| US$1619.00 ยท In stockDelivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email.
 NB/T 10390-2020: (Design specification for sand basin of hydropower project)
 Status: Valid
 
	
		
			| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |  
			| NB/T 10390-2020 | English | 1619 | Add to Cart | 9 days [Need to translate] | (Design specification for sand basin of hydropower project) | Valid | NB/T 10390-2020 |  
	 
       PDF similar to NB/T 10390-2020 
 Basic data             | Standard ID | NB/T 10390-2020 (NB/T10390-2020) |           | Description (Translated English) | (Design specification for sand basin of hydropower project) |           | Sector / Industry | Energy Industry Standard (Recommended) |           | Classification of Chinese Standard | P59 |           | Classification of International Standard | 27.140 |           | Word Count Estimation | 80,847 |           | Date of Issue | 2020-10-23 |           | Date of Implementation | 2021-02-01 |           | Older Standard (superseded by this standard) | DL/T 5107-1999 |           | Regulation (derived from) | National Energy Administration Announcement No. 5 [2020] |           | Issuing agency(ies) | National Energy Administration | NB/T 10390-2020: (Design specification for sand basin of hydropower project)---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.Code for Design of Desilting Basin for Hydropower Projects
Energy Industry Standards of the People's Republic of China
Replace DL/T 5107-1999
Design specification for sedimentation basin of hydropower project
2020-10-23 released
2021-02-01 implementation
 ForewordAccording to the "Notice of the National Energy Administration on Issuing the.2015 Energy Sector Standard System (Revision) Plan" (National Energy Administration
Neng Technology [2015] No. 283) requirements, the specification preparation team has conducted extensive investigations and studies, earnestly summarized practical experience, and participated in the
Examine relevant domestic advanced standards, and revise this specification based on extensive solicitation of opinions.
The main technical content of this specification is. the setting conditions and design standards of the sedimentation basin, the selection of the sedimentation basin type, and the sedimentation basin.
Layout, hydraulic design and main size calculation, structure design, operation design, sediment observation design.
The main technical content of this specification revision is.
- Increased the calculation requirements for the design of the sand basin structure.
- Modified the scope of application of the specification. Changed from level 3 and above in large and medium-sized hydropower and water conservancy projects to hydropower
Sand basin in the project.
- Modified the standard for setting the sand basin.
- Deleted the water conservancy sedimentation basin setting standards.
This specification is managed by the National Energy Administration, proposed by the General Institute of Hydropower and Water Conservancy Planning and Design, and is responsible for daily management.
The Hydropower Survey and Design Standardization Technical Committee of the Energy Industry is responsible for the interpretation of specific technical content. If intentionally during execution
See or suggest, please send to the General Institute of Hydropower and Water Conservancy Planning and Design (Address. No. 2, Kangbei Xiaojie, Liupu, Xicheng District, Beijing, post
Edit. 100120).
Editor-in-chief of this code. China Power Construction Group Chengdu Survey and Design Research Institute Co., Ltd.
The main drafters of this specification. Zhu Wanqiang, Huang Yankun, Hao Yuanlin, Jiang Dequan, He Xianpei, and Liu Ding
Tian Xun Lu Jinbo Lu Peican Yuan Liyi Chen Qiang Ju Lin
Main reviewers of this specification. Dang Lin Cai Fang Guangda Zhang Hongwu Liu Xingnian Li Guobin Long Qihuang
Cao Yubo Wang Yiguan Li Hai Hu Wangxing Jiang Hongjun Wu Caiping
Yang Jinying Zhao Yi Liu Rongli Li ShishengTable of contents1 General...1
2 Terminology...2
3 Setting conditions and design standards of sand basin...4
3.1 Basic information...4
3.2 Determination of the amount of sand entering the pool and the gradation of sediment...4
3.3 Setting conditions of the sedimentation basin and sedimentation standards...5
4 Selection of Sand Basin Type...7
5 Arrangement of Sand Basin...10
5.1 General regulations...10
5.2 Regularly flushing the sand settling tank...10
5.3 Continuous flushing sand settling tank...11
5.4 Canal Sand Basin...11
6 Hydraulic design and calculation of main dimensions...13
6.1 General regulations...13
6.2 Diversion channel and upstream connecting section...13
6.3 Working section...13
6.4 Downstream connecting section and water conveyance...16
6.5 Hydraulic calculation of sand basin and desilting channel...16
7 Structural Design...17
7.1 General provisions...17
7.2 Structural calculation...17
8 Operational design...19
9 Sediment Observation Design...20
Appendix A Calculation of Sediment Settlement...21
Appendix B Calculation of Suspended Load Sediment Settlement...27
Appendix C Hydraulic calculation of sediment discharge in the sedimentation basin...29
Appendix D Flushing Calculation of Sand Settlement...32
Explanation of terms used in this specification...36
List of Reference Standards...37
Attachment. Article description...381 General1.0.1 In order to standardize the design of sedimentation basins in water diversion structures of hydropower projects, this code is formulated.
1.0.2 This code is applicable to the design of the sedimentation basin for the treatment of suspended sediment in hydropower projects.
1.0.3 The design of the sand basin for hydropower projects shall not only conform to this code, but also conform to the current relevant national standards.2 term2.0.1 Desilting basin
It is used to settle suspended sediment with particles larger than the designed sedimentation diameter in the sand-carrying water flow, and to reduce the sediment content in the water flow.
Building.
2.0.2 Periodic flushing desilting basin
After the sedimentation basin has accumulated to a certain degree, the sand sluice is opened for flushing, and the sedimentation basin is operated alternately for sedimentation and washing.
2.0.3 continuous flushing desilting basin
While continuously supplying water, the sediment will be continuously washed and discharged into the sedimentation basin of the downstream river.
2.0.4 Desilting channel
Natural depressions are used to form a long-length wide and shallow soil canal sedimentation basin.
2.0.5 working section
The main section of the sedimentation basin used for sedimentation.
2.0.6 working length
The length of the working section used to deposit sediment in the sedimentation basin.
2.0.7 working width
The width of the working section used to deposit sediment in the sedimentation basin.
2.0.8 working depth
The water depth between the normal water level of the sedimentation basin and the designed sedimentation elevation.
2.0.9 working flow
The flow rate is the reference flow rate for the sedimentation basin of a hydropower station with regular flushing, and the flow rate is the reference flow rate for the sedimentation basin with sand discharge holes
The sum of the sand discharge flow from the bottom hole at the end of the pool; reference to the continuous flushing sedimentation basin...
 
 Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of NB/T 10390-2020_English be delivered?Answer: Upon your order, we will start to translate NB/T 10390-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of NB/T 10390-2020_English with my colleagues?Answer: Yes. The purchased PDF of NB/T 10390-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries Question 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected] . In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.    |