CJJT135-2009: [2023 Edition] Technical specification for pervious cement concrete pavement
Delivery: 9 seconds. True-PDF full-copy in English & invoice will be downloaded + auto-delivered via email. See step-by-step procedure
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] deliveryName of Chinese StandardStatus
CJJ/T 135-2009English610 Add to Cart 0-9 seconds. Auto-delivery [2023 Edition] Technical specification for pervious cement concrete pavement Valid

Excerpted PDFs (Download full copy in 9 seconds upon purchase)

PDF Preview: CJJT135-2009
      

Similar standards

CFDA 123   CJJ/T 135   JTG E60   CJJ/T 273   

CJJ/T 135-2009: [2023 Edition] Technical specification for pervious cement concrete pavement

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/CJJT135-2009
UDC CJJ INDUSTRY STANDARD OF THE PEOPLE��S REPUBLIC OF CHINA Record number J965-2009 Technical specification for pervious cement concrete pavement [2023 Edition] Issued on. NOVEMBER 16, 2009 Implemented on. JULY 01, 2010 Issued by. Ministry of Housing and Urban-Rural Development of the People��s Republic of China. INDUSTRY STANDARD OF THE PEOPLE��S REPUBLIC OF CHINA Technical specification for pervious cement concrete pavement Approved by. Ministry of Housing and Urban-Rural Development of the People��s Republic of China Implemented from. July 1, 2010 China Architecture & Building Press 2009 Beijing Ministry of Housing and Urban-Rural Development of the People��s Republic of China

Table of Contents

1 General provisions... 6 2 Terms and symbols... 7 3 Materials... 9 4 Structural combination and tectonic... 14 5 Construction... 18 6 Acceptance... 23 7 Maintenance... 28 Appendix A Test method of permeability coefficient... 29 Explanation of wording in this Specification... 32 Normative standards... 33 Appendix A Test method of permeability coefficient... 52 Appendix B Test method for continuous void... 53 Normative standards... 55 Technical specification for pervious cement concrete pavement

1 General provisions

1.0.1 This Specification is formulated in order to enhance the quality of pervious cement concrete pavement projects and make them technologically advanced, economical, reasonable, convenient and applicable. 1.0.2 This Specification applies to the design, construction, acceptance and maintenance of pervious cement concrete pavements such as newly built urban light load roads, light load roads in gardens, squares and parking lots. This Specification does not apply to pavements in severe cold areas, collapsible loess areas, saline soil areas, and expansive soil areas. 1.0.3 The structural form of pervious cement concrete pavement shall take into account geological conditions, load levels, landscape requirements, environmental conditions, construction conditions and other factors. 1.0.4 This Specification specifies the basic technical requirements for the design, construction, acceptance and maintenance of pervious cement concrete pavement. Where this Specification conflicts with the provisions of national laws and administrative regulations, the provisions of national laws and administrative regulations shall prevail. 1.0.5 The design, construction, acceptance and maintenance of pervious cement concrete pavement shall not only comply with the provisions of this Specification, but also comply with the provisions of the relevant current national standards.

2 Terms and symbols

2.1 Terms 2.1.1 Pervious cement concrete Concrete, with a continuous void structure, which is formed by mixing coarse aggregate and cement-based binder. 2.1.2 Continuous void The percentage of the volume of continuous void existing inside pervious cement concrete to the volume of pervious cement concrete. 2.1.3 Water-washing pervious cement concrete Pervious cement concrete whose coarse aggregate on the surface is exposed after the cement-based binder wrapped on the surface of the coarse aggregate is water-washed before final setting. 2.1.7 Total pervious structure Road structure system where road surface water can directly penetrate into the subgrade soil through the surface and base of the road. 2.1.8 Semi-pervious structure Road structure system where road surface water can only penetrate into the surface and not into the subgrade soil. 2.2 Symbols h1 �C pervious cement concrete pavement surface thickness; h2 �C pervious cement concrete pavement base thickness; Ma �C amount of admixture per cubic meter of pervious cement concrete; RW/C �C water-binder ratio;

