HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (26 Oct 2025)

JTGB06-2007 English PDF

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
JTG B06-2007EnglishRFQ ASK 13 days [Need to translate] Highway engineering infrastructure project budget budgeting Obsolete JTG B06-2007

PDF similar to JTGB06-2007


Standard similar to JTGB06-2007

JTG B01   CJJ/T 135   CFDA 123   JTG G10   JTG B05   

Basic data

Standard ID JTG B06-2007 (JTGB06-2007)
Description (Translated English) Highway engineering infrastructure project budget budgeting
Sector / Industry Highway & Transportation Industry Standard
Classification of Chinese Standard P66
Classification of International Standard 93.080.01
Word Count Estimation 89,856
Date of Issue 2007-10-19
Date of Implementation 2008-01-01
Regulation (derived from) ?Ministry of Transport Announcement 2011 No.83
Issuing agency(ies) Ministry of Transport
Summary This standard applies to new construction and renovation of infrastructure projects in highway engineering estimates, budgeting and management. Rural roads can refer to these Measures, the specific calculation method and billing standards by the provinces, autonomous regions and municipalities directly under the transportation department to develop. Budget or the revised estimate is preliminary design documents or technical design documents important part. Budget should be controlled in the approved construction project feasibility study report investment estimate is allowed to float amplitude range. Budget after approval is the basic construction project investment ceiling construction project investment plan is prepared to identify and control the construction project investment basis, is to control the construction design and construction drawing budget is based, is a measure of design options and choose the most economic rationality Good design is based, is assessing the effects of the construction project investment basis. Design units should be different design stages of preparation of budget estimates and revised estimates. Preparation of budget estimates or the revised estimate should be fully informed of the location of construction conditions, to master the basic data, the correct reference to the provisions of the quota, the standard fee, wages and materials, equipment prices price, according to provisions of this approach for the preparation, so that budget can be a complete accurately reflect the design content.


Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information