GB/T 45905.5-2025: Electricity spot market operation - Part 5: Calculation method of incorporating intermittent new energy into power system balance
Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 45905.5-2025 | English | 219 |
Add to Cart
|
3 days [Need to translate]
|
Electricity spot market operation - Part 5: Calculation method of incorporating intermittent new energy into power system balance
| Valid |
GB/T 45905.5-2025
|
PDF similar to GB/T 45905.5-2025
Basic data
| Standard ID | GB/T 45905.5-2025 (GB/T45905.5-2025) |
| Description (Translated English) | Electricity spot market operation - Part 5: Calculation method of incorporating intermittent new energy into power system balance |
| Sector / Industry | National Standard (Recommended) |
| Classification of Chinese Standard | F20 |
| Classification of International Standard | 29.240 |
| Word Count Estimation | 10,171 |
| Date of Issue | 2025-08-01 |
| Date of Implementation | 2026-02-01 |
| Issuing agency(ies) | State Administration for Market Regulation, Standardization Administration of China |
GB/T 45905.5-2025: Electricity spot market operation - Part 5: Calculation method of incorporating intermittent new energy into power system balance
---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT45905.5-2025
ICS 29.240
CCSF20
National Standard of the People's Republic of China
Electricity spot market operations
Part 5.Calculation method for new energy sources participating in power balance
Implementation on February 1, 2026
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General Requirements 1
5 Data Sources and Data Processing 1
6 New energy participation in medium- and long-term power balance 2
7 New energy participation in short-term power balance 3
Preface
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
This document is Part 5 of GB/T 45905 “Electricity Spot Market Operation”. GB/T 45905 has been published in the following parts.
--- Part 1.Terminology;
--- Part 2.Provincial technical support system;
--- Part 3.Inter-provincial technical support system;
--- Part 4.Load forecasting;
--- Part 5.Calculation method for new energy participation in power balance;
--- Part 6.Frequency modulation capacity management;
--- Part 7.Spare capacity management;
--- Part 8.Multi-cycle power and quantity balance calculation method;
--- Part 9.Market power monitoring and mitigation;
--- Part 10.Operational evaluation.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Technical Committee for Standardization of Power Grid Operation and Control (SAC/TC446).
This document was drafted by. State Grid Corporation of China, State Grid Corporation of China Northwest Branch, State Grid Corporation of China North China Branch,
State Grid Corporation of China Northeast Branch, State Grid Corporation of China East China Branch, State Grid Corporation of China Central China Branch, State Grid Corporation of China
Southwest Branch of the Company, State Grid Gansu Electric Power Company, State Grid Ningxia Electric Power Company, State Grid Zhejiang Electric Power Company, State Grid Liaoning Electric Power Company
Power Co., Ltd., State Grid Hebei Electric Power Co., Ltd., China Electric Power Research Institute Co., Ltd., Beijing Power Exchange Center Co., Ltd.,
State Grid Shandong Electric Power Company, Yunnan Power Grid Co., Ltd., China Southern Power Grid Co., Ltd., Inner Mongolia Electric Power (Group) Co., Ltd.
Any company.
The main drafters of this document are. Wang Chao, Sun Dayan, Zhang Zhenyu, Li Zenghui, Zhang Xiaodong, Yu Zhao, He Jingbo, Ma Ke, Yang Junfeng, Ma Xiaowei,
Ren Jing, Zhou Xin, Dong Shimeng, Wang Yanan, Guo Tao, Yao Weifeng, Wu Li, Cui Da, Zhang Zhi, Wang Yang, Zhang Shoukui, Ma Jie, Duan Naixin, Wang Zhiwei,
Zhu Minghui, Xiao Liang, Shen Shaofei, Geng Lin, Wang Guocheng, Liu Yu, Zhang Xiaotian, Hu Jiyun, Miao Yuancheng, Qin Kangping, Song Bingbing, Huang Haiyu, Xiong Wei, Chen Sheng,
Wu Yuquan, Yang Chunxiang, Lei Shen, Qi Xin, Liu Yifeng, Sun Mingyi, Wang Wei, Zhou Yongcan, Yao Haicheng, Wang Chao (from Liaoning Province), Liu Xiangyu, Zhang Jian,
Jin Yiding, Shi Min, Wang Yifeng, Zhang Bing, Zhang Jiaqi, Liu Shuangquan, Liu Xianzhuo, Guo Qi, and Li Hongbo.
introduction
In order to further implement the national decision-making arrangements for deepening power system reform and accelerating the construction of a new power system, and to support the high-quality development of the power spot market,
This series of
standard.
GB/T 45905 "Electricity Spot Market Operation" covers terminology, provincial technical support system, inter-provincial technical support system, load forecasting, new energy
Power balance calculation method for power source participation, frequency regulation capacity management, reserve capacity management, multi-cycle power balance calculation method, operation evaluation, etc.
GB/T 45905 is planned to consist of 10 parts.
--- Part 1.Terminology. The purpose is to standardize the terms and definitions related to electricity spot market operation and grid operation, to provide a standardized and high-level
Provide guidance for the effective construction and operation of electricity spot markets.