3 Materials

3.1 Raw materials 3.1.1 The cement shall be Portland cement with a strength grade of not less than 42.5 or ordinary Portland cement, whose quality shall meet the requirements of the current national standard Common Portland cement, GB 175.Cement of different grades, brands, varieties, and production dates must not be mixed during storage and usage. 3.1.2 Admixtures shall comply with the current national standard Concrete admixtures, GB 8076. 3.1.3 Reinforcer used in pervious cement concrete can be divided into organic materials and inorganic materials. The material technical indicators shall comply with the provisions of Table 3.1.3. 3.1.4 The aggregate used in pervious cement concrete must be hard, durable, clean and dense crushed stone whose performance indicators shall comply with the secondary requirements in the current national standard Pebble and crushed stone for construction, GB/T 14685, and shall comply with the provisions of Table 3.1.4. 3.1.5 The water used for mixing pervious cement concrete shall comply with the current industry standard Standard of water for concrete, JGJ 63. 3.1.6 The requirements for base materials shall comply with relevant specifications. 3.2 Pervious cement concrete

4 Structural combination and tectonic

4.1 Structural combination design 4.1.1 The service life of pervious cement concrete pavement structure shall be consistent with the effective service life of water permeability. 4.1.2 The subgrade shall be stable, homogeneous, and shall provide uniform support for the pavement structure. 4.1.3 The base shall have sufficient strength and stiffness. 4.2 Surface design 4.2.1 When the sidewalk design adopts a total pervious structure, its pervious cement concrete surface strength level shall not be less than C20, and its thickness (h1) should not be less than 80 mm. For other pavements, when using the total pervious structure, its pervious cement concrete surface strength level shall not be less than C30, and its thickness (h1) should not be less than 180 mm; when using the semi-pervious structure, its pervious cement concrete surface strength level shall not be less than C30, and its thickness (h1) should not be less than 180 mm. 4.2.2 The structure design of the pervious cement concrete pavement is divided into monochrome layer or two-color combination layer. When the two-color combination layer is adopted, the thickness of the surface layer shall not be less than 30 mm. 4.3 Drainage system design 4.3.1 The drainage design of pervious cement concrete pavement should comply with the relevant provisions of the current industry standard Code for design of urban road engineering, CJJ 37. 4.3.2 When designing the total pervious structure, drainage under the pavement shall be considered. The drainage under the pavement can be set with drainage blind ditch which shall be connected to the municipal drainage system during the road design. The combination of the gutter inlet with the base and the surface shall be designed into the pervious form to facilitate the gathering of excess water from the base to the gutter inlet. Impervious geotextile with a width of not less than 1 m shall be set on the subgrade surface around the gutter inlet (Figure 4.3.2). 4.3.3 When designing the drainage system, municipal drainage ditches or gutter inlets can be used. The pervious cement concrete can be directly laid to the municipal drainage ditches or gutter inlets. Squares of large area should be set with drainage blind ditches (Figure 4.3.3).

5 Construction

5.1 General requirements 5.1.1 Before construction, the construction site shall be inspected, the location and elevation of underground hidden facilities shall be reviewed, the construction plan shall be determined based on the design documents and construction conditions, and the construction organization design shall be prepared. 5.1.2 Before construction, water and electricity supply, traffic roads, mixing and stacking sites, work sheds and warehouses, fire protection and other facilities shall be solved. The construction site shall be equipped with a rainproof and moisture-proof material storage area. Materials shall be stacked according to markings and must not be thrown randomly during loading, unloading and transportation. 5.2 Mixing and transport 5.2.1 Pervious cement concrete should be mixed with a mandatory mixer. The capacity of the mixer shall be selected based on parameters such as engineering quantity, construction progress, construction sequence, and transportation means. The transportation time of fresh concrete from the machine to the working surface should not exceed 30 minutes. 5.3 Pervious cement concrete pavement paving 5.3.1 The construction of ordinary pervious cement concrete pavement shall comply with the following requirements. 5.4 Joint construction 5.4.1 The cutting depth of pavement contraction joints should be (1/2~1/3) h1; the pavement expansion joints shall be the same as the thickness of the pavement. Construction joints can replace expansion joints during construction. 5.4.2 Contraction joints and expansion joints during construction shall be embedded with elastic joint materials. 5.5 Curing 5.5.1 After the construction of pervious cement concrete pavement is completed, methods such as covering it with plastic film should be adopted for curing. The curing time shall be determined based on the strength growth of pervious cement concrete, and the curing time should not be less than 14 days. 5.5.2 During the curing period, the pervious concrete pavement shall not be opened to traffic, and the integrity of the covering material shall be ensured. 5.6.7 The construction of pervious cement concrete pavement in summer shall comply with the following regulations. 5.6.8 When the maximum outdoor temperature reaches 32 ��C and above, construction should not be carried out.

