HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 42313-2023 English PDF

US$619.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 42313-2023: Terminology of electrical energy storage system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 42313-2023English619 Add to Cart 6 days [Need to translate] Terminology of electrical energy storage system Valid GB/T 42313-2023

PDF similar to GB/T 42313-2023


Standard similar to GB/T 42313-2023

GB/T 42315   GB/T 42316   GB/T 42312   

Basic data

Standard ID GB/T 42313-2023 (GB/T42313-2023)
Description (Translated English) Terminology of electrical energy storage system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F19
Classification of International Standard 27.180
Word Count Estimation 32,391
Date of Issue 2023-03-17
Date of Implementation 2023-10-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 42313-2023: Terminology of electrical energy storage system

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS27:180 CCSF19 National Standards of People's Republic of China Electric Energy Storage System Terminology Part 1: Vocabulary, MOD) Released on 2023-03-17 2023-10-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface III 1 Scope 1 2 Normative references 1 3 Classification of electric energy storage system 1 4 Technical Requirements for Electric Energy Storage System 3 5 Design and installation of electric energy storage system 11 6 Operation of electric energy storage system 13 7 Environmental impact and safety of electric energy storage system 15 Reference 17 index 19

foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: This document is modified to adopt IEC 62933-1:2018 "Electric Energy Storage System Part 1: Terminology": Compared with IEC 62933-1:2018, this document has made the following structural adjustments: ---3:12:1 corresponds to 3:13:4 in IEC 62933-1:2018; ---4:3:2~4:3:17 correspond to 4:4:1~4:4:16 in IEC 62933-1:2018; ---6:2:4 corresponds to 6:2:6 in IEC 62933-1:2018; ---6:4:1 corresponds to 7:4 in IEC 62933-1:2018; ---6:4:2 corresponds to 7:5 in IEC 62933-1:2018: The technical differences between this document and IEC 62933-1:2018 and their reasons are as follows: --- Modified some terms and definitions (see 3:1, 3:2, 3:10:1, 3:10:2, 3:11:1, 3:11:2, 3:11:3, 3:12:1, 4:1:1, 4:1:2, 4:3, 4:3:7, 4:3:8, 4:3:10, 4:4, 4:4:2, 4:4:3, 4:4:4, 4:4:6, 4:6, 4:6:1, 4:9, 4:10, 4:11, 4:12, 4:12:2, 4:12:3, 4:12:4, 5:1:1, 5:2, 5:2:1, 5:2:2, 5:3, 5:4:2, 6:1:2, 6:1:4, 6:1:5, 6:1:6, 6:1:7, 6:1: 8, 6:2:5, 6:3:1, 6:4:1, 6:4:2, 7:1 and 7:1:2), to be applicable to the use of the industry in our country, to eliminate ambiguity; --- Deleted some terms and definitions (see 3:3, 3:10, 4:4 and 6:2:4 in IEC 62933-1:2018); ---Deleted symbols in some terms: The following editorial changes have been made to this document: ---Change the name of the standard to "Terms for Electric Energy Storage System"; ---Modified some references: Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed by China Electricity Council: This document is under the jurisdiction of the National Electric Energy Storage Standardization Technical Committee (SAC/TC550): This document is drafted by: State Grid Shanghai Electric Power Company, Shanghai Electric Power Design Institute Co:, Ltd:, China Electric Power Research Institute Co:, Ltd:, China Energy Construction Group Guangdong Electric Power Design and Research Institute Co:, Ltd:, State Grid Shandong Electric Power Company Electric Power Research Institute, State Grid Jiangsu Province Electric Power Research Institute of Electric Power Co:, Ltd:, Shanghai Electric Power University, China Southern Power Grid Electric Power Technology Co:, Ltd:, China Southern Power Grid Research Institute Co:, Ltd:, China Southern Power Grid Peak Regulation and Frequency Regulation Power Generation Co:, Ltd: The main drafters of this document: Zhang Yu, Ye Jun, Wei Xinchi, Zhao Xindi, Zhu Zheng, Gao Fei, Ye Chengming, Wang Haojing, Zhou Yu, Meng Yu, Shi Shanshan, Chen Yufeng, Fang Chen, Zhao Binchao, Chen Wensheng, Zhong Guobin, Xu Shouping, Wang Yufei, Shi Mingming, Lei Bo, Li Yongqi, Liu Chun, He Zhipeng, Zhou Min, Hu Zhenkai, Shi Shihong: Electric Energy Storage System Terminology

1 Scope

This document defines the terms of classification, technical requirements, design and installation, operation, environmental impact and safety of electric energy storage systems: This document applies to electrical energy storage systems capable of absorbing, storing and releasing electrical energy from the electrical system:

2 Normative references

This document has no normative references:

3 Classification of electric energy storage systems

3:1 The technology of absorbing, storing, converting and releasing electric energy from the power system by using energy storage medium: 3:2 Consisting of one or more energy storage units, it is a system that can independently realize the functions of electric energy storage, conversion and release: Note: The energy storage power station is composed of one or more electric energy storage systems, capable of storing, converting and releasing electric energy: 3:3 grid-connected The electric energy storage system is connected to the power system: Note: See GB/T 2900:50-2008, 601-01-01 for the definition of power system: 3:4 Low voltage electric energy storage system lowvoltageEESS Electric energy storage system connected to low voltage grid: 3:5 medium voltage electric energy storage system mediumvoltageEESS Electric energy storage system connected to medium voltage grid: 3:6 High voltage electric energy storage system highvoltageEESS Electric energy storage system connected to high voltage grid: 3:7 Residential electric energy storage system residentialEESS The electric energy storage system applied to the residential user side: Note 1: The residential power energy storage system complies with applicable standards such as electromagnetic compatibility of residential equipment: Note 2: See GB/T 2900:87-2011, 617-02-05 for the definition of resident users: 3:8 Electric energy storage system applied to industrial, commercial users or other public activity places:

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 42313-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 42313-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 42313-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 42313-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.