HOME   Cart(3)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GB 12434-2008 English PDF

US$169.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB 12434-2008: Regulations of dust control for refractory enterprises
Status: Valid

GB 12434: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB 12434-2008English169 Add to Cart 3 days [Need to translate] Regulations of dust control for refractory enterprises Valid GB 12434-2008
GB 12434-1990English239 Add to Cart 2 days [Need to translate] Regulations of dust control for refractory enterprises Obsolete GB 12434-1990

PDF similar to GB 12434-2008


Standard similar to GB 12434-2008

GB/T 25915.14   GB/T 25915.2   GB/T 25915.1   GB/T 33555   GB/T 36066   GB/T 44008   

Basic data

Standard ID GB 12434-2008 (GB12434-2008)
Description (Translated English) Regulations of dust control for refractory enterprises
Sector / Industry National Standard
Classification of Chinese Standard C70
Classification of International Standard 13.100��
Word Count Estimation 7,744
Date of Issue 2008-12-23
Date of Implementation 2009-12-01
Older Standard (superseded by this standard) GB 12434-1990
Regulation (derived from) Announcement of Newly Approved National Standards No. 21 of 2008 (No. 134 overall)
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This Chinese standard specifies the refractory enterprises the basic requirements for protection against dust and integrated dust control measures. This standard applies to the design and management of refractory enterprises dust.

GB 12434-2008: Regulations of dust control for refractory enterprises

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Regulations of dust control for refractory enterprises ICS 13.100 C70 National Standards of People's Republic of China Replacing GB 12434-1990 Regulations of dust refractory enterprises Posted 2008-12-23 2009-12-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Foreword

This standard 4.4,4.5,4.6,5.2,5.10,6.1.3,6.1.4,6.3.2,6.3.7,6.6. 4,7.1.3,7.1.4,7.1.6 are recommended The rest is mandatory. This standard replaces GB 12434-1990 "Regulations of dust refractory enterprises." This standard compared with GB 12434-1990, made the following major changes. --- Added "Terms and Definitions" chapter; --- The comprehensive technical measures are divided into. "plant construction", "production technology and equipment", "major step in the dust," "dust removal system design Gauge and Maintenance "chapters be discussed; --- Part of the mandatory provisions recommended adjustment provisions; This standard was proposed by the State Administration of Work Safety. This standard produced by the National Technical Committee of Standardization Technical Committee of dust and poison safety. This standard is drafted by. China Steel Group, Wuhan Research Institute of safety and environmental protection. Participated in the drafting of this standard. ACRE Coking & Refractory Engineering Technology Co., Ltd., Sinosteel Luoyang Institute of Refractories Research, Sinosteel Refractory Material Co., Ltd. The main drafters of this standard. Li Xiaofei, high Shihlin, Zhao Dan force, Di Guohua, Wang Rui, Shen-considered, Hudong Tao, long known Hong, Wang Man, Chen Qiang. This standard was first published in 1990 and 2008, the first revision. Regulations of dust refractory enterprises

1 Scope

This standard specifies the basic requirements related to dust and refractory enterprises comprehensive dust control measures. This standard applies to the design and management of dust and refractory enterprises.

2 Terms and definitions

The following terms and definitions apply to this standard. 2.1 It refers to the physical and chemical properties of metallic materials suitable for use in high temperature environments, but do not rule out some products may contain a certain amount of gold Metallic material. 2.2 So shaped refractory products produced sintering heat treatment. 2.3 In the construction of monolithic refractories or sample preparation, the use of vibration to make dense manner.

3 Basic provisions

3.1 Production process and equipment should take effective dust control measures. Can choose wet production process, should be preferred. 3.2 Where the new construction, expansion, reconstruction and technical transformation projects, the project should dust control measures with the main project designed, constructed and put into operation use. 3.3 Maintenance of the dust-proof equipment, maintenance should be included in the production and operation plans; dust removal system failure stop, should also stop production equipment car. Production equipment overhaul, maintenance dustproof device should at the same time and put into use. 3.4 dedusting facility, does not allow any removal or other purposes. 3.5 should configure the dust removal system according to the production process, in order to capture dust. 3.6 dust pass rate, dust removal equipment in good condition and operation rate, should be included in the assessment of economic and technical indicators of the enterprise.