6 Acceptance

6.1 General requirements 6.1.1 The construction quality of pervious cement concrete pavement shall be inspected and accepted according to the following requirements. 6.1.2 The following information shall be collected during construction. 6.1.3 When there is doubt or dispute about the quality of pervious cement concrete during construction, the construction unit shall organize a physical inspection under the witness of the supervision unit or construction unit. Physical inspection shall be entrusted to a testing agency with corresponding qualification levels. 6.1.4 When the construction quality of pervious cement concrete pavement does not meet the requirements, it shall be dealt with according to the following provisions. 6.1.5 Pervious cement concrete pavements that cannot meet the requirements for safe use after repair or reinforcement are strictly prohibited from acceptance. 6.2 Quality test standards Dominant items 6.2.1 The quality of raw materials shall meet the following requirements. 6.2.2 In addition to meeting the design requirements, the quality of the pervious cement concrete pavement surface layer shall also meet the following requirements. 6.2.3 The surface of the pervious cement concrete pavement shall be smooth; the edges and corners shall be neat; there shall be no falling stones. Inspection quantity. Full inspection. Inspection methods. Observation and measurement. 6.2.4 Pavement joints shall be vertical and straight, and there shall be no debris in the joints. Inspection quantity. Full inspection. Inspection method. Observation. 6.2.5 The color of colored pervious cement concrete pavement shall be uniform. Inspection quantity. Full inspection. Inspection method. Observation. 6.2.6 The surface stones of the water-washing pervious cement concrete pavement shall be evenly distributed and shall not be loose. Inspection quantity. Full inspection. Inspection method. Observation. 6.2.7 The allowable deviation of pervious cement concrete pavement surface layer shall comply with the provisions of Table 6.2.7.

7 Maintenance

7.0.1 For pervious cement concrete pavement in winter, timely snow removal and other measures shall be taken to prevent the pavement from freezing. Mechanical de-icing should not be used, and sand or ash must not be spread. 7.0.2 After the pervious cement concrete pavement is put into use, in order to ensure the performance of the pervious cement concrete, high-pressure water (5 MPa ~ 20 MPa) can be used to flush the pores to remove the blockages, or compressed air can be used to flush the pores to remove the blockages; vacuum pump can also be used to suction out debris clogging the pores. 7.0.3 When the pervious cement concrete pavement has cracks and aggregates fall off in a large area, maintenance must be carried out. During maintenance, the loose aggregates on the pavement shall be removed first, and the pavement shall be cleaned to remove dust and debris in the pores before paving with new pervious cement concrete. ......
Source: Above contents are excerpted from the full-copy PDF -- translated/reviewed by: www.ChineseStandard.net / Wayne Zheng et al.


      

Tips & Frequently Asked Questions

Question 1: How long will the true-PDF of English version of CJJT135-2009 be delivered?

Answer: The full copy PDF of English version of CJJT135-2009 can be downloaded in 9 seconds, and it will also be emailed to you in 9 seconds (double mechanisms to ensure the delivery reliably), with PDF-invoice.

Question 2: Can I share the purchased PDF of CJJT135-2009_English with my colleagues?

Answer: Yes. The purchased PDF of CJJT135-2009_English will be deemed to be sold to your employer/organization who actually paid for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. www.ChineseStandard.us -- CJJT135-2009 -- Click this link and select your country/currency to pay, the exact amount in your currency will be printed on the invoice. Full PDF will also be downloaded/emailed in 9 seconds.

How to buy and download a true PDF of English version of CJJT135-2009?

A step-by-step guide to download PDF of CJJT135-2009_EnglishStep 1: Visit website https://www.ChineseStandard.net (Pay in USD), or https://www.ChineseStandard.us (Pay in any currencies such as Euro, KRW, JPY, AUD).
Step 2: Search keyword "CJJT135-2009".
Step 3: Click "Add to Cart". If multiple PDFs are required, repeat steps 2 and 3 to add up to 12 PDFs to cart.
Step 4: Select payment option (Via payment agents Stripe or PayPal).
Step 5: Customize Tax Invoice -- Fill up your email etc.
Step 6: Click "Checkout".
Step 7: Make payment by credit card, PayPal, Google Pay etc. After the payment is completed and in 9 seconds, you will receive 2 emails attached with the purchased PDFs and PDF-invoice, respectively.
Step 8: Optional -- Go to download PDF.
Step 9: Optional -- Click Open/Download PDF to download PDFs and invoice.
See screenshots for above steps: Steps 1~3    Steps 4~6    Step 7    Step 8    Step 9