HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (17 Jan 2026)
Path: Home > GB/T > Page32 > GB/T 44318-2024                   Home > Standard_List > GB/T > Page32 > GB/T 44318-2024

GB/T 44318-2024 English PDF

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 44318-2024English719 Add to Cart 6 days [Need to translate] Requirements for piggyback payload of lunar and deep space probe Valid GB/T 44318-2024

PDF similar to GB/T 44318-2024


Standard similar to GB/T 44318-2024

GB/T 43223   GB/T 32453   GB/T 44316   GB/T 44319   

Basic data

Standard ID GB/T 44318-2024 (GB/T44318-2024)
Description (Translated English) Requirements for piggyback payload of lunar and deep space probe
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard V70
Classification of International Standard 49.140
Word Count Estimation 36,329
Date of Issue 2024-08-23
Date of Implementation 2024-08-23
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 44318-2024: Requirements for piggyback payload of lunar and deep space probe

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for piggyback payload of lunar and deep space probe Requirements for lunar and deep space exploration ICS 49.140 CCS V 70 National Standard of the People's Republic of China Released on 2024-08-23 2025-03-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... Ⅲ 1 Scope ... 1 2 Normative references ... 1 3 Terms and Definitions ... 1 4 General requirements ... 1 5 Carrying tasks division ... 2 6 Requirements for input files ... 3 7 Onboard Workflow ... 4 8 Interface Security Requirements ... 6 9 Hazard source safety requirements ... 10 Appendix A (Informative) Overall Leak Detection ... 15 Appendix B (Informative) Pressure Vessel Pressure Qualification Test ... 17 Appendix C (Informative) Liquid-proof performance verification test of liquid-sealed electrical connectors ... 18 Appendix D (Informative) Long-term high and low temperature storage test of liquid storage device ... 23 Appendix E (Informative) Battery long-term high and low temperature storage test ... 26

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Technical Committee for Standardization of Aerospace Technology and Its Applications (SAC/TC 425). This document was drafted by. Beijing Space Vehicle General Design Department, Beijing Satellite Environment Engineering Institute, China Aerospace Standardization Research Institute Research Institute. The main drafters of this document are. Chen Liping, Zhang Yan, Wu Xueying, Deng Xiangjin, Peng Song, Li Fei, Gu Zheng, Chen Xiangdong, Shen Zhenrong, Lei Yingjun, Zhang Youwei, Xu Yingqiao, Zhang Haifeng, Quan Haofang, Li Qing, Jia Xiaoyu, Li Ying, Zhu Shunjie, Sheng Liyan. Requirements for lunar and deep space exploration

1 Scope

This document specifies the general requirements, mission division, Requirements for onboard input documents, onboard workflow, interface safety requirements, and possible pressure vessels, batteries, radioactive sources, and propellers. Safety requirements for hazardous sources such as propellants and pyrotechnic devices. This document applies to the mission matching, interface coordination and safety control of the lunar and deep space probe payloads. It is used for reference in carrying on other space vehicles such as global satellites.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document. GB 4075-2009 General requirements and classification of sealed radioactive sources GB/T 15849 Leakage test method for sealed radioactive sources GB/T 26929 Terminology of Pressure Vessels GB/T 29083 Safety requirements for flammable, explosive, toxic substances and radioactive sources in spacecraft GB/T 30114 (all parts) Terminology of space science and its applications GB/T 36176-2018 Vacuum technology Helium mass spectrometry vacuum leak detection method GB/T 44196 Requirements for ground tests of lunar and deep space probes GB/T 44197 Planetary protection requirements for deep space probes

3 Terms and definitions

The terms and definitions defined in GB 4075-2009, GB/T 26929 and GB/T 30114 (all parts) and the following terms and definitions apply to this document. 3.1 piggyback payload of lunar and deep space probe Taking advantage of the weight, space and energy margins of lunar and deep space probes (hereinafter referred to as "probes"), Devices that are independent of the main task completion. 3.2 mandatory inspection point During the development of the payload product, the inspection points for the product process or indicators are determined by the publisher or the detector developer.

4 General requirements

4.1 Basic conditions for carrying The basic conditions for carrying the payload on the probe are as follows. The onboard payload should be reliable and safe and should not affect the implementation and completion of the probe's main mission; a)



Price & Delivery

US$719.00 · In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 44318-2024: Requirements for piggyback payload of lunar and deep space probe
Status: Valid

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 44318-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 44318-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 44318-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 44318-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Refund Policy     Privacy Policy     Terms of Service     Shipping Policy     Contact Information