Grid Power Company in Gansu Province, Xi'an High Voltage Apparatus Research Institute limited liability company.
The main drafters of this standard. Yuan Hongliang, blue Yuan Liang, Zhao Gang, Liu Ning, Zhang, Wei red, Lang Ping, Yinzhong Dong, Zhi-Yong, Xiao-Hui Yang.
UHP grade controllable shunt reactor thyristor valve
1 Scope
This standard specifies the UHP grade controllable shunt reactor thyristor valve main technical requirements, inspection rules, test, packaging, transportation and storage.
This standard applies to 500kV, hierarchical 750kV voltage power transmission systems using controllable shunt reactor thyristor valve, hierarchical other voltage power transmission systems using controllable shunt reactors thyristor valve (hereinafter referred to as the thyristor valve) may refer to .
2 Normative references
The following documents for the application of this document is essential. For cited documents with dates, only the dated edition applies to this document. For undated references, the latest edition (including any amendments) applies to this document.
GB 311.1 insulation coordination - Part 1. Definitions, principles and rules
GB/T 311.2 Insulation coordination - Part 2. Guide to the use
GB 4798.2 electric and electronic product application of environmental conditions - Part 2. Transport
GB/T 7354 partial discharge measurement
GB/T 13384 mechanical and electrical products packaging General technical conditions
GB/T 13498-2007 HVDC term
GB/T 14598.9-2010 measuring relays and protection equipment - Part 22-3. Electrical disturbance tests - Radiated electromagnetic field immunity GB/T 14598.10-2012 measure 22-4 Part relays and protection equipment. Electrical disturbance tests - Electrical fast transient/burst immunity test
GB/T 14598.13-2008 Electrical relays - Part 22-1. Electrical disturbance tests measure 1MHz burst immunity tests for measuring relays and protection equipment
GB/T 20990.1 HVDC thyristor valve - Part 1. Electrical testing
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
thyristor level
Part of the thyristor valve, mainly by a pair of anti-parallel thyristors, which also includes an auxiliary thyristor circuit (trigger, protection, equalizing, damping circuit, etc.).
NOTE. rewrite GB/T 13498-2007, definitions 6.9.
|