US$569.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41717-2022: Terminology of ageing management and life management for nuclear power plants Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 41717-2022 | English | 569 |
Add to Cart
|
5 days [Need to translate]
|
Terminology of ageing management and life management for nuclear power plants
| Valid |
GB/T 41717-2022
|
PDF similar to GB/T 41717-2022
Basic data Standard ID | GB/T 41717-2022 (GB/T41717-2022) | Description (Translated English) | Terminology of ageing management and life management for nuclear power plants | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F04 | Classification of International Standard | 27.120 | Word Count Estimation | 27,216 | Date of Issue | 2022-10-12 | Date of Implementation | 2023-05-01 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41717-2022: Terminology of ageing management and life management for nuclear power plants---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Terminology of aging management and life management for nuclear power plants
ICS 27.120
CCSF04
National Standards of People's Republic of China
Terminology of aging management and life management in nuclear power plants
Released on 2022-10-12
2023-05-01 implementation
State Administration for Market Regulation
Released by the National Standardization Management Committee
table of contents
Preface I
1 Scope 1
2 Normative references 1
3 Basic terms 1
4 Aging mechanisms and terminology of aging effects 4
5 Aging Management Terminology 11
6 Life Management Terminology 13
Reference 15
index 16
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules for Standardization Documents"
drafting.
Please note that some contents of this document may refer to patents. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed and managed by the National Nuclear Energy Standardization Technical Committee (SAC/TC58).
This document is drafted by. State Nuclear Power Plant Operation Service Technology Co., Ltd., Institute of Nuclear Industry Standardization, Shanghai Nuclear Engineering Research and Design Institute
Co., Ltd., CNNC Nuclear Power Operation Management Co., Ltd., Suzhou Thermal Engineering Research Institute Co., Ltd.
The main drafters of this document. Zhong Zhimin, Dong Xinyu, Wang Donghui, Liang Xueyuan, Shi Xiuqiang, Jiang He, Liu Shangyuan, Liang Bingbing, Li Ling.
Terminology of aging management and life management in nuclear power plants
1 Scope
This document defines commonly used terms related to aging management and life management of nuclear power plants.
This document is applicable to the aging management and life management of nuclear power plants, and can be used as a reference for other nuclear facilities.
2 Normative references
This document has no normative references.
3 Basic terms
3.1
Structures, systems, and components structures, systems, and components; SSCs
Systems, structures, and components systems, structures, and components; SSCs
Systems, Structures and Equipment
A collective term for all elements (items) in a nuclear power plant facility or activity other than human factors.
3.2
Active component activecomponent
active parts
It includes moving parts or components with structural and characteristic changes when performing predetermined functions (5.2).
3.3
passivecomponent
passive parts
Components that do not contain moving parts and do not change in structure and characteristics when performing their intended function (5.2).
3.4
conditions
objective conditions and/or influencing factors that may have an effect on structures, systems and components (3.1)
3.5
Pre-service conditions pre-serviceconditions
Before the initial operation (such as manufacturing, storage, transportation, installation, commissioning and trial operation stage) structures, systems and components (3.1) suffered or experienced
actual conditions (3.4).
3.6
service conditionsserviceconditions
actual conditions (3.4) to which structures, systems and components (3.1) are subjected or experienced during their service life (6.1.4)
Note. Service conditions include operating states (normal operation and expected operating events), accident conditions (design basis accidents and design extension conditions) and post-accident conditions.
Service conditions can be divided into environmental conditions (3.7) and functional conditions (3.8).
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41717-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41717-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41717-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41717-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|