--- Part 2.Provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the provincial technical support system
requirements, data interaction, reliability assurance, security protection and other technical requirements, as a provincial technical support system design, development, construction and
Basis for operation.
--- Part 3.Inter-provincial technical support system. The purpose is to standardize the system architecture, functional requirements, performance of the inter-provincial technical support system
requirements, data interaction, reliability assurance, security protection and other technical requirements, as the provincial technical support system design, development, construction and
Basis for operation.
--- Part 4.Load Forecasting. The purpose is to specify the basic technical requirements for load forecasting in the electricity spot market, which is used to guide the
Market operators, business entities and power grid companies carry out short-term and ultra-short-term system load forecasting, bus load forecasting and
Household load forecasting.
--- Part 5.Calculation method for new energy participating in power balance. The purpose is to standardize the power spot market environment, wind power, photovoltaic power, etc.
Principles, calculation methods and basic data requirements for the participation of new energy in electricity balance at different scales.
--- Part 6.Frequency Regulation Capacity Management. The purpose is to standardize the overall requirements and calculation methods for frequency regulation capacity setting in the spot market, clarify
Determine the frequency regulation capacity evaluation and adjustment methods, improve the standardization of the frequency regulation market and the compliance operation level of the spot market, and guide provincial/regional
The power grid carries out frequency regulation capacity management.
--- Part 7.Spare capacity management. The purpose is to standardize spare capacity configuration, spare capacity mutual assistance, spare capacity recovery and other requirements.
Provide guidance to provincial/regional power grids on reserve capacity management.
--- Part 8.Multi-cycle power and quantity balance calculation method. The purpose is to specify the basic requirements for multi-cycle power and quantity balance calculation.
The requirements, data requirements, calculation methods and conclusion analysis are used to guide provincial and above power grids in dispatching production organization and spot market operation.
Carry out multi-cycle (year, month, week, day) power and electricity balance work during the process.
--- Part 9.Market power monitoring and mitigation. The purpose is to standardize the monitoring methods and mitigation of market power in provincial/regional electricity spot markets.
Mitigation measures provide guidance for market power monitoring and mitigation.
--- Part 10.Operational evaluation. The purpose is to standardize the evaluation requirements, evaluation indicators, and evaluation of provincial/regional electricity spot market operations.
The evaluation methods are used to provide guidance for the operation evaluation of the electricity spot market.
Electricity spot market operations
Part 5.Calculation method for new energy sources participating in power balance
1 Scope
This document specifies the basic data sources for wind power, photovoltaic power and other new energy sources to participate in power balance at different time scales in the electricity spot market environment.
Requirements for data sources, data processing methods and calculation methods.
This document is applicable to the calculation of reliable power generation capacity of power grids at the provincial level and above, which include wind power, photovoltaic and other new energy output into power balance,
Analysis and calculation of supply margin, determination of unit combination and verification of transaction balance, etc.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 45905.1 Electricity spot market operation Part 1.Terminology
3 Terms and Definitions
The definitions of terms in GB/T 45905.1 apply to this document.
4 General Requirements
4.1 The participation of new energy in medium- and long-term and short-term power balance should be determined based on the fluctuation characteristics of new energy power generation and the statistical laws of new energy power generation.
Determine the reliable power generation capacity of new energy as the safety boundary for new energy to participate in power balance.
4.2 If there is an effective and available forecast output of new energy, the calculation method for participating in the short-term power balance should be used; if there is no effective and available forecast output of new energy, the calculation method for participating in the short-term power balance should be used.
The output forecast should be carried out according to the calculation method for medium and long-term power balance.
4.3 Renewable energy generation is volatile, and the reliable generation capacity and actual performance of renewable energy in power balance should be quantitatively evaluated using statistical methods.
The power generation risk caused by the deviation between outputs should be characterized by confidence probability.
4.4 The participation of new energy in short-term, medium-term and long-term power balance should adopt reliable power generation capacity with a confidence probability of not less than 95%.
The power supply and demand situation, new energy consumption demand, external support capabilities, load management measures and other factors should be evaluated, as well as the important power supply period or extreme weather conditions.
In this case, the confidence probability adopted should be appropriately increased.
4.5 The participation of new energy in medium- and long-term and short-term power balance should be determined based on the statistical characteristics of wind power and photovoltaic power generation.
Reliable power generation capacity.
5 Data Sources and Data Processing
5.1 Basic data such as installed capacity, predicted output, actual output, theoretical power, and available power of renewable energy participating in power balance should adopt the new
Energy stations report data.
5.2 The actual output data of renewable energy should be selected from the data of the past three years or more.
Tips & Frequently Asked Questions:
Question 1: How long will the true-PDF of GB/T 45905.5-2025_English be delivered?
Answer: Upon your order, we will start to translate GB/T 45905.5-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.
Question 2: Can I share the purchased PDF of GB/T 45905.5-2025_English with my colleagues?
Answer: Yes. The purchased PDF of GB/T 45905.5-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.
Question 3: Does the price include tax/VAT?
Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs):
List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?
Answer: Yes. If you need your currency to be printed on the invoice, please write an email to
[email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.