HOME
Cart(0)
Quotation
About-Us
Policy
PDFs
Standard-List
www.ChineseStandard.net
Database: 189759 (26 Oct 2025)
JTGB06-2007 English PDF
Standard ID
Contents [version]
USD
STEP2
[PDF] delivered in
Standard Title (Description)
Status
PDF
JTG B06-2007
English
RFQ
ASK
13 days [Need to translate]
Highway engineering infrastructure project budget budgeting
Obsolete
JTG B06-2007
PDF similar to JTGB06-2007
Standard similar to JTGB06-2007
JTG B01
CJJ/T 135
CFDA 123
JTG G10
JTG B05
Basic data
Standard ID
JTG B06-2007 (JTGB06-2007)
Description (Translated English)
Highway engineering infrastructure project budget budgeting
Sector / Industry
Highway & Transportation Industry Standard
Classification of Chinese Standard
P66
Classification of International Standard
93.080.01
Word Count Estimation
89,856
Date of Issue
2007-10-19
Date of Implementation
2008-01-01
Regulation (derived from)
?Ministry of Transport Announcement 2011 No.83
Issuing agency(ies)
Ministry of Transport
Summary
This standard applies to new construction and renovation of infrastructure projects in highway engineering estimates, budgeting and management. Rural roads can refer to these Measures, the specific calculation method and billing standards by the provinces, autonomous regions and municipalities directly under the transportation department to develop. Budget or the revised estimate is preliminary design documents or technical design documents important part. Budget should be controlled in the approved construction project feasibility study report investment estimate is allowed to float amplitude range. Budget after approval is the basic construction project investment ceiling construction project investment plan is prepared to identify and control the construction project investment basis, is to control the construction design and construction drawing budget is based, is a measure of design options and choose the most economic rationality Good design is based, is assessing the effects of the construction project investment basis. Design units should be different design stages of preparation of budget estimates and revised estimates. Preparation of budget estimates or the revised estimate should be fully informed of the location of construction conditions, to master the basic data, the correct reference to the provisions of the quota, the standard fee, wages and materials, equipment prices price, according to provisions of this approach for the preparation, so that budget can be a complete accurately reflect the design content.
Refund Policy
Privacy Policy
Terms of Service
Shipping Policy
Contact Information