US$359.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 45121-2024: Technical specifications of energy consumption measurement for flue gas CO2 capture system in thermal power plants Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 45121-2024 | English | 359 |
Add to Cart
|
4 days [Need to translate]
|
Technical specifications of energy consumption measurement for flue gas CO2 capture system in thermal power plants
| Valid |
GB/T 45121-2024
|
PDF similar to GB/T 45121-2024
Basic data Standard ID | GB/T 45121-2024 (GB/T45121-2024) | Description (Translated English) | Technical specifications of energy consumption measurement for flue gas CO2 capture system in thermal power plants | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | Z00 | Classification of International Standard | 13.020.10 | Word Count Estimation | 18,142 | Date of Issue | 2024-12-31 | Date of Implementation | 2025-07-01 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 45121-2024: Technical specifications of energy consumption measurement for flue gas CO2 capture system in thermal power plants ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 13.020.10
CCSZ00
National Standard of the People's Republic of China
Energy consumption of flue gas carbon dioxide capture system in thermal power plants
Determination technical specifications
Released on 2024-12-31
2025-07-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Technical Requirements 3
5 Verification Method 3
6 Test items and requirements 3
7 Test Methods 6
8 Calculation method 7
9 Test Report 10
Appendix A (Normative) Maximum allowable errors of commonly used measuring equipment Table 12
Reference 13
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the China Electricity Council.
This document was drafted by. China Energy Group New Energy Technology Research Institute Co., Ltd., China Guodian Power Development Co., Ltd., China Energy
Jiangsu Electric Power Co., Ltd. of China Energy Group, China National Institute of Standardization, China Agenda 21 Management Center, China National Environmental Monitoring Center, Ecological Environment
Environmental Development Center of the Ministry of Environment, Zhejiang University, Beijing Institute of Technology, China University of Mining and Technology, Huadian Electric Power Research Institute Co., Ltd., China National Petroleum Corporation
Petrochemical Research Institute of Natural Gas Co., Ltd., Clean Energy Technology Research Institute Co., Ltd. of China Huaneng Group, Yuanda Group of State Power Investment Corporation
Environmental Protection Co., Ltd., China Electric Power Engineering Consulting Group East China Electric Power Design Institute Co., Ltd., Zhejiang Baimahu Laboratory Co., Ltd.,
State Energy Jinjie Energy Co., Ltd., State Energy Group Taizhou Power Generation Co., Ltd., and Huazhong University of Science and Technology.
The main drafters of this document are. Chu Jingchun, Xu Dong, Zhao Rui, Yu Xuehai, Zhu Jiangtao, Huang Yan, Wei Yiming, Zhang Xian, Diao Baosheng, Yang Jinning, Wang Tiankun,
Fan Yongsheng, Gu Yongzheng, Qin Chenghua, Wang Tao, Wu Qirong, Feng Lei, Liu Kefeng, Yang Yanmei, Fan Jingli, Xian Yujiao, Zhai Mingyang, Feng Yanlei, Sun Youyuan,
Qi Zhifu, Fan Haidong, Xin Zhikun, Dong Weigang, Liu Shuwei, Liu Tonghao, Xia Qing, Liu Lianbo, Liu Hanming, Zheng Zhaofang, Yang Hechen, Zhao Yongchun, and Liu Fei.
Energy consumption of flue gas carbon dioxide capture system in thermal power plants
Determination technical specifications
1 Scope
This document specifies the technical requirements, test items, test requirements, test
Methods, calculation methods and test reports describe the verification approach.
This document is applicable to the testing and calculation of energy consumption of flue gas chemical absorption carbon dioxide capture system in thermal power plants.
The flue gas adsorption method, gas membrane separation method and other industries’ flue gas carbon dioxide capture systems shall be implemented for reference.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the latest version (including all amendments) applies to this document.
document.
GB/T 8170 Rules for rounding off values and expression and determination of limit values
GB/T 16157-1996 Determination of particulate matter in exhaust gas from stationary sources and sampling methods for gaseous pollutants
GB/T 34060-2017 Steam heat calculation method
GB/T 51316-2018 Flue gas carbon dioxide capture and purification engineering design standard
GB J63-1990 Design specification for electrical measuring instruments for power installations
DL/T 2376 Technical specification for continuous monitoring of flue gas carbon dioxide emissions from thermal power plants
DL/T 5240 Technical specification for design calculation of combustion system of thermal power plant
HJ870-2017 Determination of carbon dioxide in waste gas from stationary pollution sources - Non-dispersive infrared absorption method
HJ1240-2021 Determination of gaseous pollutants (SO2, NO, NO2, CO, CO2) in exhaust gas from stationary pollution sources Portable Fourier
Leaf Transformation Infrared Spectroscopy
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
CO2 capture
The process of separating carbon dioxide from the atmosphere, industry or energy facilities to produce high-concentration carbon dioxide that can be easily transported, stored or used.
3.2
CO2sorbent
Solutions that absorb carbon dioxide.
3.3
The chemical absorbent reacts chemically with the carbon dioxide in the flue gas in the absorption tower to generate compounds, which are then released in the regeneration tower after being heated.
The absorbed carbon dioxide is released to complete the method of separating carbon dioxide from other gases.
[Source. GB/T 51316-2018, 2.0.4]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 45121-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 45121-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 45121-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 45121-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|