4 plant construction

4.1 Installation precipitator floor height, it should ensure that there is an upper filter maintenance operations space. 4.2 around the inside walls and ground plant buildings should be smooth. When the plant should water washing facilities (production Yasumizu variety of cases outer). 4.3 devices, interlayer floor and walls holes on the chute, through the pipeline, and should try to open small holes in the floor to be provided with four weeks of high 50mm Waterproof boss. 4.4 raw material crushing, grinding operations, and forming operations should be separated to prevent cross-contamination of dust. 4.5 molding, drying, firing and oil operations, such as the top of the plant, should be established shelter skylight. 4.6 Library materials should form a closed structure.

5 Production Technology and Equipment

5.1 should be mechanized, tightly closed, continuous production process, minimizing material transit links, reduce material gap, shorten material handling distance. 5.2 of the same nature of the production process equipment, should be centralized arrangement, and to meet the vertical or horizontal lines operating requirements. 5.3 arranged production equipment, should provide the necessary conditions for the rational arrangement of dust removal system, and allow enough space for the maintenance of dust removal equipment. 5.4 production equipment with matching dust removal equipment, electrical interlocking should delay opening stop device. 5.5 belt conveyor shall be provided sweeper. 5.6 firing process should be used in the tunnel kiln, shuttle kiln, down draft kiln is generally no longer used. 5.7 semi-finished drying should be suitable for the production of clean dry kiln, such as a tunnel kiln drying, chamber drying kiln. 5.8 Oil bitumen products operations, should be vacuum sealed immersion process, and should be equipped with ventilation purification facilities. 5.9 Oil asphalt surface treatment products should be used in mechanization and automation of the production process, and should be equipped with ventilation purification facilities. 5.10 grinding and cutting machining firebrick, we should adopt a wet process and effective dust removal measures. Dust 6 primary steps 6.1 Library materials and crushing section 6.1.1 Library materials should ensure the normal flow of material to prevent the collapse of the material and dust to escape. Raw material storage 6.1.2 closed structure, its bridge grab crane cab, install safety regulation and purification devices. 6.1.3 Non-freezing season, the desirability of non-hydraulic stockpile raw materials within the library spray water spray. 6.1.4 grab by the trough should be established exposure suction hood. Each tank should be established independent removal system. 6.1.5 jaw crusher inlet and outlet opening should be located closed hood and ventilation and dust removal, spray watering facilities provided when necessary (when production of varieties Yasumizu exception). 6.2 pulverized and mixed section 6.2.1 Production system should be set up crushing operations dedusting system. 6.2.2 various dust production equipment should be tightly closed from the process. Undersize conveyor belt conveyor powder, should be fully enclosed. 6.2.3 crushed section of high-rise buildings, dust removal equipment should be arranged at the top, and to recover the dust directly back to the corresponding production systems Powder to the finished product tank. 6.2.4 In order to facilitate the mixing section of filter material back, dust removal equipment should be arranged in the top section of the ground. 6.2.5 Cage crusher discharge port when connected conveyor belt, which suction hood should be located in the lower part of the mill by a tank; when the spout chute then lift When the helicopter or screw conveyor and chute and closed more rigorous body can only screw conveyor or on a hoist body suction. 6.2.6 surrounding the discharge ball mill hood should be located in the mill housing, feed chute when the gap is greater than 2m, the inlet should Let me expand. 6.2.7 cone, hammer, roll crusher and counterattack, etc., shall take measures confined dust. 6.2.8 tube mill inlet and outlet opening should be sealed dust. 6.2.9 bucket hoist hood, when the conveying hot material should be disposed in the upper hoist; machine tape feed, the tape machine and the head On the hoist housing should be located suction hood. 6.2.10 Belt should be closed as a whole; or locally confined at feed point, unloading point by the middle closed with a lift guide Airtight cover or fixed cover. 6.2.11 reversible mobile belt conveyor sealed housing can be closed or full form. Cover type hood should be located at the feed point About two inlet location on; all sealed reversible belt conveyor can be provided a plurality of suction points. 