US$459.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40610-2021: Technical specifications for binary description and interchange of power system online power flow data Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 40610-2021 | English | 459 |
Add to Cart
|
5 days [Need to translate]
|
Technical specifications for binary description and interchange of power system online power flow data
| Valid |
GB/T 40610-2021
|
PDF similar to GB/T 40610-2021
Basic data Standard ID | GB/T 40610-2021 (GB/T40610-2021) | Description (Translated English) | Technical specifications for binary description and interchange of power system online power flow data | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F21 | Word Count Estimation | 25,288 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40610-2021: Technical specifications for binary description and interchange of power system online power flow data ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specifications for binary description and interchange of power system online power flow data
ICS 29.020
CCSF21
National Standards of People's Republic of China
Binary description of online power flow data of power system and
Exchange specification
Released on 2021-10-11
2022-05-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 1
5 Binary code 2
6 Model description 2
7 Interactive mode 4
Appendix A (informative) Node branch model 5
Appendix B (informative) Equipment physical model 8
Appendix C (informative) Typical structure of UHV DC system 20
Appendix D (informative) Typical structure of unified power flow controller 21
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446).
Drafting organizations of this document. State Grid Corporation of China National Electric Power Dispatching Control Center, China Electric Power Research Institute Co., Ltd.,
China Southern Power Grid Electric Power Dispatching Control Center, State Grid Jiangsu Electric Power Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd., and Shenzhen Power Supply Bureau have
Co., Ltd., Beijing Kedong Power Control System Co., Ltd., NARI Group Co., Ltd.
The main drafters of this document. Shi Dongyu, Yan Yaqin, Yan Jianfeng, Su Dawei, Zhao Huashi, Jiang Zhengwei, Zhang Zongbao, Wang Yi, Li Junliang, Zhang Wei,
Zhou Huafeng, Chen Guoping, Lang Yansheng, Leng Xiwu, Zhang Lulu, Lu Juanjuan, Song Xuri, Yu Jing, Gao Baocheng, Zhou Jieying, Li Gang, Cui Bo, Lu Guangming,
Ma Xiaochen, Peng Xiaobo, Shan Xin, Tao Hongzhu, Wan Xiong, Zhao Ruina, Chang Naichao, Yu Zhihong, Lu Ying, Jia Yupei, Dai Hongyang, Xie Chang, Gao Bo, Qiu Jian,
Yao Haicheng.
Binary description of online power flow data of power system and
Exchange specification
1 Scope
This document describes the binary coding and interaction method of power system flow data, and specifies general requirements, binary coding, model description
Narrative and interactive mode.
This document is applicable to grid power flow models and calculations that do not involve switching information between power control centers at all levels or between internal application modules.
Data interaction for calculation results. Other application scenarios related to power flow data of the power grid are implemented by reference.
2 Normative references
The content of the following documents constitutes an indispensable clause of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 33603 Power System Model Data Dynamic Message Coding Specification
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Powerflowdata
Describe the operating state data such as voltage and power of various power equipment when the power system is operating in a steady state.
3.2
Powergridmodel
A data collection that meets the application requirements of power grid operation monitoring, control, analysis and calculation, and expresses the attributes and connection relationships of electrical equipment.
3.3
Node branch model nodebranchmodel
A mathematical model established based on the component parameters and the connection mode or topological relationship of the components in the power system.
Note. See Appendix A for details.
3.4
Device physical model devicephysicalmodel
Models describing the internal electrical structure and parameters of various types of equipment.
Note. Including physical bus, generator, load, parallel compensator, series compensator, AC line, transformer, transformer winding, DC system, unified power flow control
Maker and other models. See Appendix B for details.
4 General requirements
The binary description of the power flow data should include the overall description of the model, model index, node branch model, equipment physical model, etc., see the structure
Table A.1.The binary exchange of power flow data should meet the requirements of fast exchange between power system analysis applications in different scenarios.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40610-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40610-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40610-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40610-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|