HOME   Cart(12)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GBZ30418-2013 English PDF

US$114.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ30418-2013: Luminaires -- Application of the IK code
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/Z 30418-2013English114 Add to Cart 3 days [Need to translate] Luminaires -- Application of the IK code Valid GB/Z 30418-2013

PDF similar to GBZ30418-2013


Standard similar to GBZ30418-2013

GB/T 24825   GB/T 32483.2   GB/T 37637   GB/Z 44064   GB/T 34923.1   

Basic data

Standard ID GB/Z 30418-2013 (GB/Z30418-2013)
Description (Translated English) Luminaires -- Application of the IK code
Sector / Industry National Standard
Classification of Chinese Standard K73
Classification of International Standard 29.140.40
Word Count Estimation 6,669
Quoted Standard IEC 60068-2-75; IEC 60598-1; IEC 60598-2-1; IEC 60598-2-2; IEC 60598-2-3; IEC 60598-2-4; IEC 60598-2-5; IEC 60598 - 2-6; IEC 60598-2-7; IEC 60598-2-8; IEC 60598-2-9; IEC 60598-2-10; IEC 60598-2-11; IEC 60598-2-12; IEC 60598-2 -13; IEC 60598-2-14; IEC 6059
Adopted Standard IEC/TR 62696-2011, IDT
Regulation (derived from) National Standards Bulletin 2013 No. 27
Issuing agency(ies) Ministry of Health of the People's Republic of China
Summary The IEC 62262 standard specifies the test fixture and classification. IK grading for lighting applications are considered to be performance problems, security lighting with the covering IEC 60598 safety standard provisions not directly linked.

GBZ30418-2013: Luminaires -- Application of the IK code

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Luminaires.Application of the IK code ICS 29.140.40 K73 People's Republic of China national standardization of technical guidance documents Lighting IK code applications 2013-12-31 released 2014-12-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This Guidance Document uses the translation method equivalent to IEC /T R62696.2011 "Lamp IEC /T R62696 IK Code use". Our document, which corresponds in a consistent manner to the international documents that are normative references in this Guidance Document, is as follows. --- GB 7000 (all parts) lamps [IEC 60598 (all parts)] --- GB 7000.1-2007 Lamps - Part 1. General requirements and tests (IEC 60598-1.2003, IDT) --- GB/T 2423.55-2006 Environmental testing for electric and electronic products Part 2. Test methods Test Eh. Hammer test (IEC 60068-2-75.1997, IDT) --- GB/T 20138-2006 Protection degree (IK code) of electrical equipment enclosure to external mechanical collision (IEC 62262.2002, IDT) This Guidance Document is proposed by China National Light Industry Council. The guidance of technical documents by the National Standardization Technical Committee Lighting Lighting Technical Committee (SAC/TC224/SC2) Focused. The drafting of the guidance of technical documents. National Lighting Quality Supervision and Inspection Center, the State Electric Light Source Quality Supervision and Inspection Center (Shanghai), Shanghai Times Lighting Lighting Co., Ltd. test. The drafting of the guidance of technical documents. Li Wei, Yu then Road, Chen Chao, Shi Xiaohong.

Introduction

The following IK codes for resistance to mechanical shock, given in IEC 62262, are regulated by the product standards committee. ● shell definition; ● impact test device used; ● the number of test samples; ● test sample installation conditions; ● test sample pretreatment; ● whether the test carried out under power; ● whether the movable part of the mobile test; ● the number of impact and impact location; Other aspects of luminaires that are specifically considered may also apply, for example. Acceptable/unacceptable damage after impact ● After the impact of lamps and lanterns to maintain the performance and level of work. Lighting IK code applications

1 Scope

This guidance document contains the lamp test and classification in IEC 62262. Applying IK ratings to luminaires is considered a performance issue However, it is not directly related to the safety clause in IEC 60598 that covers the safety of luminaires.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. IEC 60068-2-75 Environmental tests - Part 2-75. Tests Eh. Environmental test- Part 2-75.Tests-TestEh.Hammertests) IEC 60598 (all parts) Luminaires IEC 60598-1 lamps Part 1. General requirements and tests (Luminaires-Part 1.Generalrequirementsandand tests IEC 62262 electrical equipment shell on the external mechanical collision protection level (IK code) [Degreesofprotectionprovided byenclosuresforelectricalequipmentagainstexternalmechanicalimpacts (IKcode)]

3 test requirements

3.1 In general, the test is carried out in accordance with IEC 62262, taking into account the general test conditions specified in 4.13 of IEC 60598-1 and the following The specified IK test and lamp classification conditions. 3.2 Impact should not be applied to the opening area of less than 64cm2 lamp housing. For example, in a shading grid, no impact will be used if a single opening size is less than 64 cm2. 3.3 The test should be carried out under the complete assembly and installation of the lamp. For ceiling or wall-mounted luminaires, they should be mounted on a hardwood board. Hanging luminaires should be tested under normal use in accordance with the minimum hanging length described on the manufacturer's product manual. Luminaires mounted on poles or poles, with or without cantilever, should be mounted on rough posts on poles or poles. Ground-mounted luminaires shall be tested with a suitable rough structure to simulate the normal use of the luminaire. 3.4 In the testing process, the lamp should not be energized, lamp samples without pretreatment requirements. 3.5 The test shall be performed under a single luminaire sample unless the impact test results elsewhere in the luminaire may affect the assessment. 3 times the impact Should be considered at the point where the luminaire is the weakest. 3.6 The impact test shall be made using the impact element of the head with the radius and material specified in IEC 60068-2-75. For the rating does not exceed IK06 should use a spring hammer. For IK07 ratings and above, depending on the design and intended installation of the luminaire, a pendulum or Vertical drop hammer device. 3.7 When possible, lamp installation may affect the test results (for example, the installation of a fixed surface safety assessment), the impact test Should be expected in the lamp installation location. When the impact test is required from underneath a ceiling luminaire which is not feasible To achieve the purpose of the test, the luminaire can be rotated by 90 ° (to a wall-mounted position). 3.8 If the impact test can not be performed due to the structure of the lamp, a special lamp can be used to complete the test. In this kind of In the circumstances, the change of the luminaire should not impair its mechanical strength characteristics.

4 pass judgment

4.1 Lamp safety To maintain the requirements of 4.13 of IEC 60598-1. Moreover, the fixture on the mounting surface should be firmly fixed. Lamps

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ30418-2013_English be delivered?

Answer: Upon your order, we will start to translate GBZ30418-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ30418-2013_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ30418-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.