6.2.12 Conveyor Stacker width shall formula (1). Chou ≤ (0.9B-0.05) (1) Where. Chou --- stacker width in meters (m); B --- tape width in meters (m). 6.2.13 shaker, rotating screen and a fixed ramp sieve, recess should cover the whole hood closed or partially closed hood and ventilation and dust. 6.2.14 weigh batching tank cars and hopper by the feeding of the fan-shaped valve closed, ventilation and dust removal facilities should be located. 6.2.15 storage tank should be based on the composition of the feed chute and manner, effectively sealed dust. Wind chute should pulse bag Dust collector exhaust gas purification. Trough groove wall openings shall be not less than two. Opening bottom of the hole should set aside a certain slope to prevent fouling. 6.2.16 powder bagging or bagging scales should be used packaging machines bagging, and effectively sealed dust. 6.2.17 all feeding equipment shall be sealed dust. 6.2.18 wet rolling machine and single, biaxial mixers and other mixing equipment, measures should be taken to a closed dust. 6.2.19 Mobile unloading trucks closed, may be slit-shaped trough stoma closed, fixed partial discharge chute mouth closed or trough large bulk density Closed form. 6.3 molding station Section 6.3.1 molding plant, carried out with a power spray unit dust (production Yasumizu variety of exceptions). 6.3.2 friction press, should be adopted at the next unilateral or bilateral suction suction suction hood. 6.3.3 PRESS feed trough should be used annular suction hood. 6.3.4 scales closed, should be used to cover the suction side. 6.3.5 brick gauging station should be located suction hood. 6.3.6 top disc screen should be set off activity sealed cover; screen under the hopper, discharge drain mouth, should set a fixed enclosure. The lower part of enclosure should Let the dust cover curtain. 6.3.7 remove brick dust surface, blow should be taken with a sealed cover, dust absorbing measures. 6.3.8 brick waste, waste should be placed in special waste bins, and should be promptly treated. 6.4 drying and calcining station 6.4.1 drying, baking section, there should be a natural ventilation. Operating area and installed two sets of brick tunnel kiln firing paragraph 6.4.2 of between unloading workplace brick station, shall be fitted with spray fan. 6.4.3 upper space within the plant and kiln car repair place, the electric spray unit should be located. Section 6.5 lime 6.5.1 Natural ventilation plant shall be provided with a hood. 6.5.2 scales iron mill processing, dust removal system should be set up. 6.6 Shaft Kiln Section 6.6.1 fabric layer operating area, spray fan should be located. 6.6.2 shaft kiln, when there is room cover and walls should be provided with natural ventilation hood. 6.6.3 pit material by bucket elevator shall be provided cover; rack four weeks should be set up closed hoarding and hoarding by both sides and the top of the upper portion of the suction trough located Wind shield. 6.6.4 Ore quantitative scale, should be closed dust. 6.6.5 Shaft Kiln spout and slat conveyors that feed points should be located dust removal system. When several vertical kiln share a slat conveyors, it should be in every The feed point by a conveyor, each with a suction point. Kiln Section 6.7 6.7.1 kiln operating area, spray fan should be located. 6.7.2 cooling equipment and the discharge port plate conveyor (or a tape machine) by feeding points should be located dust removal system.

7 dust removal system design and maintenance

7.1 Dust System Design 7.1.1 Design of dust removal system, dust production should meet the required point dedusting air volume and velocity requirements. 7.1.2 of the same production process, while producing work of dust spots can be combined into a dust removal system. 7.1.3 simultaneously, the different types of dust dust production points, such as allowing dust when mixed recycling, should be combined into a dust removal system. 7.1.4 different humidity, temperature, dust-containing gas, if the pipeline could cause condensation, not mixed together as a dust removal system. 7.1.5 When the dust level laying pipes, measures should be taken to prevent the deposition of dust in the pipe.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB 12434-2008_English be delivered?

Answer: Upon your order, we will start to translate GB 12434-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB 12434-2008_English with my colleagues?

Answer: Yes. The purchased PDF of GB 12434-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB 12434-2008?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB 12434-2008 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.