US$399.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 40600-2021: Technical requirements for dispatching function of wind farm power control system Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 40600-2021 | English | 399 |
Add to Cart
|
4 days [Need to translate]
|
Technical requirements for dispatching function of wind farm power control system
| Valid |
GB/T 40600-2021
|
PDF similar to GB/T 40600-2021
Basic data Standard ID | GB/T 40600-2021 (GB/T40600-2021) | Description (Translated English) | Technical requirements for dispatching function of wind farm power control system | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F21 | Word Count Estimation | 20,256 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 40600-2021: Technical requirements for dispatching function of wind farm power control system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for dispatching function of wind farm power control system
ICS 29.020
CCSF21
National Standards of People's Republic of China
Technical requirements for dispatching function of wind farm power control system
controlsystem
Released on 2021-10-11
2022-05-01 implementation
State Administration of Market Supervision and Administration
Issued by the National Standardization Management Committee
Table of contents
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General requirements 2
5 System scheduling function 3
6 Scheduling function test 5
7 Performance Index 5
Appendix A (informative) Power control system control link 7
Appendix B (Informative) Basic Collection Information Table 8
Appendix C (informative) Example of droop curve of wind farm participating in primary frequency regulation of power grid 12
Appendix D (informative) Wind farm active power, reactive power, voltage, and primary frequency modulation control performance index calculation method 13
Reference 17
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing agency of this document is not responsible for identifying patents.
This document was proposed by the China Electricity Council.
This document is under the jurisdiction of the National Grid Operation and Control Standardization Technical Committee (SAC/TC446).
Drafting organizations of this document. China Electric Power Research Institute Co., Ltd., National Electric Power Dispatching Control Center of State Grid Corporation of China,
State Grid Jilin Province Electric Power Co., Ltd., China Southern Power Grid Power Dispatching Control Center, State Grid Jibei Electric Power Co., Ltd., State Grid East Inner Mongolia
Electric Power Co., Ltd., Inner Mongolia Electric Power (Group) Co., Ltd.
The main drafters of this document. Dong Yu, Qin Shiyao, Dong Cun, Sun Yong, Li Mingjie, Chi Yongning, Zhang Jinping, Miao Fenglin, Chen Guoping, Leng Xiwu,
Hu Yaping, Zhan Xiong, Zhang Xiao, Yang Jian, Liu Yu, Zhang Hao, Zhu Hongtao, Li Shaolin, Li Qing, He Jing, Li Chunyan, Zhang Mei, Zhu Qiongfeng, Fan Yi, Yang Ningning,
Tang Jianfang, Yang Yanxia, Zhang Songtao, Cheng Peng, Hang Chenhui, Li Baoju, Fu Jiyue, Guo Lei, Wang Yao, Xu Bin, Qu Shaojie, Sun Fushou.
Technical requirements for dispatching function of wind farm power control system
1 Scope
This document specifies the basic requirements, configuration and communication information, main
Function, test and performance index requirements.
This document is applicable to new or expanded wind farms connected to the grid through voltage levels of 35kV and above, and can be used for system design, development, and entry
Network function selection, etc.
2 Normative references
The contents of the following documents constitute the indispensable clauses of this document through normative references in the text. Among them, dated quotations
Only the version corresponding to that date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to
This document.
GB/T 19582.1 Industrial Automation Network Specification Based on Modbus Protocol Part 1.Modbus Application Protocol
GB/T 19963 Technical Regulations for Connecting Wind Farms to Power Systems
GB/T 36050 Basic Regulations for Time Synchronization of Power System
GB/T 36572 Electric Power Monitoring System Network Security Protection Guidelines
DL/T 634.5101 Telecontrol Equipment and System Part 5-101.Supporting Standards for Basic Telecontrol Tasks of Transmission Protocol
DL/T 634.5104 Telecontrol equipment and system Part 5-104.Transmission protocol adopts IEC 60870- standard transmission protocol set
5-101 network access
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Wind farm automatic generation control windfarmautomaticgenerationcontrol
According to the real-time control commands (or preset target commands) of the power grid and the output characteristics of the wind turbines, the active power of the wind turbines is reasonably allocated to achieve
The active power of the wind farm is automatically closed-loop control, so that the active power output of the wind farm can meet the control requirements of the power grid.
3.2
Wind farm primary frequency control
When the frequency of the power system deviates from the specified frequency modulation dead zone, the wind farm quickly and automatically adjusts the active power to respond to the change of the grid frequency and maintain
Support the control function of stable grid frequency.
3.3
Wind farm power control system windfarmpowercontrolsystem
Through direct control of wind turbines and reactive power compensation devices, automatic power generation control, primary frequency modulation control and reactive voltage of wind farms are realized
Control and other functions of the system.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 40600-2021_English be delivered?Answer: Upon your order, we will start to translate GB/T 40600-2021_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 40600-2021_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 40600-2021_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|