Path: Home > GB/T > Page30 > GB/T 44169-2024 Home > Standard_List > GB/T > Page30 > GB/T 44169-2024
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 44169-2024 | English | 299 |
Add to Cart
|
3 days [Need to translate]
|
General requirements of ground station for civil large and medium-sized fixed-wing unmanned aircraft system
| Valid |
GB/T 44169-2024
|
PDF similar to GB/T 44169-2024
Standard similar to GB/T 44169-2024 GB/T 36258 GB/T 44166 GB/T 44167
Basic data | Standard ID | GB/T 44169-2024 (GB/T44169-2024) | | Description (Translated English) | General requirements of ground station for civil large and medium-sized fixed-wing unmanned aircraft system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | V35 | | Classification of International Standard | 49.020 | | Word Count Estimation | 14,177 | | Date of Issue | 2024-06-29 | | Date of Implementation | 2025-01-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 44169-2024: General requirements of ground station for civil large and medium-sized fixed-wing unmanned aircraft system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General requirements of ground station for civil large and medium-sized fixed-wing unmanned aircraft system
Civilian large and medium-sized fixed-wing UAV system ground station
common enquiries
General requirements of ground station for civil large and medium-sized fixed-wing
unmanned aircraft system
ICS 49.020
CCS V 35
National Standards of People's Republic of China
Released on 2024-06-29
2025-01-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface ...
1 Scope ...
2 Normative referenced documents ...
3 Terms and Definitions ...
4 General requirements ...
4.1 Function ...
6 Experimental verification ...
6.1 Purpose of Test ...
6.2 Test contents ...
6.3 Verification Method ...
6.4 Test report ...
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting is required.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed and coordinated by the National Technical Committee for Aircraft Standardization (SAC/TC 435).
This document was drafted by. AVIC (Chengdu) UAV Systems Co., Ltd., China Aviation Technology Research Institute, Northwestern Polytechnical University
University, the 54th Institute of China Electronics Technology Group Corporation, and Xi'an Lingkong Electronic Technology Co., Ltd.
The main drafters of this document are. Liu Yin, Shu Zhenjie, Yao Huangwei, Wang Jiuyuan, Ren Jie, Tang Jian, Liu Tao, Hu Yingdong, Yue Jun,
Fu Wenxing, Chen Bei, Xiang Chunqin, Yang Da, Zhang Zejing, Zong Mao, Jia Baojuan, He Wenzhi, Zhao Dou, Xiao Ben.
Civilian large and medium-sized fixed-wing UAV system ground station
common enquiries
1 Scope
This document specifies the general requirements, performance requirements and test verification for ground stations of civil large and medium-sized fixed-wing UAV systems.
This document is applicable to the design, implementation and verification of ground stations for civil large and medium-sized fixed-wing UAV systems.
The face-to-face station shall be implemented accordingly.
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies.
in this document.
GB/T 3482-2008 Lightning test methods for electronic equipment
GB/T 11918.1-2014 Industrial plugs, sockets and couplers Part 1.General requirements
GB/T 38152-2019 Terminology of Unmanned Aircraft Systems
3 Terms and definitions
The terms and definitions defined in GB/T 38152-2019 apply to this document.
4 General requirements
4.1 Functionality
Civilian large and medium-sized fixed-wing UAV systems (hereinafter referred to as "UAV systems") ground stations (hereinafter referred to as "ground stations") generally have
It has the following features.
Monitoring. It can realize comprehensive monitoring of the flight and link of the UAV, and if necessary, it can realize comprehensive monitoring of the UAV payload; a)
Planning and management. It can realize the mission planning and management of the UAV system before and during the mission execution; b)
Situation display. It can realize the comprehensive situation display required by the task and display the situation information input by the external system when necessary; c)
Data processing. It can process and distribute UAV telemetry and remote control data, and can process and distribute take-off and landing guidance data when necessary.
distribution;
d)
Link transmission. It can realize the transmission of UAV telemetry and remote control data, and can also realize the transmission of UAV take-off and landing guidance data when necessary; e)
Information processing. It can realize information processing of payload telemetry data (when there is payload telemetry data), and can realize multi-payload information processing when necessary.
Information fusion processing;
f)
Simulation. Ability to simulate UAV systems when necessary. g)
4.2 Reliability
The reliability index of the ground station should meet the requirements of the reliability index allocation value of the user and the UAV system.
Price & DeliveryUS$299.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 44169-2024: General requirements of ground station for civil large and medium-sized fixed-wing unmanned aircraft system Status: Valid
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 44169-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 44169-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 44169-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 44169-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|